Skip to the record
Every meeting, every word.

Original source · versioned page text

2018-08-31 Special Meeting Agenda

of 25

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                       AGENDA


              Special Meeting


               Friday, 31 August 2018

                 commencing at 11.30am
         Council Chambers, 9 Pelican Street, Tewantin



Committee:   Crs Tony Wellington (Chair), Jess Glasgow, Ingrid Jackson,
             Joe Jurisevic, Frank Pardon, Brian Stockwell, Frank Wilkie



                    “Noosa Shire – different by nature”
Log in to download the original file

2018-08-31 Special Meeting Agenda(PDF, 1MB).pdf · 1.1 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 24 sections

Section 2

SPECIAL MEETING AGENDA                                       31 AUGUST 2018


TABLE OF CONTENTS

ITEM                                                                   PAGE

ATTENDANCE & APOLOGIES                                                      -

REPORTS

1      INVESTIGATION ON POTENTIAL USES 24 COOROY NOOSA ROAD, TEWANTIN -
       LOT 375 SP151415 (FORMER TEWANTIN TAFE SITE)                        3

MEETING CLOSURE                                                             -




                                                                 Page 2 of 25

Section 3

SPECIAL MEETING AGENDA                                                             31 AUGUST 2018


1                        INVESTIGATION ON POTENTIAL USES 24 COOROY NOOSA ROAD, TEWANTIN - LOT
                         375 SP151415 (FORMER TEWANTIN TAFE SITE)
Document i nformati on




Authors                          Director Corporate Services, Michael Shave
                                 Project Officer, David Thomas
                                 Corporate Services Department

Index                            ECM/ Property/ 24 Cooroy Noosa Road

Attachments                      1.   Koala Habitat Overlay
                                 2.   Bushfire Hazard Areas Overlay
                                 3.   Financial Assumptions and Outputs



EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Director Corporate Services and Project Officer to the Special
Meeting dated 31 August 2018 regarding potential uses for the former Tewantin TAFE site located
at 24 Cooroy Noosa Road, Tewantin and agree for Council staff to continue negotiations with the
Queensland Government regarding the future of the site.



REPORT
Background

In February 2002 the Queensland Government (the state) gave notice of the designation of land
situated at 24 Cooroy Noosa Road, Tewantin for the purposes of “community infrastructure –
education facilities”. The designation was at the time made under section 2.6.1(1) of the Integrated
Planning Act 1997 (the Act). Section 2.6.11 of the Act also required Council to note the designation
on its planning scheme.

In 2004 a purpose built Technical and Further Education (TAFE) campus was constructed on the
site. The land comprises 11.04 hectares with approximately 1.56 hectares utilised for the campus
footprint. The remaining 9.48 hectares of land area is heavily vegetated with much of it considered
to have high biodiversity environmental value.

As the site was subject to a Ministerial designation for “community infrastructure – education
facilities”, no development application was required for the TAFE. Ministerial designations will
ordinarily lapse after six years unless extended. It is understood that the Ministerial designation for
community infrastructure on this site has lapsed and therefore the land is subject to the Noosa
Planning Scheme.




                                                                                        Page 3 of 25

Section 4

SPECIAL MEETING AGENDA                                                           31 AUGUST 2018


An aerial view of the site is provided for information below.




The site is situated opposite the Noosa Outlook residential estate roundabout and is surrounded
by the Tewantin Noosa Golf Club, Tewantin Cemetery and the Tewantin Sports Complex. There
is some minor encroachment by the Golf Club driving range on the western side of the property.
The buildings on the site are set well back from the road frontage, surrounded by dense vegetation
and are accessed by a bitumen sealed driveway.

The facility had student intake from 2006 and operated for approximately 8 years until it was closed
in June 2014 following a TAFE Queensland review. The facility has remained closed since that
time. A decision on the site’s future was to be made following the completion of a ten year Strategic
Training Asset Management Plan by the state.

The Department of Employment, Small Business and Training made contact with Council in March
2018 to discuss whether Council had any interest in purchasing the site. Since then, information
has been obtained and developed as part of Council’s due diligence investigations in the following
areas:
1.   Site infrastructure;
2.   Site planning, land use options and environmental considerations;
3.   Building condition assessment;
4.   Potential site demand (commercial and community); and
5.   Financial analysis and whole of life cost implications.

This information is important to ensure that Council makes appropriate decisions in the best
interests of its ratepayers and the community. Any decision must also align with Council’s Financial
Sustainability Policy.

                                                                                       Page 4 of 25

Section 5

SPECIAL MEETING AGENDA                                                             31 AUGUST 2018


Site Infrastructure

The former TAFE facility comprises 4 main buildings (blocks A through D) linked via covered areas
and walkways, a work shed, with the facility supported by onsite road and water / wastewater
infrastructure. Vehicle access is available via a boom gate at the Cooroy Noosa Road frontage and
a bitumen sealed driveway (with 95 car parks on site). An aerial view of the current building footprint
is provided below for information.




The net floor space of the 4 main buildings is approximately 1,822m2. A breakdown of floor space
for each building and common areas is provided below.

 Asset                Description                                    Floor Area
 Block A              7 classrooms / meeting rooms                   337m²
 Block B              3 classrooms / meeting rooms / 3 studios       1,045m²
 Block C:             Administration building / library              395m²
 Block D:             Workshop / maintenance building                45m²
 Covered Areas        Walkways / shed                                638m²
 Total Area                                                          2,460m²




                                                                                         Page 5 of 25

Section 6

SPECIAL MEETING AGENDA                                                               31 AUGUST 2018


Site Planning and Environmental Considerations

Noosa Plan 2006

The site is located in the Tewantin and Doonan Locality and is included in the Community Services
Zone. The land to the east containing the Tewantin Cemetery is also included in the Community
Services Zone, with a small portion to the north being included in the Open Space Conservation
Zone. The land currently enjoys existing use rights for an educational establishment, to the extent
that is was developed for the purposes of a TAFE.

