20150426 - Stormwater Drainage and Management Plan · 132007.2062
Attached to the e-mail OPW16/0050 - Operational Works Application 1 of 2.
Plans and drawings: the text below has words only, no drawings.
Oo
SEDIMENT & EROSION CONTROL NOTES
Erosion and sediment control devices shall be installed and maintained in 9. The underground drainage system shall be used to convey runoff throughout
accordance with these drawings unless an alternative proposal is approved in construction. All drainage pits shall be constructed prior to placement of TASK AES | FROSION & SEDIMENT CONTROL STORMWATER QUALITY
writing by the superintendent. Additional erosion and sediment controls shall sub-base material and shall contain a suitable cut-out to capture run-off from PERFORMANCE MINIMIZE SOIL EROSION SITE DURING AVOID DETRIMENTAL IMPACT ON THE WATER QUALITY AND AQUATIC ENVIRONMENT OF DOWNSTREAM WATER
also be installed as necessary during construction. base of boxing during construction. AND AT ALL "INES PREVENT THE TRANSPORT | AND COMPLY WITH THE ENVIRONMENTAL ACT ON ENVIRONMENTAL PROTECTION POLICY FOR WATER.
All erosion and sedimentation control devices shall be installed prior to 10. The underground drainage system including all pits, pipes and GPT shall be —_ eee
stripping topsoil or commencing earthworks anywhere else on site unless cleaned of sediment prior to on maintenance. Unless otherwise approved by Siratecy |” FOLLOW THE STABILZATON PRoceDURES | ALL CONTROL MEASURES. SHALL. BE IN. PLAGE. PRIOR TO COMMENCING SITE STRPPING. Yn
otherwise approved by the superintendent. An inspection hold point is the Superintendent all temporary erosion and sediment control measures . Pear THE ESTENT OF STRIPPING 40 THE . OND PROSE OID AS SHOWN STOCKPILES STORED ON SITE SHALL BE PLACE IN PREPARED LOCATIONS,
required at this point prior to the works proceeding. shall be removed at the completion of construction. CONSTRUCTION. * COMPOUNDS SHALL BE IMMEDIATELY ATTENDED TO S0 AS TO LIMIT THE POTENTIAL FOR IMPACT
Where erosion and sediment control devices cannot be installed due to 11. However such removal shall not proceed until the site is stabilised to the * ADJACENT ROADWAY SHALL. BE. REMOVED «PROVIDE CONTROL MEASURES TO PREVENT SOIL EROSION , SCOURING, SEDIMENT TRANSPORT AND
earthworks or other work operations, they shall be installed at the earliest Superintendent's satisfaction. «PROTECT STORMWATER DRAINAGE INLETS EXTENDED AS. REQUIRED AND MAY INCLUDE: ne ROS ON CONTROL PLAN BUT MAY BE
possible date. 12. All construction vehicles shall be cleaned of mud and/or loose dirt prior to BEEN STABLE NTE SITE BAS 7 TEMPORARY, RETARDATION BASIN
Permanent coverage of disturbed areas with topsoil and turf, hydromulch or leaving the site. * CONCRETING SHALL BE WHOLLY «IN AREAS WHERE_RUNOFF. TURBIDITY IS 10 BE CONTROLLED, EXPOSED SURFACES SHALL BE MULCHED
mulch (and jute matting if required) is to be undertaken at the earliest 13. No release, or flow is permitted from the site, throughout the earthworks and SHALL BE ALLOWED 10 DRY THEN. «PERMANENT CONTROL. MEASURES WILL BS IN PLACE UPON COMPLETION OF CONSTRUCTION, HOWEVER
practical time. construction period, to any waterway, or stormwater drain or drainage line REMOVED FROM SITE. BAN ACHIEVED” BE REQUIRED OF SOME TEMPORARY FACILITIES UNTIL FULL SITE REHABILITATION HAS
Turf shall be laid behind kerb and channel for full verge width. leading to a waterway or area of native vegetation, unless the level of total MONITORING THE PRINCIPAL CONTRACTOR SHALL AT ALL THE PRINCIPAL CONTRACTOR SHALL ENSURE NO SUSPENDED SOLIDS OR CONTAMINANTS ARE. VISIBLE. IN
In order to prevent erosion from concentrated flow paths, the contractor shall suspended solids does not exceed a concentration of 50 milligrams per litre. CORRECTLY INSTALLED AND ADEQUATELY SURFACE RONOFE TENING THE STE:
follow the following site protection principles: 14 Aneffective water quality self-monitoring program, including at least one FORECAST PERIODS OF RAIN OR STORMS.
