Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

031159Ow(A)

of 3

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                SEDIMENT AND EROSION
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   CONTROL DETAILS
                                                                                                                                                                                                                                                                                                                                                                                                                                    GRATE TO BE GEOFABRIC


                                                OPEN CONCRETE BLOCKS                                                            SEDIMENT AND EROSION                                                                                                                                                                                                                                                                                WRAPPED.




                                                                                                                                   CONTROL DETAILS                                                                                                                                                                                                                                                                                                SPACER BLOCK                        EARTH BUND CONSTRUCTION NOTES
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             OVERLA
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      1. BUILD WITH GRADIENTS BETWEEN 1 PERCENT AND 5 PERCENT.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      2. AVOID REMOVING TREES AND SHRUBS IF POSSIBLE - WORK AROUND THEM.                                              ND FLOW                  TRAPPED SEDIMENT
                                                                                                                                                                                                                                                                                                                                                                                     ROLL OF NETTING FILLED
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      3. ENSURE THE STRUCTURES ARE FREE OF PROJECTIONS OR OTHER IRREGULARITIES THAT COULD IMPEDE                                                       TURF STRIPS
                                                                                                               ALL EROSION AND SEDIMENT IN ACCORDANCE WITH IN ACCORDANCE WITH                                                                             UNDISTURBED AREA
                                                                                                                                                                                                                                                                                                                                                                                     WITH 50 TO 70mm GRAVEL.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         WATER FLOW.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      3. BUILD THE DRAINS WITH CIRCULAR, PARABOLIC OR TRAPEZOIDAL CROSS SECTIONS, NOT V SHAPED.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         LINDSAY CONSULTING PTY LTD




                                                                                                                 WITH MAROON BOOK MANUAL FOR EROSION AND SEDIMENT CONTROL                                                                                                                                                                                                                                KERB INLET PROTECTION                                                        4. ENSURE THE BANKS ARE PROPERLY COMPACTED TO PREVENT FAILURE.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      5. COMPLETE PERMANENT OR TEMPORARY STABILISATION WITHIN 10 DAYS OF CONSTRUCTION.                                                                                                                                 LINDSAY CONSULTING PTY
                                                                                                                                                                                                                                                                                                                                                                                                                         NTS                                                                                                                                                                                                                                                                                              LTD
                                 GRAVEL FILTER
                          SANDBAG OVERLAP               4.0m MIN.
                          ONTO KERB                                                                                                                                                                                                                                                                                                                                                                                                                                                                            DIRECTION OF FLOW
                                                                                                                GEOTEXTILE                STAKES
                                                                                                               FILTER FABRIC                                                                    STAKES
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               TYPICAL GRASS FILTER STRIP DETAIL                                                                                                                       RPEQ 4928
                                                                                                                                                                                                                          DROP INLET                                                                                       1.5m TIMBER STAKES                                                           OVERLA
                                                                                                              RUNOFF WATER                                                                                                WITH GRATE                                                                                                                                                                          ND FLOW     TRAPPED SEDIMENT
                                                                                                              WITH SEDIMENT                                                                                                                                                                                                AT MAX 2.5m CENTRES                                                                                                                                                                                                                                                                                 N.T.S.                                                                  OFF. 2C/82 PARKER STREET, MAROOCHYDORE        PH 54 792 118
                                   1.5m MI




                        RUNOFF
                                                                                                                                                                                                                                                                                                                                                                                                                                  TURF STRIPS                                                                                                       BATTER GRADE
                                                                                                                                                                                                                                                                    DISTURBED                                                                                                                                                                                                                                                                       1:2 max.
            600mm (NOM) GAP
                                                                                                                             0.2m                                                                                                                                   AREA
                                                                                                                                                                                                                                                                                      DIRECTION OF FLOW                                                                                                                                                                                                                                                                                                                                                                                               THIS DRAWING REMAINS THE PROPERTY OF
                                       N.