The Tewantin and Doonan Locality assessment table identifies the following code and impact
assessable uses noted against the “Community” use zone.

 Use              Assessment     Comment
                  Level
 Commercial       Code              Type 2 Medical (use of premises for the practice of human
                                     medicine and therapies).
                                    Type 3 Veterinary (use of premises for the treatment of sick or
                                     injured animals).
                                    Entertainment & dining business Type 1 (the use of premises
                                     involving the sale of food and beverage for consumption on the
                                     premises for 10 or more people) where in conjunction with a
                                     community use.
                  Impact            Commercial business type 1, entertainment and dining business
                                     (if not otherwise code assessment).
                                    Home based business, industrial business, retail business.
 Community        Code              Education Type 4 Information (the use of premises for the
                                     collection and display of information for reference or reflection
                                     including a library, museum and information centre).
                                    Emergency Service (any use conducted by a state or local
                                     authority for the purposes of protecting the community and
                                     responding to emergency situations).
                                    Open Space Type 1 Sport and Recreation (The use of premises
                                     for sports or active recreation in a formal outdoor setting,
                                     accessible by the public).
                                    Wellbeing Type 2 Social (The use of premises for the gathering of
                                     people for networking, support, common pastimes, exercise,
                                     charitable work or companionship).
                  Impact            Education Types 1 (Childcare) , 2 (School) or 3 (Adult).
                                    Open Space Type 2 (Camp Ground).
                                    Wellbeing Types 1 (Health), 3 (Worship) or Type 4 (Funeral).
 Infrastructure   Code              Service and utility Type 1 Depot (the use of premises for a depot
                                     or station for conduct of the daily business of a local government,
                                     State government, statutory authority or telecommunications
                                     company, in supplying a public service or utilities).
                                    Type 2 installation (the use of premises for a structure or
                                     installation as part of a network where other administrative
                                     functions are not conducted on the same site).
                                    Type 4 Treatment, Recycling and Disposal (the use of premises
                                     for the treatment of water for municipal supply or the treatment,
                                     recycling and disposal of wastewater or solid materials).
                                    Transport Type 1 Passenger Terminal (the use of premises, by the
                                     travelling public, as an air, rail, water or road transport passenger
                                     terminal, station or interchange).



                                                                                           Page 6 of 25

Section 7

SPECIAL MEETING AGENDA                                                                       31 AUGUST 2018


 Use                 Assessment           Comment
                     Level
                                             Type 2 Carpark (the use of premises for the parking of motor
                                              vehicles where such parking is not ancillary to another uses on the
                                              same site).
                                             Type 3 Depot (the use of premises for the storing and routine
                                              maintenance of commercial or passenger motor vehicles).
                     Impact                  Service and utility Type 3 (Tower).
                                             Transport Type 4 (Aeronautical).
 Residential         Code                    Ancillary dwelling unit (The use of premises for a caretaker’s
                                              residence or employee residence associated with a non-
                                              residential use on the same premises).
                     Impact                  Detached House, Community Residence, Multiple housing Types,
                                              2 (Duplex) 3 (Retirement or Special Needs), 4 (Conventional) or 5
                                              (Relocatable); or Visitor Accommodation.

Environmental Considerations

The site is identified by the Noosa Plan’s biodiversity overlay as containing vegetation worthy of
environmental protection due to its remnant status (refer map below) and its endangered
classification under the Vegetation Management Act 1999. The vegetation on the western portion
of the site contains ‘endangered’ vegetation’ with a wallum wetland area and the eastern portion
of the site is considered ‘least concern’ vegetation, mainly due to a change in land zone.

The site is also mapped as containing koala habitat area under the biodiversity overlay (refer
attachment 1). The site is mapped under the Nature Conservation Act 1992 as high risk for
protected plant species. High risk areas represent areas where endangered, vulnerable or near
threatened plants are known or likely to exist. Any clearing in a high risk area may require a flora
survey and / or a clearing permit from the state. A recent site inspection confirmed the presence of
endangered vegetation ecosystem over the majority of the site (excluding the TAFE footprint and
golf course encroachment to the west).

The natural hazard overlay identifies the site as medium to high potential bushfire intensity (refer
attachment 2), and being in a low potential acid sulfate area. The site contains regulated
vegetation including endangered regional ecosystem and of concern regional ecosystem.

The site is mapped as essential habitat for the following species.

 Species                        Comment
 Koala                              Site has been identified as containing Koala habitat, however it is not
                                     designated as either Koala assessable development area or a priority
                                     Koala assessable development area under state mapping
                                    Koalas are observed in the adjacent sports grounds and golf course and
                                     are likely to frequent the site
 Wallum rocketfrog                  The site contains habitat for Wallum Rocketfrog.
                                    Any habitat disturbance / removal would require assessment and any
                                     impact offset in accordance with Queensland Environment Offset policy
 Glossy black cockatoo              The site contains habitat to support the Glossy Black Cockatoo
                                    Any habitat disturbance / removal would require assessment and any
                                     impact offset in accordance with Queensland Environment Offset policy

Note: The site is also likely to contain swamp crayfish habitat.



                                                                                                   Page 7 of 25

Section 8

SPECIAL MEETING AGENDA                                                                    31 AUGUST 2018




  State Government mapping extract showing Endangered Vegetation (pink), Least Concern vegetation (green) and
        habitat (hatched areas) for Koalas (860), Glossy Black Cockatoo (1171) and Wallum Rocketfrog (609)

Any potential development of the site that results in vegetation clearing may require referral to the
state for assessment and could result in vegetation offset requirements including replanting or
monetary payment.

