                                                                                                                                                                                                                                                                                                                          GENERAL NOTES
                                                                                                                             1500                                                                                                                                                                                          1. THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL OTHER CONSULTANTS
                                                                                                                                                                                                                                                                                                                           DRAWINGS AND SPECIFICATIONS. 2. BEFORE PROCEEDING WITH THE WORK ANY DISCREPANCIES




                                                                                                              1500
                                                                                                                                                                                                                                                                                                                           IN THE CONTRACT DOCUMENTS SHALL BE REFERRED FOR DECISION TO THE ENGINEER.




                                                                                                       3000
                                                                                                                                                                                                                                                                                                                           3. DO NOT SCALE FROM DRAWINGS IF IN DOUBT, ASK!!
                                                                                                                                                                      PROPOSED 100MM UPVC SEWER LINE 23930MM                                                                                                               4. CONTRACTOR SHALL VERIFY ALL LOCATIONS OF SERVICES, ALL DIMENSIONS AND LEVELS
                                                                                                                                                                                                                                                                                                                           5. ALL MATERIALS & WORKMANSHIP SHALL BE IN ACCORDANCE WITH AS2890, THE (INCLUDING
                                                                                                                                                                                                                  UNITY WATER ASSET                                                                                        THE QUEENSLAND SUPPLEMENT), THE QUEENSLAND BUILDING ACT AMENDMENT ACT 1991 AND
                                                                                                                                                  PROPOSED MANHOLE                                                                                                                                                         6. THE CONTRACTOR IS RESPONSIBLE TO OBTAIN RELEVANT APPROVALS PRIOR TO
                                                                                                                                                                                                                  MANHOLE 1050                                                                                             7. ALL STORMWATER CULVERTS TO BE RCP CLASS 2. ALL ROOFWATER PIPES TO BE uPVC
                                                                                                     EXISTING BLOCKWORK                           MANHOLE 1050                                                    ASSET ID - 2663533                                                                                       8. SILT MANAGEMENT PLAN TO REMAIN IN PLACE UNTIL COMPLETION OF WORKS AND
                                                                                                     RETAINING WALL 1M                            ASSET ID - TBA                                                  S.L - 11.17                                                                                              9. ALL PROPOSED OPERATIONAL WORKS SHALL BE CONSTRUCTED IN ACCORDANCE WITH                                                                                                                                                                                LINDSAY CONSULTING PTY LTD




                                                                                                     APPROX THROUGHOUT                            S.L - 14.00                                                     I.L - 8.56                                                                                               COUNCIL'S OPERATIONAL WORKS APPROVAL LETTER AND COUNCIL'S DECISION
                                                                                                                                                                                                                                                      SEWER EASEMENT                                                                                                                                                                                                                                                                                                              LINDSAY CONSULTING PTY
                                                                                                                                                  I.L - 8.56                                                                                                                                                               10.CONCRETE KERB RAMPS SHALL BE ALIGNED TO COMPLY WITH COUNCIL'S STANDARD                                                                                                                                                                                                 LTD
                                                                                                                                                  PROPOSED HCB TO ALLOW                                                                                                                                                    DRAWING AND SHALL BE CONSTRUCTED STRICTLY IN ACCORDANCE WITH COUNCIL STANDARD
                                                                                                                                                  FOR 1% MIN GRADE FROM                                                                                                                                                    11. ALL TEMPORARY AND PERMANENT ROAD SIGNS AND LINEMARKING SHALL COMPLY WITH
                                                                                                                                                                                                                                                                                                                           THE CURRENT MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES(M.U.T.C.D.). EXISTING LINE
                                                                                                                                                  INTERNAL SEWER LINE.                                                                                                                                                                                                                                                                                                                                                                                                                                                            RPEQ 4928
                                                                                                                                                                                                                                                                                                                           MARKING SHALL BE REMOVED BY GRINDING NOT"BLACKING OUT". COUNCIL DOES NOT
                                       DRIVEWAY                                                                                                   ESTIMATED IL - 13.184                                                                                                                                                    APPROVE OF BLACKING OUT OF EXISTING LINE MARKING. KERB MARKERS SHALL BE PROVIDED                                                                                                                                                                       OFF. 2C/82 PARKER STREET, MAROOCHYDORE        PH 54 792 118
                                                                                                                                                                                                                                                                                                                           FOR ALL WATER, TELSTRA AND ANY OTHER SERVICE CONDUIT ROAD CROSSINGS AS
                                                                                                                                                                                                                                                                                                                           APPLICABLE.                                                                                                                                                                                                                                           THIS DRAWING REMAINS THE PROPERTY OF
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 LINDSAY CONSULTING PTY LTD AND IS FOR
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   THE SOLE USE OF THE CLIENT. NO PART
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 MAY BE USED IN PART OR WHOLE WITHOUT
 EXISTING INDUSTRIAL SHED
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    PRIOR EXPRESS WRITTEN CONSENT OF
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       LINDSAY CONSULTING PTY LTD
                                                                                                                                                                                                                                                                                                                         STORMWATER DRAINAGE NOTES
                                                                                                                                                                                                                                                                                                                          1.ANY CHANGES SHALL BE APPROVED BY THE ENGINEER IN WRITING PRIOR TO CARRYING OUT
                                                                                                                                                                                                                                                                                                                          OF THE WORKS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                CLIENT AND PROJECT DESCRIPTION
                                                                                                                                                          EXISTING SEWER
                                                                                                                                                                                                                                                                                                                          2.ALL LEVELS TO AHD.
                                                                                                                                                                                                                                                                                                                          3.ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED OTHERWISE.
                                                                                                                                                                                                                                                                                                                          4.ALL DIMENSIONS AND LEVELS ARE TO BE CHECKED ON-SITE BEFORE WORK COMMENCES.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   GE & LK GRAMS
                                                                                                                                                          LINE FROM INDUSTRIAL
                                                                                                                                                          SHEDS TO MANHOLE.
                                                                                                                                                          LINE TO BE DISCONTINED/
                                                                                                                                                                                                                                                                                                                          5. DIMENSIONS SHALL NOT BE OBTAINED BY SCALING THE DRAWING.
                                                                                                                                                                                                                                                                                                                          6. FOR BUILDING SET-OUT REFER ARCHITECTURAL DRAWINGS                                                                                                                                                                                                     PROPOSED SUBDIVISION
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   53-57 RENE ST
                                                                                                                                                                                                                                                                                                                          7. THE LOCATION AND DEPTH OF ALL SERVICES SHALL BE VERIFIED ON SITE WITH THE
                                                                                                                                                          MADE REDUNDANT                                                                                                                                                  REVLEVANT AUTHORITY PRIOR TO THE COMMENCEMENT OF WORKS
                                                                                                                                                          1500 SHORT OF PROPOSED                                                                                                                                          8. DURING CONSTRUCTION BARRIERS, LIGHTS & SIGNS SHALL BE MAINTAINED TO ENSURE SAFE


                                       DRIVEWAY
                                                                                                                                                          BOUNDARY AND DIRECTED
                                                                                                                                                          TO PROPOSED HCB
                                                                                                                                                                                                                                                                                                                          PASSAGE OF TRAFFIC AND PEDESTRIANS IN ACCORDANCE WITH THE REQUIREMENTS OF THE
                                                                                                                                                                                                                                                                                                                          LOCAL AUTHORITY.
                                                                                                                                                                                                                                                                                                                          9.ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH CURRENT LOCAL AUTHORITIES
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   NOOSAVILLE
                                                                                                                                                                                                                                                                                                                          SPECIFICATIONS AND STANDARDS.
                                                                                                                                                                                                                                                                                                                          10.THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING ALL RELEVANT AUTHORITIES
                                                                                                                                                                                                                                                                                                                          AND PAYING ALL FEES NECESSARY BEFORE COMMENCING WORK, FOR LOCATING ALL EXISTING
                                                                                                                                                                                                                                                                                                                          SERVICES AND FOR REPAIR OF ANY SERVICES DAMAGED AS A RESULT OF THE FOOTPATHS
                                                                                                                                                                                                                                                                                                                          AND PRIVATE PROPERTY SHALL BE REINSTATED TO THEIR ORIGINAL CONDITION.
                                                                                                                                                                                                                                                                                                                          11.ANY OBSOLETE/REDUNANT DRIVEWAY CROSSINGS AND DRAINAGE OUTLETS FROM THE
                                                                                                                                                                                                                                                                                                                          KERB AND CHANNEL INCLUDING ASSOCIATED PIPES ACROSS THE FOOTPATH SHALL BE                                                                                                                                                                              DRAWING TITLE
                                                                                                    EXISTING BLOCKWORK                                                                                                                                                                                                    REMOVED AND THE KERB AND CHANNEL AND FOOTPATH REINSTATED TO THE LOCAL
                                                                                                    RETAINING WALL 1M                                                                                                                                                                                                     AUTHORITIES CURRENT SPECIFICATIONS AND OR STANDARDS
                                                                                                                                                                                                                                                                                                                          12.THE CONTRACTOR'S ATTENTION IS DRAWN TO THE REQUIREMENTS OF THE WORKPLACE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   OPERATIONAL WORKS
                                                                                                    APPROX THROUGHOUT
                                                                                                                                                                                                                                                                                                                          HEALTH AND SAFETY ACT 1995. ALL WORK IS TO BE CARRIED OUT IN ACCORDANCE WITH THIS
                                                                                                                                                                                                                                                                                                                          ACT AND IN PARTICULAR THE CONTRACTOR TO ENSURE THE REQUIREMENTS OF THIS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   WATER AND SEWER
                                                                                                                                                                                                                                                                                                                          SPECIFICATION WITH REGARD TO 'NOTIFICATION IN RELATION TO A NOTIFIABLE PROJECT ARE
                                                                                                                                                                                                                                                                                                                          FULFILLED.




