Council archive · source document
Approved Document 3 of 3 Bushfire Management Plan Dec 2020 OPW20-0145 · OPW20/0145
Plans and drawings: the text below has words only, no drawings.
Very large file (12.5 MB): may take a few minutes to open.
Noosa Civic | Page 9
3. PROPOSED DEVELOPMENT
The proposed development is Reconfiguration of Lot (1 Lot into 23). There are (5) development nodes
proposed in this application. The entire precinct is gently sloping towards Eenie Creek (Figure 5).
Figure 5
Bushfire Planning Specialists | qldbushfireplanning.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Document 3 of 3 Bushfire Management Plan Dec 2020 OPW20-0145.pdfRelated documentApplication case desk ↗
About this file
- File size
- 12.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.