Facility condition assessment

BDR Projects Pty Ltd (BDR) were commissioned by Council to undertake a building condition and
compliance assessment of the site. Included within the scope of works was an assessment of the
following building components:
     Superstructure;
     Substructure;
     Roof;
     Flooring;
     Fit out & Fittings;
     Heating, Ventilation and Air Conditioning (HVAC);
     Fire & Security;
     Electrical Services;
     Hydraulic and Plumbing; and
     Lighting.

The assessment was recently completed, with assessments based on visual inspections of
accessible areas. The assessment consideration assumed reinstating the buildings to their current
designed use, however did not include or assess any fundamental change in use requiring
structural changes or alterations. The consultant concluded that the buildings on the site are
generally in good condition and are building code compliant. The table below provides a summary
by BDR of the building condition and compliance assessment.

                                                                                                Page 8 of 25

Section 9

SPECIAL MEETING AGENDA                                                                31 AUGUST 2018


 Assessment Type       Overall Assessment        Comments
 Building Condition    Buildings are generally      Overall structures, including superstructures and
                       in good condition             substructures are functionally sound with limited
                                                     improvements required.
                                                    Roofs and guttering are in good condition with
                                                     limited priority repairs required.
                                                    External surfaces are generally structurally sound
                                                     however exhibit deterioration, primarily due to lack
                                                     of maintenance and vandalism.
                                                    Internal surfaces are generally sound and exhibit
                                                     minor deterioration, primarily due to lack of
                                                     maintenance and vandalism.
                                                    Visible services appear functional with some minor
                                                     wear and tear deterioration. Buried and concealed
                                                     services are considered to be adequate due to age
                                                     and limited use of the facility in recent years. It is
                                                     anticipated that concealed ducting, cabling, piping
                                                     and other associated services will be in a fair to
                                                     good condition,
                                                    Several fittings and fixtures will require replacement
                                                     due to lack of maintenance, vandalism, theft,
                                                     neglect and corrosion.
 Building Compliance   Buildings are generally   The following improvements are required for ongoing
                       compliant with building   operational compliance and occupant safety:
                       code requirements          Fire extinguishers are to be re-instated.
                                                  Fire hose reel maintenance tags appear to be
                                                    current, but should be checked at the time of any re-
                                                    occupancy.
                                                  Fire safety installations should be checked and
                                                    tested in accordance with Australian Standard 1851
                                                    (fire safety) requirements.

                                                 Further building compliance assessment comments
                                                 include:
                                                  Building assessment certificate of classification not
                                                      displayed as required (note Council also has no
                                                      record on file).
                                                  Contract documents indicate the Building Code of
                                                      Australia 1990 and referenced standards to be the
                                                      applicable code for compliance purposes.
                                                  All relevant new and existing glass must have visual
                                                      indicators complying with AS1428.1-2009 (design
                                                      for access and mobility).

The scope of the assessment also included the requirement to provide a detailed asset
maintenance and renewal schedule in order to understand the future likely asset cost implications
for ratepayers in the event of site purchase.




                                                                                            Page 9 of 25

Section 10

SPECIAL MEETING AGENDA                                                             31 AUGUST 2018


Annual Inspection and Maintenance Program
Likely ongoing facility costs were developed on the assumption that the buildings and their relevant
components were inspected and maintained to reach the end of their estimated lives. Given the
current state of disrepair at the facility (attributable to vandalism and general deterioration due to
the site being mothballed), additional defect rectification costs of $357k were estimated to bring
the facility back up to operating standard in year 1 (i.e. 2018/19). Costs from 2020 onwards reflect
expected ongoing asset inspection and maintenance requirements for the facility arising from the
condition assessment. The graph below highlights the estimated inspection and maintenance costs
required over 10 years for the facility (totalling $1.9m including inflation).




Renewal / Replacement Program
An asset renewal / replacement forecast was also developed on the basis of the expected
remaining life of the different components of the buildings following the onsite assessment. As the
overall condition of the facility is considered good, condition based renewal works of approximately
$500k are not likely until 2023 relating to HVAC and lighting system replacements. Significant
levels of expenditure ($9 million) were estimated by the consultants in 2028 when fit out and fittings,
and fire and security systems would require replacement. For the purposes of the investigation it
was assumed that half of these costs would be smoothed into future years once actual condition
is assessed.




                                                                                       Page 10 of 25

Section 11

SPECIAL MEETING AGENDA                                                                31 AUGUST 2018


Likely demand or need for the site?
Background - why did the TAFE close?
The Tewantin TAFE had a short history, opening in 2006 and then being closed by the Liberal
National Party Government in 2014. It is understood that a key driver for the closure of the Tewantin
TAFE (and a number of other TAFE facilities across the state) was asset underutilisation and an
agenda to rationalise training assets to address sector financial viability concerns at the time.
The Tewantin TAFE in particular had experienced reducing student numbers (approximately 700
down to 200). As a result, courses were transferred from Tewantin to Nambour and Mooloolaba
campuses, and upwards of 25% of the site leased at peppercorn rates making the facility unviable
for the state under the status quo. Another contributing factor was the cost of training courses being
driven down through competition with private enterprise registered training organisations
(introduced by the Australian Government), and the increasing popularity of online training through
technological innovation.
It has also been noted that the location of the Tewantin TAFE site may not have been appropriate,
particularly for undergraduate type courses, as the location is removed from social and supporting
facilities such as coffee shops etc.

Demand Investigation Undertaken
Following the approach from the state, Council’s Project Officer (former Noosa Council Director of
Business, David Thomas) has investigated what opportunities may exist within Council and the
external market for the ongoing use of the site. The investigation canvassed the need for the site
for current or future Council operations, current demand or likely need for the facility by community
groups, in addition to any likely commercial or other appetite to lease the site in an anchor role or
other financially sustainable way.

Potential Council Use
Uses for the facility that could potentially align with Council’s Corporate and Operational Plan
objectives (including adopted strategies and plans) were discussed across the various
Departments within Council. The table below outlines the potential use and comments received.