                                                                                                                                                          1
                                                                                                                                                                                                                                                                                                                          13.BENCHING OF PIT STRUCTURES SHALL HAVE A SMOOTH FINISHED SURFACE, AND PIPES




                                                                                                                                                   2
                                                                                                                                                                                                                                                                                                                          SHALL NOT PROJECT INSIDE THE SHAFT OF THE PIT.




                                                                                                                                                43
 EXISTING INDUSTRIAL SHED                                                                                                                                                                                                                                                                                                 14.STORMWATER DRAINAGE PIPES SHALL BE UPVC PIPE (MINIMUM SEWER CLASS SN8) TO AS
                                                                                                                                                                                                                                                                                                                          14. 1260 OR APPROVED EQUIVALENT. MINIMUM COVER TO ROOFWATER PIPES SHALL BE 50mm
                                                                                                                                                                                                                                                                                                                          EXCEPT WHERE REDUCED COVER IS REQUIRED TO DISCHARGE TO THE KERB AND CHANNEL.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                SCALES




                                                                                                                                       0
                                                                                                                                                                                                                                                                                                                          15.MINIMUM PIPE GRADES FOR STORMWATER AS 3500 PART 3: PIPES SHALL COMPLY WITH




                                                                                                                                    P1
                                                                                                                                                                                                                                                                                                                                      - 1.0% (MIN) GRADE FOR PIPES < 150 DIA.
                                                                                                                                                                                                                                                                                                                                      - 0.5% (MIN) GRADE FOR PIPES > 150 BUT < 375 DIA.




                                                                                                                            nS                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   A1 - 1:200
                                                                                                                                                                                                                                                                                                                          16.CONCRETE DRIVEWAY AND PARKING AREAS SHALL BE CONSTRUCTED WITH 32 MPa
                                      DRIVEWAY                                                                                                                                                                                                                                                                            17.REFER HYDRAULIC DRAWINGS FOR SANITARY DRAINAGE LAYOUTS.
                                                                                                                                                                                                                                                                                                                          18.COMPACTION OF MATERIAL UNDER CONCRETE DRIVEWWAYS AND PARKING AREAS SHALL BE
                                                                                                                                                                                                                                                                                                                                      (i) 75% MINIMUM DENSITY FOR COHESIONLESS MATERIAL (AS 1289 E5.1) AND
                                                                                                      1o
                                                                                                                                                                                                                                                                                                                                      (ii) 90% RELATIVE DRY DENSITY (STD COMP.) FOR MATERIAL OTHER THAN (i)
                                                                                           T        28
                                                                                        LO




                                                                                                                                                                                                                                                                                                                                                                                              Expansion joints:
                                                                                                                                                                                                                                                                                                                                                                                   Types 1 and 2 at 16.0m centres
                                                                                                                                                                                                                                                                                                                                                                                         Types 3 at 6.0m centres
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                SURVEY DATUM
                                                                                                                                                                                                                                                                                                                                                              Type 1. 10 thick, full depth closed cell cross linked
                                                                                                                                                                                                                                                                                                                                                                                    polyethylene foam (85-150kg/m )



                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  .
                                                                                                                                                                                                                                                                                                                                                              Type 2. 10 thick compressed granulated cork board
                                                                                                                                                                                                                                                                                                                                                            Type 3. Connolly Key Joint with 100mm thick concrete
                                                                                                                                                                                                                                                                                                                                                                     Installation to manufacturers' instructions                         B




                                                                                                                                                                                                                                                                                                  MATCH EXISTING
                    EXISTING CARPARK AND DRIVEWAY                                                                                                                                                                                                                                             C                                                                                                                                                                                                                          C
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                ASSOCIATED CONSULTANTS
                                                                                                                                                                                                                                                                                                                                    Contraction joints at 2.0m centres:
                                                                                                                                                                                                                                                                                                                                                                                                                                         B
                                                                                                                                                                                                                                                                                                                                    25 deep x 6 wide recess, saw cut,                                         PLAN




                                                                                                                                                                                                                                                                                                                                                                                100 or as specified
                                                                                                                                                                                                                                                                                                                                    or crack inducer 25 deep.




                                                                                                                                                                                                                                                                                                                                                                                refer note 5
                                                                                                                                                                                                                                                                                                                                                                                                                                    F72 Fabric (CENTRAL)

                                                                                                      EXISTING BLOCKWORK
                                                                                                      RETAINING WALL 1M                                             PROPOSED BOUNDARY                                                                                                                                            Contraction joint                                                            Compacted sub-grade
                                                                                                                                                                                                                                                                                                                                                                                                                                                                           Expansion Joint
                                                                                                      APPROX THROUGHOUT                                                                                                                                                                                                                                                                               SECTION C - C
                                                                                                                                                                                                                                                                                                                         1450                        1200
                                                                                                                                                                                                                                                                                                                   TO BE CONFIRMED ON-SITE
EXISTING BLOCKWORK
RETAINING WALL REDUCING                                                                                                                                                                                                                                                                                                                                                                                FOOTPATH NOTES
TO APPROX 300MM                                                                                                                                                                                                                                                                                                                                                                                        1. Concrete N25 in accordance with AS 1379 and AS 3600.         6. Concrete footpaths, adjoining existing driveways are to be
                                                                                                                                                                                                                                                                                                                                                                                                       2. All concrete to be broom finished.                              transitioned over a minimum 5.0m length.
                                                                                                                                                                                                                                                                                                                                         SECTION B-B                                                   3. Contraction/expansion joints, 2m MAX spacing.                7. A street opening permit must be obtained from Council, seek
                                                                                                                                                                                                                                                                                                                                                                                                       4. Finished surface tolerance to be maximum +6mm -0mm relative     approval of location and levels prior to excavation.
                                                                                                                                                                                                                                                                                                                                                                                                          to kerb level and crossfall specified.                       8. All dimensions in millimetres.
                                                                                                                                                                                                                                                                                                                                                                                                       5. Thickness to be increased to 125mm at residential vehicular
                                                    GRASS/LANDSCAPINGPROPOSED 600 X 600                                                                                                                                                                                                                                                                                                                   crossings. Reinforce with F72 MIN fabric, 50mm top and edge
                                                                                                                                                                                                                                                                                                                                                                                                          cover. Provide a contraction or expansion joint at both ends

                                                                                        STORMWATER PIT. ALL                                                                                                                                                                                                                                                                                               of thickened section.


