Council archive · source document
Approved Document 3 of 3 Bushfire Management Plan Dec 2020 OPW20-0145 · OPW20/0145
Plans and drawings: the text below has words only, no drawings.
Very large file (12.5 MB): may take a few minutes to open.
Noosa Civic | Page 6
Figure 2
The entire area has enjoyed previous Bushfire Management Plans, and this is an update of these previous
plans and bushfire assessments. The entire precinct of Noosa Civic is under onsite management which
includes bushfire. There is an annual seasonal preparedness review that ensures all maintenance is current.
This will continue for all new aspects of bushfire associated with this proposed development including the
emergency access south of Lots 11-15.
Bushfire Planning Specialists | qldbushfireplanning.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Document 3 of 3 Bushfire Management Plan Dec 2020 OPW20-0145.pdfRelated documentApplication case desk ↗
About this file
- File size
- 12.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.