 Department          Use Purpose          Findings
 Community           Social                  Council’s Social Strategy (page 14) has identified limited
 Services                                     demand for additional community facilities in the Shire,
                                              and going forward there may be a need to rationalise
                                              under-utilised facilities or those deemed to be no longer fit
                                              for purpose to meet the changing needs of the population
                                             Council’s Corporate Plan identifies that a key focus area
                                              between 2017-2022 is to undertake a pre-feasibility study
                                              for a regional art gallery building. Staff advised that the
                                              location of the site is considered not suitable given its
                                              isolated nature, poor visibility, lack of passing pedestrian
                                              traffic and distance from other shire services and attractors
                     Cemeteries              The Tewantin Cemetery has approximately 4-5 years of
                                              capacity remaining. There is some appetite for expansion
                                              of the cemetery onto the eastern side of the site to extend
                                              the life of the cemetery (potentially creating a further 15-
                                              20 years of plot life)
                                             Planning constraints would need to be addressed
                     Waste                   Planning considerations limit any potential usage for
                     management               waste management purposes, and the site has not been
                                              considered with regards to waste management site
                                              planning.


                                                                                           Page 11 of 25

Section 12

SPECIAL MEETING AGENDA                                                                 31 AUGUST 2018


 Department          Use Purpose          Findings
 Environment and     Environment land        Although the site contains endangered vegetation it has
 Sustainable         acquisition              not been identified to date in Council’s Conservation Land
 Development                                  Guideline which identifies significant properties of interest
                                              for purchase using Environment Levy funds
                     Economic                As an education hub the site may have some wider
                     Development              economic potential but that would require a substantial
                                              paying anchor tenant and a number of sub tenants to
                                              ensure the facility was viable for Council
                                             Some commercial expression of interest was received
                                              regarding potentially leasing the site should Council
                                              purchase (although not of anchor tenant size)
 Infrastructure      Transport               Council’s Transport Strategy implementation has recently
 Services                                     commenced. Opportunities for site use as a bus depot or
                                              use for other transport purposes (possibly a park and ride
                                              facility) were discussed.
                                             It is unlikely that the site would provide a long term solution
                                              as a secure bus storage yard or park and ride facility given
                                              the existing carpark configuration has insufficient
                                              hardstand space and other necessary infrastructure and
                                              would require major rework (likely to create environmental
                                              and planning conflicts)
 Corporate           Strategic land          Council’s Property Branch is about to commence a
 Services            acquisition              strategic review of Council land holding opportunities. The
                                              project has not advanced enough to provide any advice
                                              regarding the value or otherwise of the site as a strategic
                                              land acquisition

Potential Community Group use
Likely community group demand for the facility was investigated within the context of any anecdotal
examples of need in addition to understanding current availability of floor space in Tewantin and
also the broader Noosa area.
Council’s Community Development and Property branches advised that there are currently no
active discussions with any group seeking tenure arrangements within a Council facility (with recent
demand considered low). With respect to the availability of floor space in Council controlled
facilities in Tewantin, spare capacity current exists in both the recently completed Tait Duke
Cottage (with Council currently seeking community group interest for a lease arrangement), and
facilities at the Tewantin Sports Complex (with a number of buildings having spare capacity during
the week).
With respect to casual space available in other local Council facilities, capacity exists in the nearby
Wallace Park estate, in particular the Noosa Leisure Centre (three meeting rooms), with meeting
rooms also becoming available for hire in the Noosaville Library once the refurbishment is
completed in November. Meeting rooms are also currently available for use free of charge at the
Cooroy Library for not-for-profit community groups
Following recent enquiries regarding the availability of commercial and other non-Council facility
floor space in Tewantin, there are a number of opportunities for free casual use of meeting space
in the new Bendigo bank building, at the RSL and also the Japara Noosa aged care facility in
Moorindil Street. Other shire wide meeting space is available for hire (for example Tewantin CWA,
Tewantin Masons, Pomona Community House, Cooran Hall, Kin Kin Hall, public school halls,
Cooroy Hall etc.)




                                                                                            Page 12 of 25

Section 13

SPECIAL MEETING AGENDA                                                                       31 AUGUST 2018


Potential Commercial Use

In investigating potential future commercial appetite for use of the facility, population and
demographic projections for the Tewantin Noosaville catchment were reviewed. There is a
projected minor population increase of approximately 2,000 people in the catchment over the next
10 years, characterised by a large component over 65 years of age including a statistically high
number over 80 years of age expected to require some higher level of care. This population is
currently catered for by aged care centres such as Japara, Carramar, or retirement villages such
as Hibiscus, Domain, Riverlands, or serviced in residences by in home care providers. The
Sundale aged care and retirement facility currently being constructed on McKinnon Drive will also
meet some of the future expected demand.

It should be noted that the northern end of the Sunshine Coast Council region (i.e. Peregian
Springs / Peregian Breeze/ Doonan / Lake Weyba) forms part of the broader catchment, and
growth in these areas is expected to continue to place pressure on Noosa facilities (noting that the
populations in these areas are described as having a more even age distribution than the Tewantin
Noosaville catchment).

The population and demographic projections indicate that given the size and location of the
Tewantin TAFE site, commercial appetite may exist with respect to some form of aged care /
retirement village development in the near future.