                                                                                        INTERAL STORMWATER                                                                                                                                                                                                                                                                    FOOTPATH DETAIL - IF REQUIRED
                                                                                                                                                                                                       - 24045 NOM.                            900X900 FEILD INLET
  GRASS/LANDSCAPING                                                                     TO BE DIRECTED TO                                                  225 UPVC- MIN GRADE 1%                                                                                                                                                                                                                     Not to scale
                                                                                        THIS PIT FOR DISCHARGE                                                                                                                                 ALL LEVELS TO BE
                                                                                        TO COUNCIL NETWORK                                  1000                                                                                               CONFIRMED ONSITE
                                                                                                                                                                                                                                               (375mm discharge) TO
                                                                                                                     1500




                                                                                                                                                                                                                                               BE RELOCATED AS SHOWN
                                                                                                                                                                                                                                         750




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 DANLEY KEY JOINT WITH                                                 20 X 40 JOINT SEALANT
                                                                                                                                                                                                DRIVEWAY CROSSOVER TO
                                                                                                                            750




                                                                                                                                  1500
                                                                                                                                                                                                COMPLY WITH RS-051                                       STORMWATER EASEMENT                                                                                                                                                                                                     R12 DOWELS AT 300CRS

                                                                  Provide 1 No 40mm                                                                                                                                                      EXISTING 150MM
                                                                  Water Meter in accordance                                                                                                                                              WATERMAIN -                                                                                                                                                                                                                                                                       TYPICAL KEY JOINT
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   Not to scale
                                                                  with drawings SCW350, 355 and                                                                                                                                          ASSET ID - 203369                                                                                                                                                                                                                                       CUT EVERY SECOND WIRE DIRECTLY
                                                                                                                                                                                                           6000
                                                                  360                                                                                                                                                                                                                                                                                                                                                                                                                            UNDER JOINT AND DEPRESS FABRIC LOCALLY
                                                                                     EXTEND EXISTING 150MM                                                                                                                                                                VEGETATION            PROTECTION NOTES                                                                                                                                                                                                                                                                REVISION LIST
                                                                                     WATER MAIN TO SERVICE                                                                                                                                                                1. TREES LOCATED ALONG THE FOOTPATH SHALL BE, TRANSPLANTED PRIORTO                                                                                                                                                                                                                                    A ORIGINAL ISSUE                                     11/02/22
                                                                                                                                                                                                                                                                          CONSTRUCTION, OR REPLACED IF DESTROYED.
                                                                                     PROPOSED WATER METER                                                                                                                                                                                                                                                                                                                                                                                                                         SAW CUT - (SC)
                                                                                                                                                                                                                                                                          2. WHEN WORKING WITHIN 4m OF TREES, RUBBER OR HARDWOOD GIRDLES SHALL BE
                                                                                     FOR EXISTING INDUSTRIAL                                                                                                                                                              CONSTRUCTED WITH 1.8m BATTENS CLOSELY SPACED AND ARRANGED VERTICALLY FROM
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        Not to Scale

                                                                                                                                                                                                                        LOCATION OF DRIVEWAY CROSSOVER                                                                                                                                                                                                                                               SAW CUTS (USING A SOFT CUT SAW)
                                                                                     SHEDS                                                                                                                                                                                GROUND LEVEL. GIRDLES SHALL BE STRAPPED TO TREES PRIOR TO CONSTRUCTION AND                                                                                                                                                 SHALL BE INSTALLED WITHING 8HRS
                                                                                                      EXISTING 40MM WATER                                                                                               SHOWN FOR APPROVAL PURPOSES TO                                                                                                                                                                                                                                               OF CONCRETE PLACEMENT. WHERE AMBIENT
                                                                                                                                                                                                                                                                          REMAIN UNTIL COMPLETION.                                                                                                                                                                                                   TEMP IS GREATER THAN 32 DEGREES
                                                                                    33498             METER CURRENTLY BEING                                                                                             A CODE COMPLIANT DRIVEWAY IS POSSIBLE.            3. TREE ROOTS SHALL BE TUNNELLED UNDER, RATHER THAN SEVERED. IF ROOTS ARE                                                                                                                                                  THIS TIME SHALL BE REDUCED TO 4 HOURS
                                                                                                      USED BY EXISTING                                                                                                  PROPOSED LOT DEVELOPER REQUIRED                   SEVERED THE DAMAGED AREA SHALL BE TREATED WITH A SUITABLE FUNGICIDE. CONTACT                                                                                                                                                                                                 SL82 FABRIC (CENTRAL)
                                                                                                      INDUSTRIAL SHEDS. TO BE                                                                                           TO PROVIDE COUNCIL WITH DRIVEWAY                  RELEVANT COUNCIL ARBORIST FOR FURTHER ADVICE.
                                                                                                      DISCONNECTED FROM                                                                                                 CROSSOVER LOCATION                                4. ANY TREE LOPPING REQUIRED SHOULD BE UNDERTAKEN BY AN APPROVED ARBORIST.
                                                                   OPERATIONAL WORKS                  SHEDS AND MADE
                                                                                                      AVAILABLE TO PROPOSED                                                                                                                                                                                                                                                                                                                                                                                                   PAVEMENT DESIGN
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        Not to Scale
                                                                                                      LOT




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      150
                                                                              Protect   your




KEY JOINT
                                                                              PERSONAL

                                                                              INTERESTS.


                                                                                HEAD


SAW JOINT
                                                                              EYES
                                                                              EARS
                                                                                         BODY
                                                                                                                                         It is the responsibility of the                  All proposed operational works shall be constructed
                                                                                                NOTE                                     Foreman to contact the
                                                                      HANDS
                                                                                                THE ENGINEER MUST BE NOTIFIED OF         relevant service authorities to                  in accordance with Council's Operational Works approval                                                                                                                                                                                                                                                                                                                              Computer File
PROPOSED EASEMENT                                                         FEET
                                                                                                CHANGES PLANS. IF NOT, AS
                                                                                                CONSTRUCTED DRAWINGS WILL NOT BE
                                                                                                ISSUED
                                                                                                                                         ascertain the exact location of
                                                                                                                                         services prior to construction.
                                                                                                                                                                                          letter and Council's Decision Notice - Development Permit.                                                                                                                                                                                                                                         PAVEMENT DETAILS - CONCRETE SURFACE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                Not to scale
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 031159CP.DWG
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               DRAWING NUMBER                                     SHEET   REV.

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  03-1159-C1        1 A
Log in to download the original file

031159OW(A).pdf · 2.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 2 pages

Page 2

                      EROSION AND SEDIMENTATION MANAGEMENT PLAN                                                ENVIRONMENTAL DIARY                                                                                                                                                                                                                             CONSTRUCTION MANAGEMENT PLAN
                                                                                                               Sediment Control                                                                         Weekly Visual Inspection or After Rainfall Event
                                                                                                               Project:-                      Operational Works                                                                                                Performance
                                                                                                                                                                                                                                                               Indicators
                                                                                                                                                                                                                                                                                              Item                                       Performance Indicator                CONSTRUCTION MANAGEMENT PLAN DIARY
                                                                                                               Principal:-
                                                                                                               Contractor:-                   GE & LK GRAMS
Objective                Comply with all statutory regulations and maintain erosion and sedimentation                                                                                                                                                                         1. Vegetation                      No disturbance of soil below retained vegetation due to construction                                                                                                                              Weekly Visual Inspection or After Rainfall Event
                                                                                                               Location:-                     53-57 RENE ST, NOOSAVILLE
                         controls throughout the duration of construction. Comply with the intent of the                                                                                                                                                                                                         activities.
                                                                                                               Job Ref.                       03-1129OW                                                                                                                                                                                                                                         Project:-                                Operational Works
                         sedimentation management plan shown on sheet 29 of the drawings prepared
                                                                                                               No:-                                                                                                                                                                                              No work conducted outside specified hours without satisfactory evidence        Principal:-
                         by Noel Covey & Associates, and other measures as deemed necessary to                 Date:-                                   Regular Monitoring (Weekly)                                                                                           2. Hours of Work
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            LINDSAY CONSULTING PTY LTD




