Skip to the record
The only place to find full transcripts.

Council archive · source document

20150426 - Stormwater Drainage and Management Plan · 132007.2062

Attached to the e-mail OPW16/0050 - Operational Works Application 1 of 2.

of 8

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
 

 

@225uPVC TO EXISTING cave

POINT OF DISCHARGE:
IL22.650 STORMWATER MANHOLE
CORE DRILL EXISTING

MANHOLE AND SEAL WITH

NON SHRINK GROUT.

NOTE:
ALL EXISTING SERVICES HAVE BEEN
FROM AXIS SURVEY DRAWINGS.

PLOTTED

 

PROVIDE 450sq FIELD
INLET WITH GRATED LID \©@
SL23.950
1L22.950

/

1.22.050-”|

 

Q
Zz
<
_t

PROVIDE 4506q FIELD ———— |
INLET WITH (GRATED LID
SL23.950 <<
1L23.150 4

 

Approximate Sewer Line Location

 

App

| Approx,

 

9150 FROM ROOF CATCHMENT.
: Lo PROOF SCREENING
OO)

ay

25 SLOW LEAK FOR PEAK

 

FLOW MITIGATION. DISCHARGE
TO OVERFLOW PIPE.

 

 

 

THE INSTALLATION OF THE
SLOW LEAK NEEDS TO BE A
FIXED, SEALED PIPE. NO
VALVE IS PERMITTED!

 

 

 

 

 

 

=
D
3
2,500 LITRE RETENTION VOLUME—————=} .
3
£
NOTE:

=
Dp
3
2,500 LITRE HARVESTING VOLUME—————+} *
£

5 2 7 a 2 5 = = 7 4 4 «

. 4 44'4 ¢ « :

a, x . + “ea aa . oa, ot ‘a

 

 

 

—_———#150 OVERFLOW TO
STORMWATER
DRAINAGE SYSTEM

Oo

D gy

ct vy
pay auncd
NVoeUz= 2s
oY’ str Os
KX & © Ir
Lj ©

NOTE:

A MINIMUM OF 80% OF THE ROOF
CATCHMENT AREA SHALL BE DIRECTED TO
THE TANK. BETTER IS IF 100% CAN BE
DIRECTED TO THE TANK.

FOR ALL DETAILS OF ROOF DESIGN,

 
       

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

PROVIDE 450sq FIELD
INLET WITH HEAVY DUTY,
CLASS D GRATE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

   

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6150 GUTTERS AND DOWNPIPES REFER TO BA 9150. SL28.100
DESIGN DRAWINGS 1L27.100
" BOs Se a Boe
TIMBER SLEEPER RETAINING WALL garden
BUILDER TO DETERMINE EXTENT
OF RETAINING WALL, ON SITE |
path |
6150 \] RETAINING WALL |
ie_timber retain
wall l
I rere
25. Lie FFL a,
roy oe To? OF ifs @-# 150 ops 8.109
cl fy ape
utility roo ]
bed. 3 ° 200
terrace & Friz8 S
#150 NN
AL PROVIDE COMBINED x —_
10 B bed. 2 STORMWATER r ‘
ct f| RETENTION/HARVESTING Y
4 up || TANK AS PER <
; m 7 DETAILED DESIGN
1800mm HIGH CEMENT bs
RENDERED BLOCK FENCE } oo a ty ri28-500
oy
] a a
MM = ~
terrace bed. 2 PROVIDE COMBINED
: STORMWATER
#150 terrace RETENOR AMR veESTING
YO bed. 3 KAS PER
RL25.3 : DETAILED DESIGN ley
L150
oa ~~ a cP4
me Py ert
Z ht
|e ne!
pool é timber “| |
garden wal | RETAINI |
a x
al Gath roe? | path |
#150) 3 26.425 ||
i imber retaining iz | |

 

 

 

 

proximate. House
Plotted
From Records

NOTE:

A MINIMUM OF 80% OF THE ROOF
CATCHMENT AREA SHALL BE DIRECTED TO
THE TANK. BETTER IS IF 100% CAN BE
DIRECTED TO THE TANK.

