Council archive · source document
20150426 - Stormwater Drainage and Management Plan · 132007.2062
Attached to the e-mail OPW16/0050 - Operational Works Application 1 of 2.
Plans and drawings: the text below has words only, no drawings.
an SEDIMENT & EROSION CONTROL NOTES Erosion and sediment control devices shall be installed and maintained in 9. The underground drainage system shall be used to convey runoff throughout accordance with these drawings unless an alternative proposal is approved in construction. All drainage pits shall be constructed prior to placement of writing by the superintendent. Additional erosion and sediment controls shall sub-base material and shall contain a suitable cut-out to capture run-off from also be installed as necessary during construction. base of boxing during construction. All erosion and sedimentation control devices shall be installed prior to 10. The underground drainage system including all pits, pipes and GPT shall be stripping topsoil or commencing earthworks anywhere else on site unless cleaned of sediment prior to on maintenance. Unless otherwise approved by otherwise approved by the superintendent. An inspection hold point is the Superintendent all temporary erosion and sediment control measures required at this point prior to the works proceeding. shall be removed at the completion of construction. Where erosion and sediment control devices cannot be installed due to 11. However such removal shall not proceed until the site is stabilised to the earthworks or other work operations, they shall be installed at the earliest Superintendent's satisfaction. possible date. 12. All construction vehicles shall be cleaned of mud and/or loose dirt prior to Permanent coverage of disturbed areas with topsoil and turf, hydromulch or leaving the site. mulch (and jute matting if required) is to be undertaken at the earliest 13. No release, or flow is permitted from the site, throughout the earthworks and practical time. Turf shall be laid behind kerb and channel for full verge width. construction period, to any waterway, or stormwater drain or drainage line leading to a waterway or area of native vegetation, unless the level of total In order to prevent erosion from concentrated flow paths, the contractor shall suspended solids does not exceed a concentration of 50 milligrams per litre. follow the following site protection principles: - Install turf in permanent open drain; 14 An effective water quality self-monitoring program, including at least one representative measurement of the total suspended solids quality of any flow - Install geofabric in temporary open drains where shown on drawing; or release from the site on each day runoff to water occurs, must be - Install sand bags, rock check dams or mulch bunds at 20m centres in all implemented continuously throughout the life of the works which are the concentrated flow paths including cut-off drains along kerb and channel, subject of this approval. Where the findings of the required performance along sediment fences, mulch or earth bunds except where drains are lined self-monitoring program indicate that the 50mg/L TSS compliance limit is being with turf or geofabric. or is likely to be exceeded, remedial action must be taken without delay to All disturbed areas shall be covered with 100mm of topsoil prior to turfing, ensure ongoing compliance. seeding, hydromulching or mulching. All batters 1 on 4 and steeper shall be tined to a depth of 200mm in 15. Sufficient stockpiles of mulch and/or other similar required erosion and sediment control materials and stores must be maintained on site at all times accordance with Main Roads specifications prior to topsoiling and mulching to enable ongoing erosion control, as well as site contingencies e.g. imminent (75mm thick). Batters steeper than 1 on 2 shall also have heavy duty jute wet weather, to be dealt with, until commencement of on maintenance. matting installed over the mulch. all other disturbed areas shall be covered with hydromulch. LEGEND agi e FWG a GP1 oa Existing storm water Storm Water Drainage Agi Drain Floor Waste gully Gully Pit Sediment Fence -—_—-o Boundary @ Diameter C.0.8. Cleanout to surface Een