Council archive · source document
20150426 - Stormwater Drainage and Management Plan · 132007.2062
Attached to the e-mail OPW16/0050 - Operational Works Application 1 of 2.
Plans and drawings: the text below has words only, no drawings.
@225uPVC TO EXISTING cave
POINT OF DISCHARGE:
IL22.650 STORMWATER MANHOLE
CORE DRILL EXISTING
MANHOLE AND SEAL WITH
NON SHRINK GROUT.
NOTE:
ALL EXISTING SERVICES HAVE BEEN
FROM AXIS SURVEY DRAWINGS.
PLOTTED
PROVIDE 450sq FIELD
INLET WITH GRATED LID \©@
SL23.950
1L22.950
/
1.22.050-”|
Q
Zz
<
_t
PROVIDE 4506q FIELD ———— |
INLET WITH (GRATED LID
SL23.950 <<
1L23.150 4
Approximate Sewer Line Location
App
| Approx,
9150 FROM ROOF CATCHMENT.
: Lo PROOF SCREENING
OO)
ay
25 SLOW LEAK FOR PEAK
FLOW MITIGATION. DISCHARGE
TO OVERFLOW PIPE.
THE INSTALLATION OF THE
SLOW LEAK NEEDS TO BE A
FIXED, SEALED PIPE. NO
VALVE IS PERMITTED!
=
D
3
2,500 LITRE RETENTION VOLUME—————=} .
3
£
NOTE:
=
Dp
3
2,500 LITRE HARVESTING VOLUME—————+} *
£
5 2 7 a 2 5 = = 7 4 4 «
. 4 44'4 ¢ « :
a, x . + “ea aa . oa, ot ‘a
—_———#150 OVERFLOW TO
STORMWATER
DRAINAGE SYSTEM
Oo
D gy
ct vy
pay auncd
NVoeUz= 2s
oY’ str Os
KX & © Ir
Lj ©
NOTE:
A MINIMUM OF 80% OF THE ROOF
CATCHMENT AREA SHALL BE DIRECTED TO
THE TANK. BETTER IS IF 100% CAN BE
DIRECTED TO THE TANK.
FOR ALL DETAILS OF ROOF DESIGN,
PROVIDE 450sq FIELD
INLET WITH HEAVY DUTY,
CLASS D GRATE
6150 GUTTERS AND DOWNPIPES REFER TO BA 9150. SL28.100
DESIGN DRAWINGS 1L27.100
" BOs Se a Boe
TIMBER SLEEPER RETAINING WALL garden
BUILDER TO DETERMINE EXTENT
OF RETAINING WALL, ON SITE |
path |
6150 \] RETAINING WALL |
ie_timber retain
wall l
I rere
25. Lie FFL a,
roy oe To? OF ifs @-# 150 ops 8.109
cl fy ape
utility roo ]
bed. 3 ° 200
terrace & Friz8 S
#150 NN
AL PROVIDE COMBINED x —_
10 B bed. 2 STORMWATER r ‘
ct f| RETENTION/HARVESTING Y
4 up || TANK AS PER <
; m 7 DETAILED DESIGN
1800mm HIGH CEMENT bs
RENDERED BLOCK FENCE } oo a ty ri28-500
oy
] a a
MM = ~
terrace bed. 2 PROVIDE COMBINED
: STORMWATER
#150 terrace RETENOR AMR veESTING
YO bed. 3 KAS PER
RL25.3 : DETAILED DESIGN ley
L150
oa ~~ a cP4
me Py ert
Z ht
|e ne!
pool é timber “| |
garden wal | RETAINI |
a x
al Gath roe? | path |
#150) 3 26.425 ||
i imber retaining iz | |
proximate. House
Plotted
From Records
NOTE:
A MINIMUM OF 80% OF THE ROOF
CATCHMENT AREA SHALL BE DIRECTED TO
THE TANK. BETTER IS IF 100% CAN BE
DIRECTED TO THE TANK.
FOR ALL DETAILS OF ROOF DESIGN,
GUTTERS AND DOWNPIPES REFER TO BA
rox, Invert Level ee DESIGN DRAWINGS
23.49 m KS*
0.69 deep
~ 12 ——— NO RETENTION
oO
a WITH RETENTION
gs L ~
E a XN
a ~
= 4
a 7 ~
0 T ! T T TT
2 4 6 8 10 12 14 16 18
TIME (MINS.)
STORMWATER HYDROGRAPH THROUGH THEORETICAL SINGLE SITE TANK
PEAK FLOW MITIGATION THROUGH ON SITE RETENTION TANK
CALCULATIONS FOR TOTAL SITE USING
ACCUMULATED CATCHMENT AREAS AND
ONE SINGLE TANK
~ 6 — —— NO RETENTION
oO
a WITH RETENTION
2 Z +
fe N
z 2 —
Z Z “N
pee
0 T I T TT
2 4 6 8 10 12 14 16 18
TIME. (MINS.)
STORMWATER HYDROGRAPH THROUGH PROPOSED INDIVIDUAL TANK
PEAK FLOW MITIGATION THROUGH ON SITE RETENTION TANK
CALCULATIONS FOR "ONE HALF” PER
UNIT USING INDIVIDUAL CATCHMENT
AREAS AND INDIVIDUAL TANK
ASSEMBLEYS.
@25 SLOW LEAK REQUIRED.
PROVIDE 450sq FIELD
INLET WITH HEAVY DUTY,
CLASS D GRATE
SL28.100
1L27.100
777
4
TOTAL PROPOSED TANK VOLUME:
TANK FOR RETENTION:
TANK FOR HARVESTING:
RUNOFF & DETENTION CALCULATIONS:
MAXIMUM EVENT:
TIME OF CONCENTRATION:
INTENSITY:
SITE AREA:
IMPERVIOUS AREA:
PRE DEVELOPMENT PEAK RUNOFF:
PEAK RUNOFF POST DEVELOPMENT:
RETENTION VOLUME REQUIRED:
RETENTION VOLUME PROVIDED:
REDUCTION REQUIRED:
REDUCTION PROVIDED:
5,000 LITRES
5,000 LITRES
Q100
Smin
326mm/hr
608sqm
351sqm
48L/s
52L/s (NO RETENTION)
2,640 LITRE
5,000 LITRE
4L/s
8L/s
CEN
LC ReS
a
Corsa
DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED
FOR ASSESSMENT, TENDERING AND CONSTRUCTION.
[Amd Description Date
Issue Notes Date
For Development Approval
For Building Approval x [01-03-16
For Tender
For Construction
As Constructed
E Hydraulic 3:
\-
PO Box 181
Moffat Beach, QLD, 4551
email: [email protected]
PH: (07) 5491 4333
contact: Reinhold Koenning MiEAust RPEQ No 7023
N
CLIENT :
CONNECTIVITY P/L
DESIGNER:
iS DES CRAWFORD
(PRouect: 31 CORSAIR CRESCENT
SUNRISE BEACH
DUPLEX
A
DRAWING TITLE:
STORMWATER
DRAINAGE AND
MANAGEMENT PLAN
iY
Design RH, Checked | Cro [Date 01-03-16 | Dwg. No.
2 of 4
: 100 ON At U.N.O.
XY SCALE : 1
3105-2 J
AMD.
RPD:— LOT 219 RP 135364
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20150426 - Stormwater Drainage and Management Plan.pdfRelated documentApplication case desk ↗
20150426 - Stormwater Drainage and Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.