                         control erosion and minimise sediment transport.                                                                                                                                                                                                                                        of measures taken to suppress noise and other emissions / dust.                Contractor:-                              GE & LK GRAMS                                                                                                                   LINDSAY CONSULTING PTY
                                                                                                               Approx Time:-                 am/pm      Special Event Monitoring (briefly describe event)                                                                                                                                                                                       Location:-
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             LTD
                                                                                                                                                                                                                                                                                                                                                                                                                                          53-57 RENE ST, NOOSAVILLE
                                                                                                                                          Date    Condition Corrective                                                                                                        3. Lighting                        No resident's complaints regarding construction security lighting.             Job Ref. No:-                             03-1129OW                                                                    Council File Ref. No.
Management Strategy      Site Foreman to identify direction of stormwater land flows and flows resulting             Item                Control Acceptable   Action                                  Corrective Action Taken
                         from construction, and provide sediment fences, rock filter dams, turf strips,            Monitored            Measure              Required                                        (Describe)                                                                                                                                                                         Date:-                                                                   Regular Monitoring (Weekly)                                                                                                                      RPEQ 4928
                         stormwater pit entry filters, and other measures as shown on the plan or as                                    Installed    ü          û                                                                                                             4. Existing Roads                  No abutting public roads contain soil, gravel, clay or other such
                                                                                                                                                                                                                                                                                                                 materials originating from onsite construction activities.                     Approx Time:-                                           am/pm            Special Event Monitoring (briefly describe event)                                                OFF. 2C/82 PARKER STREET, MAROOCHYDORE        PH 54 792 118
                         deemed necessary to prevent uncontrolled stormwater flows over unprotected
                         areas, and avoid sediment transport to waterways and stormwater pits.                      Sediment
                                                                                                                     Fences                                                                                                                                                   5. Signage                         No observed or reported incidents due to inadequacy or absence of                                                                              Date Control
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       Condition           C orrective Action
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             Corrective Action Taken
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         THIS DRAWING REMAINS THE PROPERTY OF
                                                                                                                                                                                                                                                                                                                 signage or other control measures.                                                                        Item   Monitored
                                                                                                                                                                                                                                                                                                                                                                                                                                                           Measure Installed
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      Acceptable                Required
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      (Describe)         LINDSAY CONSULTING PTY LTD AND IS FOR
Tasks and Actions        Erect sediment barriers required, and at other locations as deemed necessary by                                                                                                                                                                                                                                                                                                                                                                                                                                                                   THE SOLE USE OF THE CLIENT. NO PART
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          ü
                                                                                                                      Rock
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   û
                                                                                                                                                                                                                                                                              6. Waste Control                   No complaints from local residents and site is kept tidy at all time
Required                 visual inspection. Temporary rock filter dams are to be placed at all
                         concentrated stormwater flow outlet locations and maintained with fresh filter
                                                                                                                      Filter
                                                                                                                      Dams                                                                                                                                                                                                                                                                                       Retained Vegetation                                                                                                                                     MAY BE USED IN PART OR WHOLE WITHOUT
                         screenings throughout the duration of construction. All earthworks areas to be                                                                                                                                                                       7. Waste Minimisation              No occurrence of illegal dumping onsite and all materials where possible                                                                                                                                                                                   PRIOR EXPRESS WRITTEN CONSENT OF
                         topsoiled and seeded or hydromulched upon completion of profiling. All footpath
                         areas to be provided with a minimum 4m wide turf strip behind kerb and
                                                                                                                  Stormwater
                                                                                                                                                                                                                                                                                                                 have been appropriately recycled.                                                                       Air Emissions
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               LINDSAY CONSULTING PTY LTD
                                                                                                                    Outlets
                                                                                                                                                                                                                                                                              8. Dangerous Goods                 No spillage or seepage of dangerous goods stored onsite.
                         channel immediately after footpath area construction and topsoil profiling is
                         completed. Strategically place filters around all stormwater pits.
                                                                                                                                                                                                                                                                                                                                                                                                                            Noise

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        CLIENT AND PROJECT DESCRIPTION
                                                                                                                    Catchpit                                                                                                                                                  9. Erosion & Sedimentation         No visible signs of sediment laden waters leaving the site.
                                                                                                                     Areas
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           GE & LK GRAMS
                                                                                                                                                                                                                                                                                                                                                                                                                    Security Lighting

                                                                                                                                                                                                                                                                                                                 No works are carried out without implementation of the approved Traffic

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           PROPOSED SUBDIVISION
Performance Indicators   Site Foreman to -                                                                                                                                                                                                                                    10. Traffic Management                                                                                                                     Vibrations


                                check for erosion and sediment flows at base of all embankments                    Pavement                                                                                                                                                                                      Management Plan.
                                                                                                                     Areas
                         ·
                         and other
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           53-57 RENE ST
                                                                                                                                                                                                                                                                              11. Existing Infrastructure                                                                                         Existing Utilities, Roads & Drainage Infrastructure
                                exposed areas after rain;                                                                                                                                                                                                                                                        No unplanned damage to existing utilities and infrastructure.
                                check that rock filter dams are working during rain periods;                       Bottom

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           NOOSAVILLE
                         ·
                                check that all sediment fences and other erosion control                             of                                                                                                                                                       12. Non Conformances                                                                                                         Construction Traffic & Parking
                         ·
                                                                                                                 Embankment                                                                                                                                                                                      All non conformances have been reported and rectified
                         mechanisms are
                                working during rain periods; and                                                Humeceptors/                                                                                                                                                   The site foreman is to monitor the performance of all construction activities and any departure from the                    Waste Minimisation & Recycling
                                clean and maintain filter fabric covers to pits after rain periods.                Gross                                                                                                                                       Monitoring      Construction Management Plan control measures is to be immediately rectified.
                         ·
                                                                                                                  Pollutant
                                                                                                                   Traps                                                                                                                                                                                                                                                                        Erosion & Sedimentation Control (Environmental Diary)
Monitoring               Site Foreman to monitor performance of all sediment controls on a
                         regular weekly basis and after every rainfall event. Any damaged                          Detention                                                                                                                                   Responsible     The site foreman is to be responsible for all inspections and maintenance of the Construction Management
                                                                                                                     Basin
                                                                                                                                                                                                                                                                                                                                                                                                                            Other

                         sediment control item is to be rectified, and trapped silt removed and                                                                                                                                                                Person          Plan.
                         deposited in an area not prone to erosion.
                                                                                                                                                                                                                                                                               The site foreman is to complete the Construction Management Plan Diary (including Environmental Diary for
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        DRAWING TITLE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           CONSTRUCTION M'MENT PLAN
                                                                                                                                                                                                                                                                                                                                                                                                                     Item    Monitored

                                                                                                                     Other                                                                                                                                                     sediment control) on a weekly basis as a minimum, but also after every significant rainfall event (which
Responsible Person       Site Foreman to be responsible for all inspections and maintenance of sediment                                                                                                                                                                        causes site runoff) or other special event affecting the site or any watercourses traversing the site.
                         control measures.                                                                     Any Special Comments:-
                                                                                                                                                                                                                   Signed:-
                                                                                                                                                                                                                                                               Reporting       The Construction Management Plan Diary (in conjunction with the Environmental Diary) shall be completed
                                                                                                                                                                                                                                                                               and delivered to the Superintendent for record and audit purposes with each progress claim for the
                                                                                                                                                                                                                                                                                                                                                                                                Any Special Comments:-                                                                                                                                                     STREET PARKING
Reporting                Site Foreman is to complete the Environmental Diary for sediment control on a                                                                                                                                                                         construction works.
                         weekly basis as a minimum, but also after every significant rainfall event or other
                         special event affecting the sediment control measures. The Environmental Diary
                         shall be completed and delivered to the Superintendent for record and audit                                                                                                                                                                           The site foreman is to arrange all corrective actions, controls and rectification activities, and report on                                                                                                                         Signed:-
                                                                                                                                                                                                                                                               Corrective
                         purposes with each progress claim for the construction works.
                                                                                                                                                                                                                                                               Actions         all measures taken in the Construction Management Plan Diary.                                                                                                                                                                                                                            SCALES
Corrective Actions       The Site Foreman to arrange for installation of additional sediment
                         controls and/or improve maintenance controls and replacement of
                         screenings to filter dams as required, and report on measures taken in
                         the Environmental Diary.