Other possible uses canvassed include the following:

 Use                          Comment
 Place of public worship         Should the property be listed for sale there may be interest from churches
 (i.e. church)                    who are attracted to purchase the site due to its location and also size (i.e.
                                  good vegetation buffers to contain noise and large existing floor space)
                                 A change in use for the site would likely be impact assessable under the
                                  current Noosa plan
 Aged care / retirement          As mentioned above, the Tewantin/Noosaville age demographic would
 village                          indicate demand for this type of development. It is understood that there
                                  have been providers within the industry actively seeking sites in the area
                                  for purchase and as a potential development opportunity
                                 Flow-on economic benefits to the Tewantin and broader Noosa region
                                  would likely eventuate from this use
                                 A change in use for the site would likely be impact assessable under the
                                  current Noosa plan
 Educational facility / hub      Potential education providers would include registered training
                                  organisations (RTO’s), the Central Queensland University (CQU),
                                  Sunshine Coast University (SCU), private and public Schools, and smaller
                                  boutique providers (i.e. English language classes etc.)
                                 However issues associated with the TAFE closure (i.e. public transport
                                  perception, visibility, distance from other facilities and overall accessibility)
                                  remain factors that may discourage the use of location as either an owner,
                                  sole tenant or joint tenant
                                 It is understood that site is not under consideration for future use by any of
                                  the large education providers currently located in the shire.
                                 Should Council purchase the site to activate for educational purposes,
                                  competitive neutrality obligations would need to be met with respect to floor
                                  space market pricing
 Single large commercial         No market sounding exercise has been undertaken by Council staff to
 tenant                           determine any appetite for a large commercial anchor tenant role at the
                                  site (given the site is still under state ownership and this may already be
                                  occurring directly with the state). The design of the buildings may deter
                                  interest, with any potential redevelopment requiring a cost benefit analysis

                                                                                                  Page 13 of 25

Section 14

SPECIAL MEETING AGENDA                                                                 31 AUGUST 2018


 Use                       Comment
                              Should Council purchase the site for this use, competitive neutrality
                               obligations would need to be met with respect to floor space market pricing
                              Based on current market square metre lease rates it is unlikely that
                               revenue generated would cover the costs of the site (in its current form)
                              Any commercial use not for educational purposes would likely result in a
                               change of use and be either code or impact assessable under the Noosa
                               plan
 Mix of commercial            Some interest from external groups / individuals has already been
 tenants                       expressed to Council (which Council appreciates and acknowledges)
                               regarding the potential to tenant some of the existing building space for
                               commercial use (should Council purchase the site)
                              In terms of available capacity in the lease market, experienced commercial
                               real estate agents have indicated that the Tewantin leasing market outlook
                               is soft due to the retreat of banks with vacant business space now available
                               in the CBD. The Noosaville industrial estate market is currently firm,
                               however it is expected that additional floor space is about to be released
                               onto the market, and this is likely to attract successful businesses willing
                               to upscale to new larger premises leaving vacancies at the lower end of
                               the market. Noosa Civic turnover opportunities still exist at competitive
                               rates
                              Should Council purchase the site with a view to use for mixed commercial
                               use, competitive neutrality obligations would need to be met with respect
                               to floor space market pricing
                              Based on current market square metre lease rates it is unlikely that
                               revenue generated would cover the costs of the site (in its current form)
                               including ongoing maintenance and depreciation expenses
                              Any commercial use not for educational purposes would likely result in a
                               change of use and be either code or impact assessable under the Noosa
                               plan

Summary

The following points are relevant based on the findings from the investigation into the likely need
for the future site use.
      Commercial appetite for future site use is expected to be driven by an ageing population in
       the Tewantin Noosaville catchment;
      Identification of existing current need for site use by Council has been limited to the south
       eastern portion of the site to accommodate a potential expansion of the Tewantin cemetery
       (and noting that, whilst the site contains endangered vegetation, it is not currently identified
       for potential purchase from Environment Levy funds);
      There may be private investment potential in the site with respect to uses for public worship,
       aged care or retirement village (subject to meeting planning requirements);
      It is unlikely that the site would attract any large education provider given that factors still
       remain relating to the TAFE failure;
      Based on the assessment of current available capacity for community space there appears
       no immediate need or pressing demand to activate the site for community group use;
      Securing a sole tenant or a mix of commercial tenants at the site would likely be challenging
       given currently available commercial floor space at Tewantin, and developing opportunities
       in the Noosaville industrial estate and Noosa Civic; and
      Any potential use sought by Council for commercial purposes will require competition policy
       compliance to ensure a level playing field is maintained with potential competitors.




                                                                                           Page 14 of 25

Section 15

SPECIAL MEETING AGENDA                                                               31 AUGUST 2018


Financial Implications

To ensure that the financial implications of any potential site purchase are fully considered, 10 year
financial modelling has been undertaken based on a number of known buy and retain scenarios
(to effectively understand the worst case financial position should the site be acquired and
operated).

There are a myriad of scenarios that could eventuate regarding the future use of the site under
Council control, however only the following have been modelled for the purposes of the
investigation (with buy and resell options not yet considered):

     Scenario 1 – Full commercial lease return (with 9 sub scenarios regarding alternative site
      purchase cost and differing lease rates per m2).
     Scenario 2 – Part commercial lease (assuming only 50% of the building footprint is leased
      with 9 sub scenarios regarding alternative purchase prices and differing lease rates per m2).
     Scenario 3 – Community lease (with 3 sub scenarios regarding alternative site purchase
      cost).

The modelling incorporated the estimated rectification costs required to bring the buildings online
in addition to including annual operating and maintenance forecasts. Operating forecasts were
derived from comparison with other similar sized Council buildings (i.e. utilities, power, cleaning,
information communication), with other operating cost forecasts derived from first principles (i.e.
land management costs, rates, staff resourcing). Maintenance forecasts were utilised directly from
the building condition assessment results. Attachment 3 includes the list of general modelling
assumptions used in determining annual revenue, expense and net present value (NPV)
outcomes.

NPV is essentially a measurement of return calculated by subtracting the present values of cash
outflows (including any initial purchase cost) from the present values of cash inflows over a period
of time. After the cash flow for each period is calculated, the present value is achieved by
discounting the future value at a periodic rate of return (in Council’s case the likely rate of borrowing
funds from Queensland Treasury Corporation). Business and government use this approach to
determine if potential investments will provide a sufficient return (i.e. the net present value must be
nil or higher). Whilst this approach is not simple for local government projects with broader benefits
(social, economic, environmental) it is a good indicator of the likely financial impact on ratepayers
when making decisions.

