Skip to the record
Beware of cheap imitations.

Council archive · source document

000A88A4.029.tif · 132003.221037

From the archive 23537 DA - Material Change of Use Special Facilities Resort Complex North Shore. File date in the archive: 2026-10-27 04:17.

From the archive 23537 DA - Material Change of Use Special Facilities Resort Complex North Shore. File date in the archive: 2026-10-22 14:19.

of 1

Text shows just the words. Original shows the document exactly as it was published.

PETRAC PTY LTD: Noosa North Shore Eco-Tourism Portal - Development Code 22

This environmental management plan (EMP) has
been prepared for Petrac Land Holdings Pty Ltd
(Petrac) as part of the proposed “Noosa North
Shore Eco-Tourism Portal Development Code”,
which forms part of an application for Preliminary
Approval for Material Change of Use application
over Lot 7 on RP 844337 (the land). The aim of
the EMP is to provide policies and performance
objectives to control land development and
minimise impacts on established environmental
values.

The EMP establishes the overall environmental
management objectives and elements to be
considered and is designed to provide the

to be lodged with applications for Development

Permits to allow development to commence.

Each detailed EMP prepared to accompany

future applications for Development Permits in

relation to the land is to be structured so that the
following items are addressed:

a) The rationale governing the need for the
EMP Element.

b) The identified objectives(s) / target(s) for the
EMP Element.

c) The nominated management strategy to
achieve the objectives(s)target(s).

d) The required tasks and actions associated
with the management strategy.

e) The performance indicator(s) that can be
used to quantify that the nominated tasks and
objectives(s)Aarget(s).

f) The nominated frequency or deadline for
monitoring of performance indicators.

g) The reporting and review mechanism.

h) The corrective action procedure to be

h:\gid\noosa\petrac\development code\veport.doc
18/09/2003

Irrespective of the preparation of future EMPs, at

General Environmental Duty — whereby a
Person in the performance of their duties shall not
do so in a manner which will cause, or is likely to
cause, environmental harm unless the person
takes all reasonable and practical measures to
prevent or minimise the harm;

Duty to Notify Environmental Harm — whereby
if a person in the performance of their duties
becomes aware that serious or material
environmental harm is caused or threatened then
the person must contact the responsible

Compliance with the EMP — whereby a person
in the performance of their duties shall do so in a
manner that ensures that the provisions of this
EMP, or any subsequent EMPs, are complied

To develop the land for visitor
accommodation and services
use whilst maintaining, as far
as practicable, existing
environmental values.

No short or long-term
significant impact to existing
environmental values of the
land.

To integrate development into
the existing landform, as far as

 

 

 

Used in these records

About this file

File size
587 KB (small file)
File type
TIF

No other editions are linked here.

Original file

Log in to download the original file

000A88A4.029.tif · 587 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.