            BETWEEN SAND BAGS                                                                                                                                     GEOTEXTILE                                                                                                                                                                                                                                                                                                     CHANNEL STABILISATION                                                             UNDISTURBED
                                                                                                                                            FILTERED                                                                                                                                                                                                                                                                                                                             AS REQUIRED
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      LINDSAY CONSULTING PTY LTD AND IS FOR
            ACT AS SPILLWAY                                                                                  BURIED FABRIC                                        FILTER FABRIC                                                                                                                                                                                                                                                                                                                                                                                    AREA
                                                                                                                                             WATER
                THREE LAYERS OF                                                                                                                                                                                                                                                                 SEDIMENT FENCE                                                                                                                                                                                             NOTE:-
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           Min. GRADE 0.25%
                SANDBAGS WITH ENDS
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        THE SOLE USE OF THE CLIENT. NO PART
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           Max. GRADE 0.75%
                OVERLAPPED.
                                                                                                                                    GEOTEXTILE INLET FILTER                                                                                                                                                                                                                                     TURF FLARES TO
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           MUST HAVE A STABILISED OUTLET.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           MAYBE USED AS CONTOUR DRAINS
              DOWN STREAM GULLY PROTECTION DETAILS                                                                                                                                                                           STAKES DRIVEN INTO GROUND                           W                                                                                                              RESTRICT SCOURING

                                             NOT TO SCALE                                                      GEOTEXTILE INLET FILTER CONSTRUCTION NOTES                                                                                        FL
                                                                                                                                                                                                                                                    OW
                                                                                                                                                                                                                                                                              FLO                                                                                                               ALONG TURF EDGE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      MAY BE USED IN PART OR WHOLE WITHOUT
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         PRIOR EXPRESS WRITTEN CONSENT OF
                                                                                                               1. FABRICATE A SEDIMENT BARRIER FROM GEOTEXTILE.                                                           GEOTEXTILE FILTER FABRIC                                                                                                                                                TURF STRIP
                                                                                                               2. FOLLOW DETAIL FOR SEDIMENT FENCE FOR GEOFABRIC                                                                                                                                                                                                                                  BEHIND KERB                                                                                                             CAN BE CONSTRUCTED WITH
                                                                                                                  INSTALLATION. REDUCE PICKET SPACINGS TO 1m CENTRES.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        GRADIENT OF DRAIN OR WITHOUT CHANNEL
                       FLOW
                                                               BURY THE TOP OF THE PLASTIC
                                                               IN TRENCH MIN 300mm DEEP.
                                                               STAPLE AT 150mm CENTRES.
                                                                                                               3. DO NOT COVER THE INLET WITH GEOTEXTILE UNLESS THE
                                                                                                                  DESIGN IS ADEQUATE TO ALLOW FOR ALL WATERS TO
                                                                                                                  BYPASS IT.                                                                                                                                                             FLO
                                                                                                                                                                                                                                                                                            W                    23                24
                                                                                                                                                                                                                                                                                                                                                                                                                                     road surface
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        1% to 5%
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  DIRECTION
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         ALL BATTER GRADES
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         2(H):1(V) MAX.                                                                                                 SURFACE ROUGHENING                                  LINDSAY CONSULTING PTY LTD




                                                                                                                                                                                                                                                                                                                                                25
                                                               COMPACT SOIL OVER BLANKET                                                                                                                                                                                                                                                                                                                                                                                                          OF FLOW




                                                                                                                                                                                                                                                                                                                                                           26
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     CLIENT AND PROJECT DESCRIPTION
                                                                                                                                                                                                                                                                                                           PRO                                       A                                                                                                                                       150 mm min.                                     300 mm min.
                                                                                                                                                                                                                                                                                                              PER
                                                                                                                                                                                                                                                                                                                      TY                                                                                                                                                                                                                                                                                                                                                        SPILLWAY
         CENTRELINE SECTION AT POINTS "A"                                                                                                                                                                                                                                           HOLD IN PLACE
                                                                                                                                                                                                                                                                                    WITH SAND BAGS
                                                                                                                                                                                                                                                                                                                           LINE
                                                                                                                                                                                                                                                                                                                                                SEDIMENT
                                                                                                                                                                                                                                                                                                                                                                90 DEG
                                                                                                                                                                                                                                                                                                                                                                                                          GRASSED     FILTER STRIPS                                                                                   2 metres min.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               150 MM MIN.      150 MM MIN.
                                                                                                                                                                                                                                                                                                                                                 TRAP