The following graph outlines the NPV cost per ratepayer for the 3 scenarios. Assuming a
conservative approach to revenue generation (i.e. lease rates of $150m2 achieved) the potential
net cost to each ratepayer ranges from $258 to $296 over the 10 year period (on average a $25 to
$30 investment per annum). This would equate to an upfront general rate increase between 2%
and 2.6% to maintain Council’s current financial sustainability position.




                                                                                         Page 15 of 25

Section 16

SPECIAL MEETING AGENDA                                                                  31 AUGUST 2018




Options for Council

A number of options are available to Council regarding any decision or otherwise to purchase the
site. These options (including identified benefits and risks) are outlined in the table below (note
they are not exhaustive).

 Option               Benefits                                    Risks
 Do not purchase         Potential financial and other risks        Council is unable to directly control
                          relating to the purchase of the site        the likely future use of the site
                          are avoided                                Ministerial designation reactivated
                         Site is disposed by the state for           for a particular use which could
                          commercial development meeting              result in loss of endangered
                          Council’s planning, environmental           vegetation and other negative
                          and economic plan objectives                outcomes (trunk infrastructure cost,
                         Possible perception from within the         traffic challenges etc.)
                          community of cost shifting from state      Inconsistent      use     development
                          to local government avoided                 application may result in refusal and
                         Council internal resources directed         legal costs to ratepayers in
                          towards other identified strategic          defending an appeal
                          objectives                                 Site      completely     cleared    for
                                                                      development with at-risk vegetation
                                                                      lost     (should    an     inconsistent
                                                                      development eventuate)
 Advocate for            Successful advocacy could result in        Council is still unable to directly
 preferred use            future site use complying with              control the likely future use of the
                          Council’s planning scheme and               site
                          meeting broader economic plan              Advocacy          attempts          are
                          objectives                                  unsuccessful with the site disposed
                         Council planning and environmental          for redevelopment resulting in an
                          objectives could be achieved                inconsistent use application
                          without the need to purchase the           Ministerial designation reactivated
                          site                                        for a particular use which could
                         Financial and other risks of                result in endangered vegetation loss
                          purchase mitigated                          and other negative outcomes (trunk
                                                                      infrastructure cost, traffic challenges
                                                                      etc.)


                                                                                            Page 16 of 25

Section 17

SPECIAL MEETING AGENDA                                                                    31 AUGUST 2018


 Option                  Benefits                                    Risks
                                                                      Inconsistent     use     development
                                                                        application results in refusal and
                                                                        costs to defend a legal appeal
                                                                      Site     completely    cleared    for
                                                                        development with at risk vegetation
                                                                        lost
 Buy and sell / retain   Buy and Sell                                Buy and Sell
                          Council is able to control the likely      Preferred Council use for the site
                            future use of the site (with the use        may not align with or eventuate with
                            likely to be compliant with Council’s       the potential purchaser
                            planning scheme)                          Ratepayers may need to fund any
                          Costs of purchase can potentially be         net cost should purchase and other
                            recouped through sale (with site            costs not be recouped through
                            subdivision or applying binding             immediate or longer term sale
                            covenants protecting vegetation             (through either a general rate
                            where required)                             increase or reduction in cash
                          Future commercial opportunities on           holdings)
                            the site could also assist in meeting     Realisation of cost shifting to local
                            Council’s broader economic plan             government
                            objectives
                         Buy and Retain                              Buy and Retain
                          Council is able to take control of the     Council retains responsibility for
                            site (and undertake appropriate cost        refurbishment of the buildings, and
                            benefit analysis regarding financially      ongoing          operations       and
                            viable uses – including possible floor      maintenance costs of the facility
                            space downsizing to minimise cost)        An anchor tenant is not secured
                          Site purchase and retention would            (particularly given no expected
                            protect at-risk vegetation                  tertiary education demand for the
                          Future site use could assist in              site)
                            meeting        Council’s      broader     Uptake of floor space may not
                            economic plan objectives                    eventuate given location and other
                                                                        spare commercial floor space
                                                                        capacity in the shire
                                                                      Ratepayers could fund the purchase
                                                                        and net cost of operations of the site
                                                                        in its current form through a general
                                                                        rate increase



Where to from here?

Council staff are continuing to liaise with the state regarding the future of the site. Given the options
assessed and identified risks and benefits in this report, it is recommended that the purchase and
sell/retain option be pursued in the first instance depending on the Department of Employment,
Small Business and Training’s asking price (primarily given the site’s strategic location and the
opportunity to gain control of the site to investigate opportunities and mitigate development related
risks). An independent valuation has been undertaken which has provided some indication of the
current market value of the property.

If this approach is taken staff would report back to Council with the outcome of those discussions.




                                                                                              Page 17 of 25

Section 18

SPECIAL MEETING AGENDA                                                                 31 AUGUST 2018


Previous Council Consideration
Nil.

Finance
Refer to the body of the report.

Risks & Opportunities
Refer to the body of the report.

Consultation
External Consultation - Community & Stakeholder
Some interest has been expressed regarding potential floor space leasing from the local
commercial market. Whilst the level of interest is appreciated it was too early at this stage to provide
any meaningful feedback until the investigation was completed and future decisions made.

Internal Consultation
A number of internal stakeholders were consulted as a part of the investigation (with Executive
Team input into the development of this report).