                                                                                                                                                                                                                                                                                                                                                             CONSTRUCTION MANAGEMENT PLAN
                                                                                                                                                                                                                                                           Objective          To comply with all statutory regulations and relevant policies, and minimise the impact on the                 Construction                 11. Implement the erosion and sedimentation control measures and associated management plan contained
                                                                                                                                                                                                                                                                              environment whilst carrying out construction activities in a safe and sustainable manner.                      Management                     in the approved plans.
                                                                                                                                                                                                                                                                                                                                                                                             Tasks and Actions
                                                                                                                                                                                                                                                                                                                                                                                             Required                     12. All earthwork stockpiles are to be kept moist, covered with tarpaulins or otherwise treated to                                            SURVEY DATUM
                                                                                                                                                                                                                                                                                                                                                                                                                            minimise dust emissions and stored in locations which minimise the possibility of the soil entering the
                                                                                                                                                                                                                                                                                                                                                                                                                            stormwater system.
                                                                                                                                                                                                                                                           Management
                                                                                                                                                                                                                                                           Strategy
                                                                                                                                                                                                                                                                              To minimise the environmental and amenity impact of construction activities through onsite proactive
                                                                                                                                                                                                                                                                              approach to construction processes and consequences (cause and effect). Successful integration of
                                                                                                                                                                                                                                                                                                                                                                                                                          13. A construction shakedown area is to be installed at the entrance to the site to reduce unwanted
                                                                                                                                                                                                                                                                                                                                                                                                                            soil from leaving the site via vehicle tyres.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          .
                                                                                                                                                                                                                                                                              activities will achieve ecological sustainability which is recognised as a balance that integrates the                                      14. All site staff and sub contractors shall be directed to use the nominated shakedown entry / exit
                                                                                                                                                                                                                                                                              protection of ecological processes and natural systems, economic development, and maintenance of                                              point.
                                                                                                                                                                                                                                                                              cultural, economic, physical and social wellbeing of people in communities.                                                                 15. Roads abutting the site and affected by the works shall be swept at regular intervals as required,
                                                                                                                                                                                                                                                                                                                                                                                                                            or whenever inspection shows signs of soil / pavement construction material on an abutting road or
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        ASSOCIATED CONSULTANTS
                                                                                                                                                                                                                                                                                                                                                                                                                            at the nominated site entrance.
                                                                                                                                                                                                                                                           Construction      The following schedule of management strategies, tasks and actions for construction works forms the
                                                                                                                                                                                                                                                           Management                                                                                                                                                     16. A high level of site “housekeeping” shall be maintained to ensure that vermin are
                                                                                                                                                                                                                                                                             basis of sustainable management of site construction issues. Irrespective of whether or not an item is
                                                                                                                                                                                                                                                           Tasks and Actions                                                                                                                                              not attracted to poorly disposed of materials. Any waste or materials that have
                                                                                                                                                                                                                                                           Required          included in the following schedule however, the Contractor shall employ best practice measures to
                                                                                                                                                                                                                                                                                                                                                                                                                          been illegally dumped on site shall be removed.
                                                                                                                                                                                                                                                                              achieve sustainable outcomes at all times.
                                                                                                                                                                                                                                                                                                                                                                                                                         17. The Contractor shall provide bins for staff and sub contractors at locations
                                                                                                                                                                                                                                                                              Management Strategy / Action                                                                                                                where food is consumed and shall ensure that such bins are used and emptied at
                                                                                                                                                                                                                                                                                                                                                                                                                          regular intervals.
                                                                                                                                                                                                                                                                              1.Ensure that all staff and sub contractors working on the site are aware of potential environmental
                                                                                                                                                                                                                                                                                                                                                                                                                         18. All materials, be they construction materials or used containers, shall either be
                                                                                                                                                                                                                                                                                  impacts and required minimum environmental control measures and responsibilities before
                                                                                                                                                                                                                                                                                                                                                                                                                          recycled onsite or alternatively transported to a Council approved recycling station
                                                                                                                                                                                                                                                                                  commencement of any site works.
                                                                                                                                                                                                                                                                                                                                                                                                                          or disposal point.
                                                                                                                                                                                                                                                                              2.Disturbance of soils below the canopy of any retained vegetation is to be excluded or otherwise                                          19. Any distillate or other petroleum products or dangerous goods stored onsite are
                                                                                                                                                                                                                                                                                 minimised in accordance with the approved plans.                                                                                         to be in bunded areas, located well clear of any watercourse. Appropriate spill
                                                                                                                                                                                                                                                                              3. No dust emissions shall extend beyond the boundary of the site.                                                                          control kits for any chemicals or stored fuels shall also be provided onsite.
                                                                                                                                                                                                                                                                                                                                                                                                                         20. Best practice management techniques shall be employed to control erosion and
                                                                                                                                                                                                                                                                              4. No odour emissions are detectable beyond the boundary of the site.                                                                       minimise sediment transport onsite, including those details contained in the
                                                                                                                                                                                                                                                                              5.Work, including plant and equipment maintenance and servicing, shall only be carried out between the                                      approved plans and the Erosion and Sedimentation Management Plan.
                                                                                                                                                                                                                                                                                 hours of 6:30am and 6:30pm Monday to Saturday inclusive. Written agreement must be provided by                                          21. The Contractor shall prepare and implement an approved Traffic Management
                                                                                                                       EXISTING                                                                                                                                                  neighbouring residents if any work activity with the potential to emit excessive noise is to be                                          Plan for site construction activities. The Traffic Management Plan shall be
                                                                                                                       DRIVEWAY                                                                                                                                                  undertaken outside the above mentioned hours, and even with such consent, such activities are to be                                      provided to the Council inspector and the Supervising Engineer at the prestart
                                                                                                                                                                       PROPOSED
                                                                                                                                                                                                                                                                                 minimised.                                                                                                                               meeting.
                                                                                                                                                                                                                                                                                                                                                                                                                         22. Comply with any conditions of Council's operational works approval applicable to
                                                                                                                                                                       DRIVEWAY
                                                                                                                                                                                                                                                                              6.All equipment shall be acoustically treated with manufacturer supplied muffler systems with ensure
                                                                                                                                                                                                                                                                                                                                                                                                                          the works.
                                                                                                                                                                                                                                                                                 that equipment does not create environmental harm or excessive noise.
                                                                                                                                                                                                                                                                                                                                                                                                                         23. All public complaints received by the Contractor must be recorded in writing,
                                                                                                                                                                                                                                                                              7.Temporary security lighting for the site must be designed and located to ensure that its effects are                                      including any investigations undertaken, conclusions reached and actions taken as
                                                                                                                                                                                                                                                                                 not obtrusive and direct light spill does not alter the amenity of adjacent properties.                                                  a result of same. This complaints record is to be made available to the
                                                                                                                                                                                                                                                                                                                                                                                                                          administering authority on request.
                                                                                                                                                                                                                                                                              8.All existing utilities (roads, drainage, electrical and communication) on or adjacent the site are to be
                                                                                                                                                                                                                                                                                 protected and maintained at all times, with the cost of any damage to such infrastructure to be
                                                                                                                                                                                                                                                                                                                                                                                                                         24. All site personnel are to report any significant non-conformances to the site                                                              REVISION LIST
                                                                                                                                                                                                                                                                                 met by the Contractor.
                                                                                                                                                                                                                                                                                                                                                                                                                          manager as soon as practical and within 1 hour of the occurrence of, or                                                                       A ORIGINAL ISSUE                                     11/02/22
                                                                                                                                                                                                                                                                                                                                                                                                                          observance of same.
                                                                                                                                                                                                                                                                              9. Any areas of high risk / danger on the site are to be adequately signposted.                                                            25. The contractor shall prepare an informative letter to be dropped to
                                                                                                                                                                                                                                                                              10. Vibration beyond the site boundary from construction activities is to be minimised and where there is                                   residents/businesses adjacent to the development. The letter is to advise contact
                                                                                                                                                                                                                                                                                  a likelihood of such vibration extending beyond the boundaries to an adjoining property owner, the                                      details for communications for the site manager, working hours, projected timing
                                                                                                                                                                                                                                                                                  property owner shall be advised accordingly.                                                                                            of works and any other information the contractor sees relevant.



                                                                                                                                                                                      PARKIN
                                                                                                                                                                                             G LAYO
                                                                                                                                                                                     ON ST           UT SH
                                                                                                                                                                                           REET            OWING
                                                                                                                                                                                                 CAR PA           THE LO
                                                                                                                                                                                                        RKING            SS OF
                                                                                                                                                                                              OF TH            PLACES          TWO
                                                                                                                                                                                                    E PROP             AS A
                                                                                                                                                                                                           OSED              RESULT
                                                                                                                                                                                                                 DRIVEW
                                                                                                                                                                                                                        AY




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       Computer File
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         031159CP.DWG
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       DRAWING NUMBER                                     SHEET   REV.

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          03-1159-C2        2 A

Page 3

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                SEDIMENT AND EROSION
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   CONTROL DETAILS
                                                                                                                                                                                                                                                                                                                                                                                                                                    GRATE TO BE GEOFABRIC


                                                OPEN CONCRETE BLOCKS                                                            SEDIMENT AND EROSION                                                                                                                                                                                                                                                                                WRAPPED.