- Install turf in permanent open drain; representative measurement of the total suspended solids quality of any flow
- Install geofabric in temporary open drains where shown on drawing; or release from the site on each day runoff to water occurs, must be ACTIONS. + REPAIR OR REPLACE. DAMAGED CONTROL + REPAIR OR EXTEND CONTROL DEVICES TO OPERATE ADEQUATELY.
- Install sand bags, rock check dams or mulch bunds at 20m centres in all implemented continuously throughout the life of the works which are the «PLAGE ADDITIONAL CONTROL. DEVICES * INSTALL ADDITIONAL SEDIMENTS. TRAPS TO RETARD SURFACE RUNOFF ACROSS THE WORKS AREA.
concentrated flow paths including cut-off drains along kerb and channel, subject of this approval. Where the findings of the required performance INADEQUATE, NOTATIONS ARE
along sediment fences, mulch or earth bunds except where drains are lined self-monitoring program indicate that the 50mg/L TSS compliance limit is being
with turf or geofabric. or is likely to be exceeded, remedial action must be taken without delay to REPORTING CONTRACTOR 10 THE CONSULTANT. DETAILING WEEKLY REPORTS BY THE CONTRACTOR TO THE CONSULTANT OUTLINING THE EFFECTIVENESS OF CONTROL
All disturbed areas shall be covered with 100mm of topsoil prior to turfing, ensure ongoing compliance. AND THE PERFORMANCE OF CONTROL MEASURES AND DETAILS OF ANY CORRECTIVE ACTIONS TAEN
. . . noe . oo : : MEASURES.
seeding, hydromulching or mulching. 15. Sufficient stockpiles of mulch and/or other similar required erosion and
All batters 1 on 4 and steeper shall be tined to a depth of 200mm in sediment control materials and stores must be maintained on site at all times
accordance with Main Roads specifications prior to topsoiling and mulching to enable ongoing erosion control, as well as site contingencies e.g. imminent
(75mm thick). Batters steeper than 1 on 2 shall also have heavy duty jute wet weather, to be dealt with, until commencement of on maintenance. SEDIMENT & EROSION MANAGMENT PLAN
matting installed over the mulch. all other disturbed areas shall be covered
with hydromulch.
Prior to the commencment of any construction activities the following measures
shall be incorporated:
SEDIMENT AND EROSION CONTROL MANAGEMENT PLAN: e Provide education of site personnel
e Set up action plans as a precaution in case of disturbances occuring
© OBJECTIVE: especially after an unexpected strong rainfall event
To minimise erosion on site and ensure sediment is not washed down to the receiving waterways due to construction e Provide regular inspection and maintenance of all structures including the DISCLAIMER — ENSURE ORIGINAL SIZE DRAWING IS USED
activities FOR ASSESSMENT, TENDERING AND CONSTRUCTION.
temporary structures.
LEGEND * LEGISLATION: (Amd Description Date
a Environment Protection Act 1994
Existing storm water Environmental Protection Water Policy 1997
The Integrated Planning Act 1997
Storm Water Drainage
e RESPONSIBILITY:
Agi Drain The responsibility for all measures regarding the sediment and erosion control during construction shall be with the
CONTRACTOR. The contractor shall appoint one staff member, ideally the foreman to be responsible for:
Floor Waste .
° FWG gully ***the location of drain paths such as swales and trenched, cut off swales, catch drains and perimeter banks. All of BOOS TS SONS SbUGtOn THE CONTRACTOR SHALL PROVIDE A
—- these measures shall ensure the runoff is directed to the sedimentation basin during construction. PLAN FOR STOCKPILING, MATERIALS STORAGE AND WASTE
[| GP1 Gully Pit nb depoaedet down of materials and goods in particular concrete and cement shall be separated, set to dry MANAGEMENT. THIS PLAN MAY BE A HAND DRAWN SKETCH BUT
***installation and maintenance of the sediment control fences all around the perimeter as shown in plan aioe VISIBLEY PLACED IN THE SITE OFFICE.