Departments/Sections Consulted:

 x     Chief Executive Officer   x   Community Services                      x   Corporate Services
       Executive Officer         x   Director                                x   Director
       Executive Support         x   Community Development                   x   Financial Services
                                 x   Community Facilities                    x   ICT
                                     Libraries & Galleries                       Procurement & Fleet
                                     Local Laws                              x   Property
                                 x   Waste & Environmental Health                Revenue Services

 x     Executive Services        x   Environment & Sustainable Development   x   Infrastructure Services
 x     Director                  x   Director                                x   Director
       Community Engagement          Building & Plumbing Services            x   Asset Management
       Customer Service          x   Development Assessment                      Buildings and Facilities
       Governance                x   Economic Development                        Civil Operations
       People and Culture        x   Environmental Services                      Disaster Management
                                 x   Strategic Land Use Planning                 Infrastructure Planning,
                                                                                 Design and Delivery




                                                                                            Page 18 of 25

Section 19

SPECIAL MEETING AGENDA                 31 AUGUST 2018


Attachment 1 – Koala Habitat Overlay




                                         Page 19 of 25

SPECIAL MEETING AGENDA                                                     31 AUGUST 2018

Attachment 1 — Koala Habitat Overlay

                                   | -                     | LEGEND                     x |
                                       Se |                                                7
                                                               2B Schedule 7- Koala Habitat Areas |
                                                                  C4) Habitat Regrowth
                                                           1      HS Remnant Habitat
                                                           7   g Base
                                                                  #7 =Local Government Areas
                                                           |         AZ Noosa
                                                                     '22 Other LGA
                                                                   “Land Parcels            !

                                           x   4                                   .
                                                     Yo           EF
                                       i   i   i                  n’,)  ;      ;
                                                  Po             8
                                       a   7    o//~/            a
                                           4S                                      ,A~|
                                                     QO                        | eS        i
 =                                     .                                      s            Hy
:                                 MO                  |          |        f               i
  an                                     woosa                     :               .      i
fevaetn                                 ‘tro                   yer Red                    iF
Noo —                               Lee                   Lett                           IE

                                                                              Page 19 of 25

Section 20

SPECIAL MEETING AGENDA                         31 AUGUST 2018


Attachment 2 – Bushfire Hazard Areas Overlay




                                                 Page 20 of 25

Section 21

SPECIAL MEETING AGENDA                             31 AUGUST 2018


Attachment 3 – Financial Assumptions and Outputs

Financial Model Assumptions




                                                     Page 21 of 25

Section 22

SPECIAL MEETING AGENDA   31 AUGUST 2018




                           Page 22 of 25

SPECIAL MEETING AGENDA                                                                         31 AUGUST 2018

 Total land size (ha)                                  11.04 | tHedtare|
 Total land size (acre)                               27.28{    1Acre}      2.47105]
 Total land size (sqm)                              110,400]   ==1sqm}      10,000 |
 Treed area (ha)                                        9.48
 Total building footprint (ha)                       0.2460
 Road (driveway) area (ha)                           0.3460
 Cleared area (ha)                                      0.96
 Cleared area (sqm)                                   9.640
 Fire Trail Establishment (S/km)                $     9.800
 Fire Trail Length (km)                                 1.38 **including increase to 8m buffer
 Fire Trail Maintenance (S$/km/pa)                      365 **slashing 4 times per year
 Hazard Reduction Burn                          $    15,500
 Harzard Reduction Burn Frequency               Every 8 years
 Initial Weed Management (S/pa)                 $      1,602
 Annual Weed Management (S/pa)                  $       400
 No. of High Risk or Large Trees                         16
 Cost per Arborist Report                       $       250

[Mowing
 Mowing cost (S/sqm)                       $       0.03 **from Council mowing contract
 Mowing frequency                          Every three weeks
[Tree Management                                      |
 Tree density (No. of trees/acre)                   889 **assuming trees have an average of 2.1 metres spacing
 % Trees Small                                      30%
 % Trees Medium                                     50%
 % Trees Large                                      20%
 Stump Grind (S/tree)                      $        270
 Maintenance - Small (S/tree)              $        247
 Maintenance - Medium (S/tree)             $        553
 Maintenance - Large (S/tree)              $      1,423
 Removal - Small (Stree)                   $        315
 Removal - Medium (S/tree)                 $        632
 Removal - Large (S/tree)                  $      1,866
 Initial Emergent Tree Assessment (Sitree/repor $   160
 No. of Emergent Trees                               16
 Ongoing Emergent Tree Assessment (Sitree/re $       80
 Frequency of Emergent Tree Assessment     Every two years
 Reactive Treed Area (ha)                          0.71
 Reactive Treed Area (acre)                        1.74
 No. of Trees in Reactive Treed Area              1,549 **assuming trees have an average of 2.1 metres spacing
 % of Trees requiring Reaction pa                   15%
 No. of Trees requiring Reaction pa                 232
 Cost of Tree Reaction (Stree)             $        250
 Cost per year - Tree Reaction             $     58,077

                                                                                                    Page 22 of 25

Section 23

SPECIAL MEETING AGENDA                                                     31 AUGUST 2018


Annual Cost Summary (Inflated) – Full Commercial or Community Use




Annual Lease Revenue Projections – Full Occupancy Assumption




NOTE: The graph below includes a calculation error - refer to report addendum for an updated graph
Annual Net Cash Flows - Full Occupancy Assumption




                                                                               Page 23 of 25

Section 24

SPECIAL MEETING AGENDA                                      31 AUGUST 2018


Annual Net Cost per Ratepayer - Full Occupancy Assumption




Net Present Value Outcomes (Full Occupancy Assumption)




                                                              Page 24 of 25

Section 25

SPECIAL MEETING AGENDA   31 AUGUST 2018




                           Page 25 of 25

SPECIAL MEETING AGENDA                                                                                                                                                                31 AUGUST 2018