                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        GE & LK GRAMS
                                                            FILL TRENCH WITH SOIL
                                                                                                                                                                                               nt                                                                GEOTEXTILE FILTER SOCK                                                              A                                                          NOT TO REGULAR SCALE                                                                     NOTE: ONLY TO BE USED AS TEMPORARY BANK
                                                            AND COMPACT
                                                                                                                                                                                  lig   nme                                                                      FILLED WITH 25MM GRAVEL                                                                                                                                                                                                                 WHERE MAXIMUM UPSLOPE LENGTH IS 80 METRES.
        OVERLAP-BURY UPPER END OF                                                                                                                          15.0                yA
    LOWER BLANKET AS IN "A". OVERLAP                      STAPLES: 8
                                                          GAUGE (4mm)
                                                                                                                                                       M   IN  m
                                                                                                                                                                     Pro
                                                                                                                                                                           pert
                                                                                                                                                                                    Berm (300mm MIN height)                                                                                                                                                                         STORMWATER TREATMENT DETAILS                                                                                      EARTH BUND CUT OFF DRAIN                                                                 AGGREGATE OR RECYCLED CONCRETE.                                   ROCK TRENCHED 200 MM INTO GROUND
     END OF TOP BLANKET 300mm AND                                                                                                                                                                                              KERB INLET PIT SEDIMENT BARRIER
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        PROPOSED SUBDIVISION
                                                          WIRE
                 STAPLE AT 150 CRS.                                                                                      NOM                                                                                                                                                                                                            SEDIMENT
                                                                                                                                                                                                                                                                                                                                                                                    SEDIMENT FLOCCULATION
                                                                                                                         200
                                                                                                                                                                                                                                                                                                                                         TRAP                                                                                                                                                                                                                                                                                                   FLO
                         FLOW                                                                                                                                                                                                                                                                                                                                                       The job of a flocculent is to effectively break down the dominance of the clay particles that contain a residual negative eleCIRCUITro-magnetic charge and thus allowing individual particles                                                                  W
                                                                                                                                                                                                                                                                                                                                  50m                      NOTE: POINTS A AT SAME   to be drawn together and settle under gravity.
                                                                                                      Geotextile fabric,                                                                                                                                                                                                                  MAX              ELEVATION


