Skip to the record
Every meeting, every word.

Original source · versioned page text

2018-08-31 Special Meeting Agenda

of 25

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

SPECIAL MEETING AGENDA   31 AUGUST 2018




                           Page 22 of 25

SPECIAL MEETING AGENDA                                                                         31 AUGUST 2018

 Total land size (ha)                                  11.04 | tHedtare|
 Total land size (acre)                               27.28{    1Acre}      2.47105]
 Total land size (sqm)                              110,400]   ==1sqm}      10,000 |
 Treed area (ha)                                        9.48
 Total building footprint (ha)                       0.2460
 Road (driveway) area (ha)                           0.3460
 Cleared area (ha)                                      0.96
 Cleared area (sqm)                                   9.640
 Fire Trail Establishment (S/km)                $     9.800
 Fire Trail Length (km)                                 1.38 **including increase to 8m buffer
 Fire Trail Maintenance (S$/km/pa)                      365 **slashing 4 times per year
 Hazard Reduction Burn                          $    15,500
 Harzard Reduction Burn Frequency               Every 8 years
 Initial Weed Management (S/pa)                 $      1,602
 Annual Weed Management (S/pa)                  $       400
 No. of High Risk or Large Trees                         16
 Cost per Arborist Report                       $       250

[Mowing
 Mowing cost (S/sqm)                       $       0.03 **from Council mowing contract
 Mowing frequency                          Every three weeks
[Tree Management                                      |
 Tree density (No. of trees/acre)                   889 **assuming trees have an average of 2.1 metres spacing
 % Trees Small                                      30%
 % Trees Medium                                     50%
 % Trees Large                                      20%
 Stump Grind (S/tree)                      $        270
 Maintenance - Small (S/tree)              $        247
 Maintenance - Medium (S/tree)             $        553
 Maintenance - Large (S/tree)              $      1,423
 Removal - Small (Stree)                   $        315
 Removal - Medium (S/tree)                 $        632
 Removal - Large (S/tree)                  $      1,866
 Initial Emergent Tree Assessment (Sitree/repor $   160
 No. of Emergent Trees                               16
 Ongoing Emergent Tree Assessment (Sitree/re $       80
 Frequency of Emergent Tree Assessment     Every two years
 Reactive Treed Area (ha)                          0.71
 Reactive Treed Area (acre)                        1.74
 No. of Trees in Reactive Treed Area              1,549 **assuming trees have an average of 2.1 metres spacing
 % of Trees requiring Reaction pa                   15%
 No. of Trees requiring Reaction pa                 232
 Cost of Tree Reaction (Stree)             $        250
 Cost per year - Tree Reaction             $     58,077

                                                                                                    Page 22 of 25
Log in to download the original file

2018-08-31 Special Meeting Agenda(PDF, 1MB).pdf · 1.1 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.