                                                                                                                                   CONTROL DETAILS                                                                                                                                                                                                                                                                                                SPACER BLOCK                        EARTH BUND CONSTRUCTION NOTES
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             OVERLA
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      1. BUILD WITH GRADIENTS BETWEEN 1 PERCENT AND 5 PERCENT.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      2. AVOID REMOVING TREES AND SHRUBS IF POSSIBLE - WORK AROUND THEM.                                              ND FLOW                  TRAPPED SEDIMENT
                                                                                                                                                                                                                                                                                                                                                                                     ROLL OF NETTING FILLED
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      3. ENSURE THE STRUCTURES ARE FREE OF PROJECTIONS OR OTHER IRREGULARITIES THAT COULD IMPEDE                                                       TURF STRIPS
                                                                                                               ALL EROSION AND SEDIMENT IN ACCORDANCE WITH IN ACCORDANCE WITH                                                                             UNDISTURBED AREA
                                                                                                                                                                                                                                                                                                                                                                                     WITH 50 TO 70mm GRAVEL.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         WATER FLOW.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      3. BUILD THE DRAINS WITH CIRCULAR, PARABOLIC OR TRAPEZOIDAL CROSS SECTIONS, NOT V SHAPED.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         LINDSAY CONSULTING PTY LTD




                                                                                                                 WITH MAROON BOOK MANUAL FOR EROSION AND SEDIMENT CONTROL                                                                                                                                                                                                                                KERB INLET PROTECTION                                                        4. ENSURE THE BANKS ARE PROPERLY COMPACTED TO PREVENT FAILURE.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      5. COMPLETE PERMANENT OR TEMPORARY STABILISATION WITHIN 10 DAYS OF CONSTRUCTION.                                                                                                                                 LINDSAY CONSULTING PTY
                                                                                                                                                                                                                                                                                                                                                                                                                         NTS                                                                                                                                                                                                                                                                                              LTD
                                 GRAVEL FILTER
                          SANDBAG OVERLAP               4.0m MIN.
                          ONTO KERB                                                                                                                                                                                                                                                                                                                                                                                                                                                                            DIRECTION OF FLOW
                                                                                                                GEOTEXTILE                STAKES
                                                                                                               FILTER FABRIC                                                                    STAKES
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               TYPICAL GRASS FILTER STRIP DETAIL                                                                                                                       RPEQ 4928
                                                                                                                                                                                                                          DROP INLET                                                                                       1.5m TIMBER STAKES                                                           OVERLA
                                                                                                              RUNOFF WATER                                                                                                WITH GRATE                                                                                                                                                                          ND FLOW     TRAPPED SEDIMENT
                                                                                                              WITH SEDIMENT                                                                                                                                                                                                AT MAX 2.5m CENTRES                                                                                                                                                                                                                                                                                 N.T.S.                                                                  OFF. 2C/82 PARKER STREET, MAROOCHYDORE        PH 54 792 118
                                   1.5m MI




                        RUNOFF
                                                                                                                                                                                                                                                                                                                                                                                                                                  TURF STRIPS                                                                                                       BATTER GRADE
                                                                                                                                                                                                                                                                    DISTURBED                                                                                                                                                                                                                                                                       1:2 max.
            600mm (NOM) GAP
                                                                                                                             0.2m                                                                                                                                   AREA
                                                                                                                                                                                                                                                                                      DIRECTION OF FLOW                                                                                                                                                                                                                                                                                                                                                                                               THIS DRAWING REMAINS THE PROPERTY OF
                                       N.




            BETWEEN SAND BAGS                                                                                                                                     GEOTEXTILE                                                                                                                                                                                                                                                                                                     CHANNEL STABILISATION                                                             UNDISTURBED
                                                                                                                                            FILTERED                                                                                                                                                                                                                                                                                                                             AS REQUIRED
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      LINDSAY CONSULTING PTY LTD AND IS FOR
            ACT AS SPILLWAY                                                                                  BURIED FABRIC                                        FILTER FABRIC                                                                                                                                                                                                                                                                                                                                                                                    AREA
                                                                                                                                             WATER
                THREE LAYERS OF                                                                                                                                                                                                                                                                 SEDIMENT FENCE                                                                                                                                                                                             NOTE:-
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           Min. GRADE 0.25%
                SANDBAGS WITH ENDS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        THE SOLE USE OF THE CLIENT. NO PART
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           Max. GRADE 0.75%
                OVERLAPPED.
                                                                                                                                    GEOTEXTILE INLET FILTER                                                                                                                                                                                                                                     TURF FLARES TO
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           MUST HAVE A STABILISED OUTLET.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           MAYBE USED AS CONTOUR DRAINS
              DOWN STREAM GULLY PROTECTION DETAILS                                                                                                                                                                           STAKES DRIVEN INTO GROUND                           W                                                                                                              RESTRICT SCOURING

                                             NOT TO SCALE                                                      GEOTEXTILE INLET FILTER CONSTRUCTION NOTES                                                                                        FL
                                                                                                                                                                                                                                                    OW
                                                                                                                                                                                                                                                                              FLO                                                                                                               ALONG TURF EDGE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      MAY BE USED IN PART OR WHOLE WITHOUT
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         PRIOR EXPRESS WRITTEN CONSENT OF
                                                                                                               1. FABRICATE A SEDIMENT BARRIER FROM GEOTEXTILE.                                                           GEOTEXTILE FILTER FABRIC                                                                                                                                                TURF STRIP
                                                                                                               2. FOLLOW DETAIL FOR SEDIMENT FENCE FOR GEOFABRIC                                                                                                                                                                                                                                  BEHIND KERB                                                                                                             CAN BE CONSTRUCTED WITH
                                                                                                                  INSTALLATION. REDUCE PICKET SPACINGS TO 1m CENTRES.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        GRADIENT OF DRAIN OR WITHOUT CHANNEL
                       FLOW
                                                               BURY THE TOP OF THE PLASTIC
                                                               IN TRENCH MIN 300mm DEEP.
                                                               STAPLE AT 150mm CENTRES.
                                                                                                               3. DO NOT COVER THE INLET WITH GEOTEXTILE UNLESS THE
                                                                                                                  DESIGN IS ADEQUATE TO ALLOW FOR ALL WATERS TO
                                                                                                                  BYPASS IT.                                                                                                                                                             FLO
                                                                                                                                                                                                                                                                                            W                    23                24
                                                                                                                                                                                                                                                                                                                                                                                                                                     road surface
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        1% to 5%
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  DIRECTION
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         ALL BATTER GRADES
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         2(H):1(V) MAX.                                                                                                 SURFACE ROUGHENING                                  LINDSAY CONSULTING PTY LTD




                                                                                                                                                                                                                                                                                                                                                25
                                                               COMPACT SOIL OVER BLANKET                                                                                                                                                                                                                                                                                                                                                                                                          OF FLOW




                                                                                                                                                                                                                                                                                                                                                           26
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     CLIENT AND PROJECT DESCRIPTION
                                                                                                                                                                                                                                                                                                           PRO                                       A                                                                                                                                       150 mm min.                                     300 mm min.
                                                                                                                                                                                                                                                                                                              PER
                                                                                                                                                                                                                                                                                                                      TY                                                                                                                                                                                                                                                                                                                                                        SPILLWAY
         CENTRELINE SECTION AT POINTS "A"                                                                                                                                                                                                                                           HOLD IN PLACE
                                                                                                                                                                                                                                                                                    WITH SAND BAGS
                                                                                                                                                                                                                                                                                                                           LINE
                                                                                                                                                                                                                                                                                                                                                SEDIMENT
                                                                                                                                                                                                                                                                                                                                                                90 DEG
                                                                                                                                                                                                                                                                                                                                                                                                          GRASSED     FILTER STRIPS                                                                                   2 metres min.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               150 MM MIN.      150 MM MIN.
                                                                                                                                                                                                                                                                                                                                                 TRAP


                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        GE & LK GRAMS
                                                            FILL TRENCH WITH SOIL
                                                                                                                                                                                               nt                                                                GEOTEXTILE FILTER SOCK                                                              A                                                          NOT TO REGULAR SCALE                                                                     NOTE: ONLY TO BE USED AS TEMPORARY BANK
                                                            AND COMPACT
                                                                                                                                                                                  lig   nme                                                                      FILLED WITH 25MM GRAVEL                                                                                                                                                                                                                 WHERE MAXIMUM UPSLOPE LENGTH IS 80 METRES.
        OVERLAP-BURY UPPER END OF                                                                                                                          15.0                yA
    LOWER BLANKET AS IN "A". OVERLAP                      STAPLES: 8
                                                          GAUGE (4mm)
                                                                                                                                                       M   IN  m
                                                                                                                                                                     Pro
                                                                                                                                                                           pert
                                                                                                                                                                                    Berm (300mm MIN height)                                                                                                                                                                         STORMWATER TREATMENT DETAILS                                                                                      EARTH BUND CUT OFF DRAIN                                                                 AGGREGATE OR RECYCLED CONCRETE.                                   ROCK TRENCHED 200 MM INTO GROUND
     END OF TOP BLANKET 300mm AND                                                                                                                                                                                              KERB INLET PIT SEDIMENT BARRIER
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        PROPOSED SUBDIVISION
                                                          WIRE
                 STAPLE AT 150 CRS.                                                                                      NOM                                                                                                                                                                                                            SEDIMENT
                                                                                                                                                                                                                                                                                                                                                                                    SEDIMENT FLOCCULATION
                                                                                                                         200
                                                                                                                                                                                                                                                                                                                                         TRAP                                                                                                                                                                                                                                                                                                   FLO
                         FLOW                                                                                                                                                                                                                                                                                                                                                       The job of a flocculent is to effectively break down the dominance of the clay particles that contain a residual negative eleCIRCUITro-magnetic charge and thus allowing individual particles                                                                  W
                                                                                                                                                                                                                                                                                                                                  50m                      NOTE: POINTS A AT SAME   to be drawn together and settle under gravity.
                                                                                                      Geotextile fabric,                                                                                                                                                                                                                  MAX              ELEVATION