                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        53-57 RENE ST
                                                                                                      Bidum U34 or similar                                                                                               1.5m TIMBER STAKES
                                                                                                                                                                   3.0
                                                                                                                                                                       m
                                                                                                                                                                                                                         AT MAX 2.5m CENTRES                                                                                                                                        METHOD OF APPLICATION
                                                                                                                                                                     MIN
            CENTRELINE SECTION AT POINTS "B"                                         Unbound pavement material (gravel) to Grading                                                  han
                                                                                                                                                                                          nel
                                                                                                                                                                                                        dwa
                                                                                                                                                                                                              y                                             SELF-SUPPORTING
                                                                                                                                                                                                                                                            GEOTEXTILE                                          SEDIMENT FENCES
                                                                                                                                                                                                                                                                                                                                                                                    Large sediment basins such as the one this site, require that the gypsum is mixed into a slurry with water and then sprayed over the surface of the turbid water in the sediment
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       SPACING OF CHECK DAMS ALONG CENTRELINE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       AND SCOUR PROTECTION BELOW EACH CHECK
                                                                                     B, Table 9 of QT Specification MRS11.05,                                                 &c                    a                                                                                                                                                                               basin.   It is essential that the gypsum is spread evenly over the entire surface for efficient treatment of the turbid water.                                                                                                                                     DAM TO BE SPECIFIED ON SWMP/ESCP
                                                                                                                                                                                               w ro                                                                                                                                                                                                                                                                                                                                                                                                                                   ROCK CHECK DAM
                                                                                     exclude material finer than sieve 2.36mm                                         Kerb                                                                                                                                Sediment Fence installed across the contour
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        NOOSAVILLE
                                                                                                                                                                                           e                                                                                                                                                                                        Generally the gypsum should be applied at a rate of about 32 kgm per 100 cubic metres of detained turbid water, as per the adjacent table. The above dosing rate for the site
                                                                                                                                                                                       rn
                                                    A                                                                                                                  Exis
                                                                                                                                                                             ting
                                                                                                                                                                                  ,o
                                                                                                                                                                                                                  500mm TO 600mm                         DIRECTION OF
                                                                                                                                                                                                                                                         FLOW                                             - uncontoured concentration of flow should be avoided
                                                                                                                                                                                                                                                                                                                                  NOT TO REGULAR SCALE
                                                                                                                                                                                                                                                                                                                                                                                    should be calibrated after the first two storm events to assess the actual flocculent application rate and settling time required for the site.
                                                                                                                                                                                                                                                                                                                                                                                    The final application rate should be sufficiently high to permit adequate sediment sediment flocculation (less than 50 NTU) and basin dewatering within two days (48 hours) from the
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    ROCK CHECK DAM CONSTRUCTION NOTES
                                                                                                                                                                                                                                                                                                                                                                                    conclusion of each storm event, whilst maintaining other required water quality criteria such as pH (6.5 - 8.5) and dissolved oxygen (>80%).
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    1. CHECK DAMS CAN BE BUILT WITH VARIOUS MATERIALS, INCLUDING ROCKS, LOGS, SANDBAGS AND STRAW BALES. THE
                                                                                                              Runoff from pad directed to sediment trap                                                             600mm MIN    ON SOIL, 150mm x 100mm
                                                                                                                                                                                                                                                                                                                                                                                    METHOD OF TESTING THE STORMWATER                                                                                                                                                                   MAINTENANCE PROGRAM SHOULD ENSURE THEIR INTEGRITY IS RETAINED, ESPECIALLY WHERE CONSTRUCTED WITH STRAW
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       BALES. IN THE CASE OF BALES, THIS MIGHT REQUIRE THEIR REPLACEMENT EVERY TWO TO FOUR MONTHS.
                                                                                                                                                                                                                                                                                                                                                                                    The stormwater detained in the sediment basin will be tested at a suitable location that will be decided upon at the site. The sample should be taken at a location that has adequate
                                                                                                                                                                                                                                 TRENCH WITH COMPACTED                                                                                                                              access so no sediment is resuspended while the testing is being conducted.                                                                                                                      2. TRENCH THE CHECK DAM 200 MM INTO THE GROUND ACROSS ITS WHOLE WIDTH. WHERE ROCK IS USED, FILL THE
                                                                                                                                                                                                                                 BACKFILL AND ON ROCK, SET                                                                                                                          The stormwater detained in the sediment basin will be tested with the TPS 90-FLT water quality logger. The TPS 90-FLT unit samples and records the dissolved oxygen, conductivity,                 TRENCHES TO AT LEAST 100 MM ABOVE THE GROUND SURFACE TO REDUCE THE RISK OF UNDERCUTTING.
                                                B                                                        TEMPORARY CONSTRUCTION ENTRY/EXIT SEDIMENT TRAP
                                                                                                         Not to Scale
                                                                                                                                                                                                       SECTION DETAIL INTO SURFACE CONCRETE                                                                                                                                         pH, turbidity and temperature of the stormwater. For further details and specifications on the TPS 90-FLT please refer to Appendix B.
                                                                                                                                                                                                                                                                                                                                                                                    If the TPS 90-FLT unit is not present a practical field test that approximates the required 50 NTU level is to fill a clear plastic or glass 65mm diameter soft drink bottle with the
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    3. NORMALLY, THEIR MAXIMUM HEIGHT SHOULD NOT EXCEED 600 MM ABOVE THE GULLY FLOOR. THE CENTRE SHOULD
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       ACTING AS A SPILLWAY, BEING AT LEAST 150 MM LOWER THAN THE OUTER EDGES.
                                                                                                                                                                                                                                                                                                                                                                                    water and then hold it up to the light. If seeing clearly through the sample is not possible, then the sample is probably above the 50 NTU level.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    4. SPACE THE DAMS SO THE TOE OF THE UPSTREAM DAM IS LEVEL WITH THE SPILLWAY OF THE NEXT DOWNSTREAM
                                                                                                                                                           CATTLE GRID 3.0m NOM WIDTH                                                                                                                                                                                                                                                                                                                                                                                                  DAM.
     STAPLE BLANKETS                                                                                                                                           SET 300mm ABOVE GROUND
          AT GRID OF
         1m CENTRES
                                                                                                                           CONSTRUCTION SITE       5
                                                                                                                                                MIN m
                                                                                                                                                                                                                                                                                                                                                                                    METHOD OF DEWATERING
                                                                                                                                                                                               NT
                                                                                                                                                                                           NME
                                        B                                                                                                                                                                                                                                                                                                                                           The sediment basin can be dewatered as soon as the water quality criteria met (refer table below). A pump is to be used to decant the basin with a floating inlet to prevent the
                                                                                                                                    NOM




