NOOSA COUNCIL IDAS Development Application Decision Notice                                                 3 of 6




                                     Noosa Council Conditions
                                     INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION


1.    Development undertaken in accordance with this approval must generally comply with the approved plans
      of development. The approved plans are titled Site Plan, Elevations, and Floor Plan and numbered Job
      No. 1416 prepared by Dwyer Quality Homes and dated 24 August 2007 and as may be amended by these
      conditions and annotations on the plans.

2.    The development must be undertaken and operated in a manner that causes no detrimental effect upon
      the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other
      emissions.

3.    A rainwater storage tank with a minimum capacity of 5000 litres shall be provided on site to service the
      detached house. The tank is to be installed to ensure water from the tank can be used both:

      3.1.   For external use such as watering gardens, irrigation, ornamental ponds or water features, topping
             up swimming pools, outdoor cleaning; and

      3.2.   For use in flushing of toilets internal to the building.

4.    All hot water systems installed shall be either solar systems; electric heat pump systems; or gas systems
      (LPG or natural).
Easements
5        Buildings and structures (including swimming pools, sheds, tennis courts or outbuildings) are not
         constructed under overhead electricity transmission lines, or within any easements.
Contributions Towards Council Infrastructure
6     Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or upgrading
      various infrastructure at the rates applicable at the time of payment. An estimate only of the contribution
      amounts under the current Council policies and requirements is outlined in the table below:

        Contribution Required For:                                                          Amount:

        PSP20 – Pathway Trunk Network Contributions                                         $ 669
        TOTAL Contribution Amount =                                                         $ 669
        Please note, that these amounts are all subject to variations in the Consumer Price Index, All Groups Brisbane
        from JUNE 2007 until the date of payment.
      All contributions must be paid prior to the commencement of the use.

Currency
7     The Development Permit for a material change of use lapses if the use has not happened by 23 October
      2011, unless an application to extend the currency is approved by Council.




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@140756e5\@[email protected]

Used in these records

About this file

File size
28 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2007.00002011.001 [As Published].pdf · 28 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.