                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        53-57 RENE ST
                                                                                                      Bidum U34 or similar                                                                                               1.5m TIMBER STAKES
                                                                                                                                                                   3.0
                                                                                                                                                                       m
                                                                                                                                                                                                                         AT MAX 2.5m CENTRES                                                                                                                                        METHOD OF APPLICATION
                                                                                                                                                                     MIN
            CENTRELINE SECTION AT POINTS "B"                                         Unbound pavement material (gravel) to Grading                                                  han
                                                                                                                                                                                          nel
                                                                                                                                                                                                        dwa
                                                                                                                                                                                                              y                                             SELF-SUPPORTING
                                                                                                                                                                                                                                                            GEOTEXTILE                                          SEDIMENT FENCES
                                                                                                                                                                                                                                                                                                                                                                                    Large sediment basins such as the one this site, require that the gypsum is mixed into a slurry with water and then sprayed over the surface of the turbid water in the sediment
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       SPACING OF CHECK DAMS ALONG CENTRELINE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       AND SCOUR PROTECTION BELOW EACH CHECK
                                                                                     B, Table 9 of QT Specification MRS11.05,                                                 &c                    a                                                                                                                                                                               basin.   It is essential that the gypsum is spread evenly over the entire surface for efficient treatment of the turbid water.                                                                                                                                     DAM TO BE SPECIFIED ON SWMP/ESCP
                                                                                                                                                                                               w ro                                                                                                                                                                                                                                                                                                                                                                                                                                   ROCK CHECK DAM
                                                                                     exclude material finer than sieve 2.36mm                                         Kerb                                                                                                                                Sediment Fence installed across the contour
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        NOOSAVILLE
                                                                                                                                                                                           e                                                                                                                                                                                        Generally the gypsum should be applied at a rate of about 32 kgm per 100 cubic metres of detained turbid water, as per the adjacent table. The above dosing rate for the site
                                                                                                                                                                                       rn
                                                    A                                                                                                                  Exis
                                                                                                                                                                             ting
                                                                                                                                                                                  ,o
                                                                                                                                                                                                                  500mm TO 600mm                         DIRECTION OF
                                                                                                                                                                                                                                                         FLOW                                             - uncontoured concentration of flow should be avoided
                                                                                                                                                                                                                                                                                                                                  NOT TO REGULAR SCALE
                                                                                                                                                                                                                                                                                                                                                                                    should be calibrated after the first two storm events to assess the actual flocculent application rate and settling time required for the site.
                                                                                                                                                                                                                                                                                                                                                                                    The final application rate should be sufficiently high to permit adequate sediment sediment flocculation (less than 50 NTU) and basin dewatering within two days (48 hours) from the
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    ROCK CHECK DAM CONSTRUCTION NOTES
                                                                                                                                                                                                                                                                                                                                                                                    conclusion of each storm event, whilst maintaining other required water quality criteria such as pH (6.5 - 8.5) and dissolved oxygen (>80%).
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    1. CHECK DAMS CAN BE BUILT WITH VARIOUS MATERIALS, INCLUDING ROCKS, LOGS, SANDBAGS AND STRAW BALES. THE
                                                                                                              Runoff from pad directed to sediment trap                                                             600mm MIN    ON SOIL, 150mm x 100mm
                                                                                                                                                                                                                                                                                                                                                                                    METHOD OF TESTING THE STORMWATER                                                                                                                                                                   MAINTENANCE PROGRAM SHOULD ENSURE THEIR INTEGRITY IS RETAINED, ESPECIALLY WHERE CONSTRUCTED WITH STRAW
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       BALES. IN THE CASE OF BALES, THIS MIGHT REQUIRE THEIR REPLACEMENT EVERY TWO TO FOUR MONTHS.
                                                                                                                                                                                                                                                                                                                                                                                    The stormwater detained in the sediment basin will be tested at a suitable location that will be decided upon at the site. The sample should be taken at a location that has adequate
                                                                                                                                                                                                                                 TRENCH WITH COMPACTED                                                                                                                              access so no sediment is resuspended while the testing is being conducted.                                                                                                                      2. TRENCH THE CHECK DAM 200 MM INTO THE GROUND ACROSS ITS WHOLE WIDTH. WHERE ROCK IS USED, FILL THE
                                                                                                                                                                                                                                 BACKFILL AND ON ROCK, SET                                                                                                                          The stormwater detained in the sediment basin will be tested with the TPS 90-FLT water quality logger. The TPS 90-FLT unit samples and records the dissolved oxygen, conductivity,                 TRENCHES TO AT LEAST 100 MM ABOVE THE GROUND SURFACE TO REDUCE THE RISK OF UNDERCUTTING.
                                                B                                                        TEMPORARY CONSTRUCTION ENTRY/EXIT SEDIMENT TRAP
                                                                                                         Not to Scale
                                                                                                                                                                                                       SECTION DETAIL INTO SURFACE CONCRETE                                                                                                                                         pH, turbidity and temperature of the stormwater. For further details and specifications on the TPS 90-FLT please refer to Appendix B.
                                                                                                                                                                                                                                                                                                                                                                                    If the TPS 90-FLT unit is not present a practical field test that approximates the required 50 NTU level is to fill a clear plastic or glass 65mm diameter soft drink bottle with the
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    3. NORMALLY, THEIR MAXIMUM HEIGHT SHOULD NOT EXCEED 600 MM ABOVE THE GULLY FLOOR. THE CENTRE SHOULD
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       ACTING AS A SPILLWAY, BEING AT LEAST 150 MM LOWER THAN THE OUTER EDGES.
                                                                                                                                                                                                                                                                                                                                                                                    water and then hold it up to the light. If seeing clearly through the sample is not possible, then the sample is probably above the 50 NTU level.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    4. SPACE THE DAMS SO THE TOE OF THE UPSTREAM DAM IS LEVEL WITH THE SPILLWAY OF THE NEXT DOWNSTREAM
                                                                                                                                                           CATTLE GRID 3.0m NOM WIDTH                                                                                                                                                                                                                                                                                                                                                                                                  DAM.
     STAPLE BLANKETS                                                                                                                                           SET 300mm ABOVE GROUND
          AT GRID OF
         1m CENTRES
                                                                                                                           CONSTRUCTION SITE       5
                                                                                                                                                MIN m
                                                                                                                                                                                                                                                                                                                                                                                    METHOD OF DEWATERING
                                                                                                                                                                                               NT
                                                                                                                                                                                           NME
                                        B                                                                                                                                                                                                                                                                                                                                           The sediment basin can be dewatered as soon as the water quality criteria met (refer table below). A pump is to be used to decant the basin with a floating inlet to prevent the
                                                                                                                                    NOM




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     DRAWING TITLE
                                                                                                                                    200




                                                                                                                                                                                      ALIG
                                                                                                                                                                                                                                                                                                                                                                                    settled sediments from being removed from the basin. The pumping must cease prior to the settled sediments being drawn into the intake pipe, it is essential that materials from
                                                                                                                                                                10                 TY                                                                                                                                                                                               the sediment layer are not discharged in the pumping process.                                                                                                                                                                                                                      STABILISE STOCKPILE
                                                                                                                                                             MIN m             PER       EL                                                                                                              SEDIMENT FENCE CONSTRUCTION NOTES                                                                                                                                                                                                                                                                                         AX.)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       SURFACE
                                                                                                                                                                           PRO HANN                                                                                                                  ;                                                                                                                                                                                                                                                                                           EARTH BANK                                            2:1
                                   B                                                                                                                                                                                                                                                                 1. CONSTRUCTION SEDIMENT FENCES AS CLOSE AS                                                                                                                                                                                                                                                                               E (M
                                         FLOW