FOR ALL DETAILS OF ROOF DESIGN,
GUTTERS AND DOWNPIPES REFER TO BA

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

rox, Invert Level ee DESIGN DRAWINGS
23.49 m KS*
0.69 deep
~ 12 ——— NO RETENTION
oO
a WITH RETENTION
gs L ~
E a XN
a ~
= 4
a 7 ~
0 T ! T T TT
2 4 6 8 10 12 14 16 18
TIME (MINS.)
STORMWATER HYDROGRAPH THROUGH THEORETICAL SINGLE SITE TANK
PEAK FLOW MITIGATION THROUGH ON SITE RETENTION TANK
CALCULATIONS FOR TOTAL SITE USING
ACCUMULATED CATCHMENT AREAS AND
ONE SINGLE TANK
~ 6 — —— NO RETENTION
oO
a WITH RETENTION
2 Z +
fe N
z 2 —
Z Z “N
pee
0 T I T TT
2 4 6 8 10 12 14 16 18
TIME. (MINS.)

STORMWATER HYDROGRAPH THROUGH PROPOSED INDIVIDUAL TANK
PEAK FLOW MITIGATION THROUGH ON SITE RETENTION TANK

 

 

CALCULATIONS FOR "ONE HALF” PER

UNIT USING INDIVIDUAL CATCHMENT
AREAS AND INDIVIDUAL TANK
ASSEMBLEYS.

@25 SLOW LEAK REQUIRED.

  

PROVIDE 450sq FIELD
INLET WITH HEAVY DUTY,
CLASS D GRATE
SL28.100

1L27.100

777

4

TOTAL PROPOSED TANK VOLUME:
TANK FOR RETENTION:
TANK FOR HARVESTING:

RUNOFF & DETENTION CALCULATIONS:

MAXIMUM EVENT:

TIME OF CONCENTRATION:
INTENSITY:

SITE AREA:

IMPERVIOUS AREA:

PRE DEVELOPMENT PEAK RUNOFF:
PEAK RUNOFF POST DEVELOPMENT:

RETENTION VOLUME REQUIRED:
RETENTION VOLUME PROVIDED:

REDUCTION REQUIRED:

REDUCTION PROVIDED:

 

5,000 LITRES
5,000 LITRES

Q100

Smin
326mm/hr
608sqm
351sqm

48L/s
52L/s (NO RETENTION)

2,640 LITRE
5,000 LITRE

4L/s
8L/s

CEN

LC ReS

a

Corsa

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED

FOR ASSESSMENT, TENDERING AND CONSTRUCTION.
[Amd Description Date

Issue Notes Date

For Development Approval
For Building Approval x [01-03-16
For Tender
For Construction
As Constructed

 

 

 

 

E Hydraulic 3:

 

\-

PO Box 181

Moffat Beach, QLD, 4551
email: [email protected]
PH: (07) 5491 4333

contact: Reinhold Koenning MiEAust RPEQ No 7023

N

 

CLIENT :
CONNECTIVITY P/L

 

DESIGNER:
iS DES CRAWFORD

 

(PRouect: 31 CORSAIR CRESCENT
SUNRISE BEACH
DUPLEX

A

 

DRAWING TITLE:

STORMWATER
DRAINAGE AND
MANAGEMENT PLAN

iY

 

 

Design RH, Checked | Cro [Date 01-03-16 | Dwg. No.

 

2 of 4

: 100 ON At U.N.O.

 

 

XY SCALE : 1

3105-2 J

AMD.

 

 

 

RPD:— LOT 219 RP 135364

 

 

Used in these records

About this file

File size
4.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

20150426 - Stormwater Drainage and Management Plan.pdf · 4.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.