                    Scenario 1a    Purchase at Market Value 1. Low commercial lease rate. Council incurs all ongoing land management, operating, maintenance, renewal and replacement costs.
                    Scenario 1b    Purchase at Market Value 1. Mid commercial lease rate. Council incurs all ongoing land management, operating, maintenance, renewal and replacement costs.
                    Scenario 1c    |Purchase at Market Value 1. High commercial lease rate. Council incurs all ongoing land management, operating, maintenance, renewal and replacement costs.
                    Scenario 1d  | Purchase at Market Value 2. Low commercial lease rate. Council incurs all ongoing land management, operating, maintenance, renewal and replacement costs.
   COMMERCIAL       Scenario 1e    Purchase at Market Value 2. Mid commercial lease rate. Council incurs all ongoing land management, operating, maintenance, renewal and replacement costs.
                    Scenario 1f    Purchase at Market Value 2. High commercial lease rate. Council incurs all ongoing land management, operating, maintenance, renewal and replacement costs.
                    Scenario 1g    |Purchase at Market Value 3. Low commercial lease rate. Council incurs all ongoing land management, operating, maintenance, renewal and replacement costs.
                    Scenario 1h  | Purchase at Market Value 3. Mid commercial lease rate. Council incurs all ongoing land management, operating, maintenance, renewal and replacement costs.
                    Scenario 1i    Purchase at Market Value 3. High commercial lease rate. Council incurs all ongoing land management, operating, maintenance, renewal and replacement costs.

                    Scenario 2a    Purchase at Market Value 1. Low commercial lease rate for 50% of the floor space. Council incurs all ongoing land management, maintenance and replacement costs. Operating costs
                                  assumed at 75% of full occupancy to reflect partial lease of the site.
                   Scenario 2b     Purchase at Market Value 1. Mid commercial lease rate for 50% of the floor space. Council incurs all ongoing land management, maintenance and replacement costs. Operating costs assumed
                    seseeeceeeeeseeeee-f Ot.75%. Of full occupancy to reflect partial lease Of the Site. elec cece eeeecceceeeeeeseeeeeeeeeeceeecessececeeeesscceceeessscececeesseceeeeeesesseeeeeeesesceeceeeseseeeeeeeesscceeeeeeseseeeeeeeeeees
                    Scenario 2c    Purchase at Market Value 1. High commercial lease rate for 50% of the floor space. Council incurs all ongoing land management, maintenance and replacement costs. Operating costs
                    ceceeeeeeeeesee---passumed at 75% of full occupancy to reflect partial lease Of the Site. elle ccce cece cee ceccceennneeneececeeececececccccecccsssseeeeeeeceececccccececssessseeeeeeeeeececccecececssssseeeseeeeeeeeeeees
    SCENARIO 2      Scenario 2d    Purchase at Market Value 2. Low commercial lease rate for 50% of the floor space. Council incurs all ongoing land management, maintenance and replacement costs. Operating costs
        PART    ©   | llweseee---/a8SuMed  at 75% of full occupancy to reflect partial lease Of the Site    cece cc cceccsccenceeenceesneessecesnecsseeesneceseeesaeessecesseeseeesseeeneecsseessaeesseeeneeeseeeneeesseeeeaeesseeesesess
                   Scenario 2d     Purchase at Market Value 2. Mid commercial lease rate for 50% of the floor space. Council incurs all ongoing land management, maintenance and replacement costs. Operating costs assumed
   cOER CIAL         en na seaosau+-[St 75% Of full occupancy. to. reflect partial lease of the Site. ooo eccccccceesssescsecessucessesssovsssuesssuesssesssusessuesssvessuvsssussssusssuesssussssssssesssusssiessivessucesssssuesseeessesesseeeseeeeee
      LEASE         Scenario 2f    Purchase at Market Value 2. High commercial lease rate for 50% of the floor space. Council incurs all ongoing land management, maintenance and replacement costs. Operating costs
                    ceceeeeeceeeeeee-passumed at 75% of full occupancy to reflect partial lease Of the Site. ooo lee cece ccc eecccccccceeeenneseeeeceeeeceecccccceeasssssseeeeeeeceececcecceceassssseeeeeeeeeeceeccccceecsssseseeeeeeeeeeeeees
                    Scenario 2g    Purchase at Market Value 3. Low commercial lease rate for 50% of the floor space. Council incurs all ongoing land management, maintenance and replacement costs. Operating costs
                    seseeeceeeeeeeeeee foSsSumed at 75% of full occupancy to reflect partial lease Of the Sie. ooo e cece e eee eeeeceeeeececeeeceeecceeeeeesscceceeeesscceceeesesceeeeesesseceeeeeesceceeeeesseaeeeesssseeeeeeeesseeeeeeeeeees
                    Scenario 2h    Purchase at Market Value 3. Mid commercial lease rate for 50% of the floor space. Council incurs all ongoing land management, maintenance and replacement costs. Operating costs assumed
                    evesseeeeee--------]t 75% Of full occupancy to reflect partial lease Of the site.     ele eeeee cece ce ceccecececeeeneesseeeeeeceecececccccecceesssseseeeececcecccceccccssssseeseeeeceecececececeecesssesseeeeceeeeeeeeeeees
                    Scenario 2i    Purchase at Market Value 3. High commercial lease rate for 50% of the floor space. Council incurs all ongoing land management, maintenance and replacement costs. Operating costs
                                   assumed at 75% of full occupancy to reflect partial lease of the site.

   SCENARIO 3- | Scenario 3a__ | Purchase at Market Value 1. Three community leases at the site. Council incurs all ongoing land management, operating, maintenance, renewaland replacement costs.
    COMMUNITY       Scenario 3b__| Purchase at Market Value 2. Three community leases at the site. Council incurs all ongoing land management, operating, maintenance, renewal and replacement costs.
      LEASE         Scenario 3c | Purchase at Market Value 3. Three community leases at the site. Council incurs all ongoing land management, operating, maintenance, renewal and replacement costs.

                                                                                                                                                                                           Page 25 of 25

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.