Eccentric Enlarger FFL Finished floor level GP. Gully pit GMH Gully Man Hole IC Inspection Chamber IL Invert Level K&C Kerb & Channel MH Manhole PO Planter outlet RPB Real Property Boundary RPD Real Property description RWO Rain water outlet RWH Rain water head SL Surface Level Sq Square SWD Storm water drain Tat Trench grate transverse bar TG(I) Trench grate longitudinal bar u/g Underground u/s Under slab u.n.o. Unless noted otherwise Task ISSUES EROSION & SEDIMENT CONTROL STORMWATER QUALITY PERFORMANCE MINIMIZE SOIL EROSION SITE DURING AVOID DETRIMENTAL IMPACT ON THE WATER QUALITY AND AQUATIC ENVIRONMENT OF DOWNSTREAM WATER CONSTRUCTION AND REHABILITATION STAGES BODIES AS A RESULT OF DISCHARGE OF CONTAMINATED STORMWATER RUNOFF FROM CONSTRUCTION WORKS AND AT ALL TIMES PREVENT THE TRANSPORT AND COMPLY WITH THE ENVIRONMENTAL ACT ON ENVIRONMENTAL PROTECTION POLICY FOR WATER. OF SEDIMENT FROM THE SITE. MANAGEMENT e INSTALL THE CONTROL DEVICES AND ¢ COMPLY WITH THE ENVIRONMENTAL PROTECTION ACT AND ENVIRONMENTAL PROTECTION POLICY (WATER) STRATEGY FOLLOW THE STABILIZATION PROCEDURES e ALL CONTROL MEASURES SHALL BE IN PLACE PRIOR TO COMMENCING SITE STRIPPING. DESCRIBED ON PLANS. e CONSTRUCTION MATERIALS AND STOCKPILES STORED ON SITE SHALL BE PLACE IN PREPARED LOCATIONS, e LIMIT THE EXTENT OF STRIPPING TO THE AND PROTECTED AS SHOWN. STAGE AREA PRESENTLY UNDER e FUELS AND OILS SHALL BE SAFELY STORED TO AVOID INUNDATION. ANY SPILLAGES WITHIN THESE CONSTRUCTION. COMPOUNDS SHALL BE IMMEDIATELY ATTENDED TO SO AS TO LIMIT THE POTENTIAL FOR IMPACT e ALL MUD AND SILT DEPOSITED ON THE OFF-SITE. ADJACENT ROADWAY SHALL BE REMOVED e PROVIDE CONTROL MEASURES TO PREVENT SOIL EROSION , SCOURING, SEDIMENT TRANSPORT AND BY SWEEPING. DEPOSITION. THESE MEASURE ARE IDENTIFIED IN THE SOIL & EROSION CONTROL PLAN BUT MAY BE e¢ PROTECT STORMWATER DRAINAGE INLETS EXTENDED AS REQUIRED AND MAY INCLUDE: AS SHOWN BELOW UNTIL THE SITE HAS — TEMPORARY RETARDATION BASIN BEEN STABALIZED. — TEMPORARY SILT FENCE e¢ WASH FROM EXPOSED AGGREGATE — DIVERSION OF UPSTREAM CATCHMENT AROUND DISTURBED AREAS CONCRETING SHALL BE WHOLLY e IN AREAS WHERE RUNOFF TURBIDITY IS TO BE CONTROLLED, EXPOSED SURFACES SHALL BE MULCHED CONTAINED ON SITE. CEMENT RESIDUE OR STABILIZED WITH TURF IF EARTHWORKS ARE EXPECTED TO EXTEND FOR THAT TWO WEEKS. SHALL BE ALLOWED TO DRY THEN e PERMANENT CONTROL MEASURES WILL BE IN PLACE UPON COMPLETION OF CONSTRUCTION, HOWEVER REMOVED FROM SITE. MAINTENANCE WILL BE REQUIRED OF SOME TEMPORARY FACILITIES UNTIL FULL SITE REHABILITATION HAS BEEN ACHIEVED. MONITORING THE PRINCIPAL CONTRACTOR SHALL AT ALL THE PRINCIPAL CONTRACTOR SHALL ENSURE NO SUSPENDED SOLIDS OR CONTAMINANTS ARE VISIBLE IN TIMES ENSURE THAT CONTROL DEVICES ARE SURFACE RUNOFF LEAVING THE SITE. CORRECTLY INSTALLED AND ADEQUATELY MAINTAINED, IN PARTICULAR PRIOR TO FORECAST PERIODS OF RAIN OR STORMS. CORRECTIVE e¢ EMPTY AND REPAIR TRAPS REGULARLY. ACTIONS e REPAIR OR REPLACE DAMAGED CONTROL e REPAIR OR EXTEND CONTROL DEVICES TO OPERATE ADEQUATELY. DEVICES. e INSTALL ADDITIONAL SEDIMENTS TRAPS TO RETARD SURFACE RUNOFF ACROSS THE WORKS AREA. e PLACE ADDITIONAL CONTROL DEVICES WHERE EXISTING INSTALLATIONS ARE INADEQUATE. REPORTING WEEKLY REPORTS BY THE PRINCIPAL CONTRACTOR TO THE CONSULTANT DETAILING WEEKLY REPORTS BY THE CONTRACTOR TO THE CONSULTANT OUTLINING THE EFFECTIVENESS OF CONTROL MAINTENANCE PROGRAM, ADDITIONAL WORKS MEASURES AND DETAILS OF ANY CORRECTIVE ACTIONS TAKEN AND THE PERFORMANCE OF CONTROL MEASURES. SEDIMENT & EROSION MANAGMENT PLAN Prior to the commencment of any construction activities the following measures shall be incorporated: SEDIMENT AND EROSION CONTROL MANAGEMENT PLAN: e Provide education of site personnel e Set up action plans as a precaution in case of disturbances occuring © OBJECTIVE: especially after an unexpected strong rainfall event To minimise erosion on site and ensure sediment is not washed down to the receiving waterways due to construction e Provide regular inspection and maintenance of all structures including the DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED activities FOR ASSESSMENT, TENDERING AND CONSTRUCTION. temporary structures. ¢ LEGISLATION: [Amd Description