—1-—_1+———_. Sediment Fence **“control of fences, sandbags and bales as well as the sedimentation basin after each rainfall event . - LOCATE STOCK PILES ON LEVEL GROUND AWAY
*“*control of the entry/exit path and the minimization of sediment transfer to the street in particular control of concrete FROM AREAS SUBJECT TO CONCENTRATED Issue Notes Date
a Boundary eid earthmoving vehicles OVERLAND FLOW. For Development Approval
. Supervise other members of staff and lead by example / oo . CONSTRUCT A PERMENENT BANK OR CATCH DRAIN For Building Approval x (01-03-16
@ Diameter **“ensure enough litter collection devices are provided for the collection of daily litter such as cans, bottles, paper, ABOVE STOCK PILE TO PROTECT IT FROM UPHILL
C.0.8. Cleanout to surface butts and also building material cut off's. RUNOEF. For Tender
Een Eccentric Enlarger ***ensure all stockpiles for both incoming and outgoing goods in particular soils and sands are clearly marked and not . CONSTRUCT A SEDIMENT FENCE BELOW THE For Construction
inisned Tloor level blocking drain paths and kept neat and clean.
GP Gully pit ***control the flow path of stormwater at all times during construction and use swales, sandbags, bales and other Ore He PILE TRAP SEDIMENTS BEING WASHED [As Constructed
a pully Man Hole er measures to ensure the runoff is directed to the sedimentation basin at all times. . PROVIDE ACCESS TO STOCKPILE FROM SIDE SO AS
nm Invert Level TO AVOID RUNOFF PASSING THROUGH.
K&C Kerb & Channel * ACTIONS: . a |
MH Manhole In case of major rainfall events the following action plan shall be followed and responsibly looked after by the
PO Planter outlet CONTRACTOR: T-OFF DRAIN A NT TERM .
RPB Real Property Boundary CUT-OFF DRAIN ALONG CONTOUR — LONG TE PLASTIC SHEET WHEN RAIN OR H d raulic Wh
RPD Real Property description ***DON'T WAIT UNITL IT IS TOO LATE! STOCKPILES ONLY (GRADE AT 1 IN 100 max. TO FREE HIGH WINDS ARE EXPECTED. V
RWO Rain water outlet be on site during the rainfall period and monitor the drain paths. Redirect where required. OUTLET.) STABILIZE ALL EARTHWORKS AREAS WITH TURF.
RWH Rain water head *check the fences after every rainfall and replace the fences where required. Check and replace all barriers, V—
SL Surface Level bales, sandbags and temporary swales, cut off drains and trenches where required. CONTACT: Reinhold Koenning MIEAust RPEQ No 7023
Sq Square **clean out sedimentation material as soon as the moisture content allows it. Flow PO Box 181
SWD Storm water drain “check the receiving pit and improve the barriers if required. _<———— Moffat Beach, QLD, 4551
ste Trench grate transverse bar “REMEMBER: EACH RAINFALL IS THE EVENT TO ACTIVELY WATCH AND CONTROL THE RUNOFF! WrOrwrwnr AA een 7 email: [email protected]
TG(I) Trench grate longitudinal bar SES SWIG RINSE PH: (07) 5491 4333
u/g Underground
u/s Under slab CLIENT
u.n.o. Unless noted otherwise SEDIMENT FENCE AS SPECIFIED ALONG CONTUR
(EXTEND 3m min. EACH SIDE OF STOCKPILE. CONNECTIVITY P/L
DESIGNER:
STOCKPILES \ DES CRAWFORD J
1. PLACE STOCKPILES 5m min. UPSTREAM OF EXISTING VEGETATION, (PROJECT: 31 CORSAIR CRESCENT Y
CONCENTRATED WATER FLOW, ROADS, AND HAZARD AREAS. SUNRISE BEACH
2. CONSTRUCT ALONG THE CONTOUR AS LOW, FLAT, ELONGATED DUPLEX
MOUNDS (2m max. HEIGHT.)
DRAWING TITLE:
STORMWATER /
DRAINAGE AND )
MANAGEMENT PLAN
Design| RK. | checked | Ch [Date 01-03-16 | Dwg. No. AMD.
SCALE: 1 : 100 on At u.no.| 4 Of 4 3105-4 J
RPD:— LOT 219 RP 135364
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20150426 - Stormwater Drainage and Management Plan.pdfRelated documentApplication case desk ↗
20150426 - Stormwater Drainage and Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.