                                                                                                                                                                                  C         Y                                                                                                                                                                                                                                                                                                                                                                                                                              P                                 SLO
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       SLO
                                                                                                                                                                                        DWA
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        EROSION AND SEDIMENT
                                                                                                  GEOFABRIC FABRIC, BIDIM A34                                                   &                 KERB INLET PIT SEDIMENT BARRIER                                                                    POSSIBLE TO BEING PARALLEL TO THE CONTOURS OF THE                                                                                                                                                                                                                               FLOW                                                                       PE
                                                                                                                                            300




                                                              STAPLE OUTSIDE EDGES                OR SIMILAR                                                               ERB      ROA                                                                                                              SITE, BUT WITH SMALL RETURNS. THE CATCHMENT AREA                                STORMWATER DISCHARGE QUALITY CRITERIA                                                                                                                                                                                       2:1                                                 (MA
                                                              AT 300mm CRS.                                                                                  3MmIN K NEW                          CONSTRUCTION NOTES                                                                                 SHOULD BE       SMALL ENOUGH TO LIMIT WATER FLOW IF
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        X.)
                                                                                                                                                                           OR                     1. FABRICATE A SLEEVE FROM GEOTEXTILE OR WIRE MESH

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        CONTROLS
                                                                                                                                                                                                                                                                                                     CONCENTRATED AT ONE POINT.
                                                                                                                                                                        G,                           LONGER THAN THE LENGTH OF THE INLET PIT AND FILL
                                                                                                                                                                                                                                                                                                                                                                                       ACCEPTABLE       TSS         ACCEPTABLE       PH         DISSOLVED    O2
                                                                                                  RUNOFF TO BE DIRECTED TO A SEDIMENT TRAP,
                                                                                                                                                             E  X ISTIN                              WITH 25mm TO 50mm GRAVEL.
                                                                                                                                                                                                                                                                                                     2. CUT A 150-mm DEEP TRENCH ALONG THE UPSLOPE
                                                                                                                                                                                                                                                                                                     LINE OF THE FENCE FOR THE BOTTOM OF THE FABRIC TO
                                                                                                  REFER STANDARD DRAWING D-0041.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       SEDIMENT FENCE
                       CLEAN/DIRTY DIVERSION DRAINS                                                                                                                                               2. FORM AN ELLIPTICAL CROSS-SECIRCUITION APPROX. 150mm                                             BE ENTRENCHED.
                                                                                                                                                                                                                                                                                                     3. DRIVE TIMBER STAKES INTO GROUND AT 2.5m
                                                                                                                                                                                                                                                                                                                                                                                       50mg/L                           6.5 - 8.5                   > 80%
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           TOPSOIL STOCKPILE
                                                                                                                                                                                                     HIGH, 400mm WIDE.
                                                                                                                  TEMPORARY ENTRY/EXIT                                                            3. PLACE THE FILTER AT OPENING LEAVING AT LEAST                                                    INTERVALS (MAX) AT THE DOWNSLOPE EDGE OF THE TRENCH.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      TOPSOIL STOCKPILE CONSTRUCTION NOTES
                                                                                                                                                                                                     100mm BETWEEN KERB INLET AND SLEEVE. MAINTAIN                                                   4. FIX SELF-SUPPORTING GEOTEXTILE TO THE UPSLOPE
DIVERSION DRAIN CONSTRUCTION NOTES                                                                                                                                                                   OPENING WITH SPACER BLOCKS.                                                                     SIDE OF THE POSTS ENSURING IT GOES TO THE BASE OF                               SEDIMENT BASIN FLOCCULENT APPLICATION                                                                                                                                                            1. PLACE STOCKPILES MORE THAN 2 (PREFERABLY 5) METRES FROM EXISTING VEGETATION, CONCENTRATED
                                                                                                                                                                                                  4. FORM A SEAL WITH KERB TO PREVENT SEDIMENT                                                       THE TRENCH. FIX THE GEOTEXTILE WITH WIRE RECOMMENDED                                                                                                                                                                                                                                WATER FLOW, ROADS AND HAZARD AREAS.
1. REMOVE ANY ROCKS, CLODS, STICKS OR GRASS FROM THE SURFACE BEFORE LAYING PLASTIC.
                                                                                                  TEMPORARY ENTRY/EXIT CONSTRUCTION NOTES                                                                                                                                                             BY THE MANUFACTURER. THE USE OF SHADE CLOTH FOR
                                                                                                                                                                                                     BYPASS.                                                                                                                                                                                                                                                                                                                                                                          2. CONSTRUCTION ON THE CONTOUR AS LOW, FLAT, ELONGATED MOUNDS.
2. ENSURE THAT TOPSOIL IS AT LEAST 75mm DEEP.                                                                                                                                                     5. SANDBAGS FILLED WITH GRAVEL CAN SUBSTITUTE FOR                                                   THIS PURPOSE IS NOT SATISFACTORY.                                              AGENT          INDICATIVE      DOSAGE          COMMENTS                               PRECAUTIONS        &   CONSTRAINTS           MIN.   REQD.    ON   SITE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      3. WHERE THERE IS SUFFICIENT AREA, TOPSOIL STOCKPILES SHALL BE LESS THAN 2 METRES IN HEIGHT.
                                                                                                  1. STRIP THE TOPSOIL, LEVEL THE SITE AND COMPACT THE SUBGRADE.                                                                                                                                     5. JOIN SECTIONS OF THE FABRIC AT A SUPPORT POST
3. ENSURE PLASTIC WILL BE CONTINUOUSLY IN CONTACT WITH THE SOIL BY GRADING THE SURFACE            2. COVER THE AREA WITH NEEDLE-PUNCHED GEOTEXTILE.                                                  THE MESH OR GEOTEXTILE PROVIDED THEY ARE PLACED                                                                                                                                                                                                                                                                                                                                  4. WHERE THEY ARE TO BE IN PLACE FOR MORE THAN 10 DAYS, STABILISE FOLLOWING THE APPROVED
   CAREFULLY FIRST.                                                                                                                                                                                  SO THAT THEY FIRMLY ABUT EACH OTHER AND                                                         WITH A 150mm OVERLAP.                                                            GYPSUM        32kg/100cub.m                   LITTLE PH CHANGE, SLIGHT INCREASE IN   NEEDS TO BE SPREAD EVENLY ACROSS POND.      260 kgm                                                           ESCP OR SWMP TO REDUCE THE C-FACIRCUITOR TO LESS THAN 0.10.
                                                                                                  3. CONSTRUCTION A 200mm THICK PAD OVER THE GEOTEXTILE USING ROAD BASE OR 30mm.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     SCALES
4. LAY FABRIC IN "SHINGLE FASHION", WITH THE END OF EACH UPSTREAM ROLL OVERLAPPING THOSE                                                                                                                                                                                                             6. BACKFILL THE TRENCH OVER THE BASE OF THE FABRIC                                                                             SALINITY                               CAN CAUSE SCUM DEPOSITS IN EQUIPMENT.                                                                      5. CONSTRUCTION EARTH BANKS (STANDARD DRAWING 5-5) ON THE UPSLOPE SIDE TO DIVERT WATER AROUND
                                                                                                  4. ENSURE THE STRUCTURE IS AT LEAST 15m LONG OR TO BUILDING ALIGNMENT AND AT                       SEDIMENT LADEN WATERS CANNOT PASS BETWEEN.                                                       AND COMPACT IT THOROUGHLY OVER THE GEOTEXTILE.
   DOWNSTREAM. ENSURE EACH ROLL IS ANCHORED PROPERLY AT ITS UPSLOPE END.                             LEAST 3m WIDE.                                                                                                                                                                                                                                                                                                                                                                                                                                                                      STOCKPILES AND SEDIMENT FENCES (STANDARD DRAWING 6-8) 1 TO 2 METRES DOWNSLOPE.
5. ENSURE FULL WIDTH OF FLOW CHANNEL IS COVERED BY THE PLASTIC.                                                                                                                                                                                                                                                                                                                      NOTE: NOTIFY ENGINEER TO CONFIRM DOSAGES & APPLICATION PRIOR TO USE.
                                                                                                  5. WHERE SEDIMENT FENCE JOINS ONTO THE STABILISED ACCESS, CONSTRUCTION A HUMP OR
                                                                                                     GRATE IN THE STABILISED ACCESS TO DIVERT WATER TO THE SEDIMENT FENCE.




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     SURVEY DATUM

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       .

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     ASSOCIATED CONSULTANTS




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     REVISION LIST
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     A ORIGINAL ISSUE                                     11/02/22




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Computer File
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      031159CP.DWG
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    DRAWING NUMBER                                     SHEET   REV.

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       03-1159-C3        3 A

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.