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     DRAWING TITLE
                                                                                                                                    200




                                                                                                                                                                                      ALIG
                                                                                                                                                                                                                                                                                                                                                                                    settled sediments from being removed from the basin. The pumping must cease prior to the settled sediments being drawn into the intake pipe, it is essential that materials from
                                                                                                                                                                10                 TY                                                                                                                                                                                               the sediment layer are not discharged in the pumping process.                                                                                                                                                                                                                      STABILISE STOCKPILE
                                                                                                                                                             MIN m             PER       EL                                                                                                              SEDIMENT FENCE CONSTRUCTION NOTES                                                                                                                                                                                                                                                                                         AX.)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       SURFACE
                                                                                                                                                                           PRO HANN                                                                                                                  ;                                                                                                                                                                                                                                                                                           EARTH BANK                                            2:1
                                   B                                                                                                                                                                                                                                                                 1. CONSTRUCTION SEDIMENT FENCES AS CLOSE AS                                                                                                                                                                                                                                                                               E (M
                                         FLOW




                                                                                                                                                                                  C         Y                                                                                                                                                                                                                                                                                                                                                                                                                              P                                 SLO
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       SLO
                                                                                                                                                                                        DWA
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        EROSION AND SEDIMENT
                                                                                                  GEOFABRIC FABRIC, BIDIM A34                                                   &                 KERB INLET PIT SEDIMENT BARRIER                                                                    POSSIBLE TO BEING PARALLEL TO THE CONTOURS OF THE                                                                                                                                                                                                                               FLOW                                                                       PE
                                                                                                                                            300




                                                              STAPLE OUTSIDE EDGES                OR SIMILAR                                                               ERB      ROA                                                                                                              SITE, BUT WITH SMALL RETURNS. THE CATCHMENT AREA                                STORMWATER DISCHARGE QUALITY CRITERIA                                                                                                                                                                                       2:1                                                 (MA
                                                              AT 300mm CRS.                                                                                  3MmIN K NEW                          CONSTRUCTION NOTES                                                                                 SHOULD BE       SMALL ENOUGH TO LIMIT WATER FLOW IF
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        X.)
                                                                                                                                                                           OR                     1. FABRICATE A SLEEVE FROM GEOTEXTILE OR WIRE MESH