Date Environment Protection Act 1994 Environmental Protection Water Policy 1997 The Integrated Planning Act 1997 e RESPONSIBILITY: The responsibility for all measures regarding the sediment and erosion control during construction shall be with the CONTRACTOR. The contractor shall appoint one staff member, ideally the foreman to be responsible for: *the location of drain paths such as swales and trenched, cut off swales, catch drains and perimeter banks. All of NOTES FOR STOcKeLING en THE CONTRACTOR SHALL PROVIDE A these measures shall ensure the runoff is directed to the sedimentation basin during construction. PLAN FOR STOCKPILING, MATERIALS STORAGE AND WASTE **the waste and wash down of materials and goods in particular concrete and cement shall be separated, set to dry MANAGEMENT. THIS PLAN MAY BE A HAND DRAWN SKETCH BUT wend disposed of _ . SHALL BE VISIBLEY PLACED IN THE SITE OFFICE. installation and maintenance of the sediment control fences all around the perimeter as shown in plan ADVICE: *“control of fences, sandbags and bales as well as the sedimentation basin after each rainfall event ° - LOCATE STOCK PILES ON LEVEL GROUND AWAY *“control of the entry/exit path and the minimization of sediment transfer to the street in particular control of concrete FROM AREAS SUBJECT TO CONCENTRATED Issue Notes Date and earthmoving vehicles OVERLAND FLOW. For Development Approval Tsupervise other members of staff and lead by example | —- . CONSTRUCT A PERMENENT BANK OR CATCH DRAIN For Building Approval x 01-03-16 *“ensure enough litter collection devices are provided for the collection of daily litter such as cans, bottles, paper, ABOVE STOCK PILE TO PROTECT IT FROM UPHILL butts and also building material cut off's. RUNOFF. For Tender **“ensure all stockpiles for both incoming and outgoing goods in particular soils and sands are clearly marked and not . CONSTRUCT A SEDIMENT FENCE BELOW THE For Construction blocking drain paths and kept neat and clean. STOCKPILE TO TRAP SEDIMENTS BEING WASHED ***control the flow path of stormwater at all times during construction and use swales, sandbags, bales and other OFF THE PILE As Constructed measures to ensure the runoff is directed to the sedimentation basin at all times. . PROVIDE ACCESS TO STOCKPILE FROM SIDE SO AS TO AVOID RUNOFF PASSING THROUGH. e ACTIONS: In case of major rainfall events the following action plan shall be followed and responsibly looked after by the CONTRACTOR: . CUT—OFF DRAIN ALONG CONTOUR — LONG TERM PLASTIC SHEET WHEN RAIN OR nat raulic = ***DON'T WAIT UNITL IT IS TOO LATE! STOCKPILES ONLY (GRADE AT 1 IN 100 max. TO FREE HIGH WINDS ARE EXPECTED. y V be on site during the rainfall period and monitor the drain paths. Redirect where required. OUTLET.) STABILIZE ALL EARTHWORKS AREAS WITH TURF. “check the fences after every rainfall and replace the fences where required. Check and replace all barriers, V— bales, sandbags and temporary swales, cut off drains and trenches where required. CONTACT: Rein ho | d Koe nn i n MiEAust RPEQ No 7023 **clean out sedimentation material as soon as the moisture content allows it. FLOW ~ BO Box 181 g “check the receiving pit and improve the barriers if required. KG SS Moffat B h wee . RRRRRRRRR A < . joffa each, QLD, 4551 REMEMBER: EACH RAINFALL IS THE EVENT TO ACTIVELY WATCH AND CONTROL THE RUNOFF! RRR, Via VOR 7 email: [email protected] SES SWIG RINSE PH: (07) 5491 4333 Y CLIENT : SEDIMENT FENCE AS SPECIFIED ALONG CONTUR (EXTEND 3m min. EACH SIDE OF STOCKPILE. CONNECTIVITY P/L DESIGNER: STOCKPILES \ DES CRAWFORD J 1. PLACE STOCKPILES 5m min. UPSTREAM OF EXISTING VEGETATION, (PROJECT: 31 CORSAIR CRESCENT Y CONCENTRATED WATER FLOW, ROADS, AND HAZARD AREAS. SUNRISE BEACH 2. CONSTRUCT ALONG THE CONTOUR AS LOW, FLAT, ELONGATED DUPLEX MOUNDS (2m max. HEIGHT.) DRAWING TITLE: STORMWATER J DRAINAGE AND ) MANAGEMENT PLAN Design Ae. Checked (Ch Dote 01-03-16 Dwg. No. AMD. SCALE: 1 : 100 ON At UNO. 4 Of 4 3105-4 J RPD:— LOT 219 RP 135364
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20150426 - Stormwater Drainage and Management Plan.pdfRelated documentApplication case desk ↗
20150426 - Stormwater Drainage and Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.