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        CONTROLS
                                                                                                                                                                                                                                                                                                     CONCENTRATED AT ONE POINT.
                                                                                                                                                                        G,                           LONGER THAN THE LENGTH OF THE INLET PIT AND FILL
                                                                                                                                                                                                                                                                                                                                                                                       ACCEPTABLE       TSS         ACCEPTABLE       PH         DISSOLVED    O2
                                                                                                  RUNOFF TO BE DIRECTED TO A SEDIMENT TRAP,
                                                                                                                                                             E  X ISTIN                              WITH 25mm TO 50mm GRAVEL.
                                                                                                                                                                                                                                                                                                     2. CUT A 150-mm DEEP TRENCH ALONG THE UPSLOPE
                                                                                                                                                                                                                                                                                                     LINE OF THE FENCE FOR THE BOTTOM OF THE FABRIC TO
                                                                                                  REFER STANDARD DRAWING D-0041.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       SEDIMENT FENCE
                       CLEAN/DIRTY DIVERSION DRAINS                                                                                                                                               2. FORM AN ELLIPTICAL CROSS-SECIRCUITION APPROX. 150mm                                             BE ENTRENCHED.
                                                                                                                                                                                                                                                                                                     3. DRIVE TIMBER STAKES INTO GROUND AT 2.5m
                                                                                                                                                                                                                                                                                                                                                                                       50mg/L                           6.5 - 8.5                   > 80%
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           TOPSOIL STOCKPILE
                                                                                                                                                                                                     HIGH, 400mm WIDE.
                                                                                                                  TEMPORARY ENTRY/EXIT                                                            3. PLACE THE FILTER AT OPENING LEAVING AT LEAST                                                    INTERVALS (MAX) AT THE DOWNSLOPE EDGE OF THE TRENCH.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      TOPSOIL STOCKPILE CONSTRUCTION NOTES
                                                                                                                                                                                                     100mm BETWEEN KERB INLET AND SLEEVE. MAINTAIN                                                   4. FIX SELF-SUPPORTING GEOTEXTILE TO THE UPSLOPE
DIVERSION DRAIN CONSTRUCTION NOTES                                                                                                                                                                   OPENING WITH SPACER BLOCKS.                                                                     SIDE OF THE POSTS ENSURING IT GOES TO THE BASE OF                               SEDIMENT BASIN FLOCCULENT APPLICATION                                                                                                                                                            1. PLACE STOCKPILES MORE THAN 2 (PREFERABLY 5) METRES FROM EXISTING VEGETATION, CONCENTRATED
                                                                                                                                                                                                  4. FORM A SEAL WITH KERB TO PREVENT SEDIMENT                                                       THE TRENCH. FIX THE GEOTEXTILE WITH WIRE RECOMMENDED                                                                                                                                                                                                                                WATER FLOW, ROADS AND HAZARD AREAS.
1. REMOVE ANY ROCKS, CLODS, STICKS OR GRASS FROM THE SURFACE BEFORE LAYING PLASTIC.
                                                                                                  TEMPORARY ENTRY/EXIT CONSTRUCTION NOTES                                                                                                                                                             BY THE MANUFACTURER. THE USE OF SHADE CLOTH FOR
                                                                                                                                                                                                     BYPASS.                                                                                                                                                                                                                                                                                                                                                                          2. CONSTRUCTION ON THE CONTOUR AS LOW, FLAT, ELONGATED MOUNDS.
2. ENSURE THAT TOPSOIL IS AT LEAST 75mm DEEP.                                                                                                                                                     5. SANDBAGS FILLED WITH GRAVEL CAN SUBSTITUTE FOR                                                   THIS PURPOSE IS NOT SATISFACTORY.                                              AGENT          INDICATIVE      DOSAGE          COMMENTS                               PRECAUTIONS        &   CONSTRAINTS           MIN.   REQD.    ON   SITE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      3. WHERE THERE IS SUFFICIENT AREA, TOPSOIL STOCKPILES SHALL BE LESS THAN 2 METRES IN HEIGHT.
                                                                                                  1. STRIP THE TOPSOIL, LEVEL THE SITE AND COMPACT THE SUBGRADE.                                                                                                                                     5. JOIN SECTIONS OF THE FABRIC AT A SUPPORT POST
3. ENSURE PLASTIC WILL BE CONTINUOUSLY IN CONTACT WITH THE SOIL BY GRADING THE SURFACE            2. COVER THE AREA WITH NEEDLE-PUNCHED GEOTEXTILE.                                                  THE MESH OR GEOTEXTILE PROVIDED THEY ARE PLACED                                                                                                                                                                                                                                                                                                                                  4. WHERE THEY ARE TO BE IN PLACE FOR MORE THAN 10 DAYS, STABILISE FOLLOWING THE APPROVED
   CAREFULLY FIRST.                                                                                                                                                                                  SO THAT THEY FIRMLY ABUT EACH OTHER AND                                                         WITH A 150mm OVERLAP.                                                            GYPSUM        32kg/100cub.m                   LITTLE PH CHANGE, SLIGHT INCREASE IN   NEEDS TO BE SPREAD EVENLY ACROSS POND.      260 kgm                                                           ESCP OR SWMP TO REDUCE THE C-FACIRCUITOR TO LESS THAN 0.10.
                                                                                                  3. CONSTRUCTION A 200mm THICK PAD OVER THE GEOTEXTILE USING ROAD BASE OR 30mm.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     SCALES
4. LAY FABRIC IN "SHINGLE FASHION", WITH THE END OF EACH UPSTREAM ROLL OVERLAPPING THOSE                                                                                                                                                                                                             6. BACKFILL THE TRENCH OVER THE BASE OF THE FABRIC                                                                             SALINITY                               CAN CAUSE SCUM DEPOSITS IN EQUIPMENT.                                                                      5. CONSTRUCTION EARTH BANKS (STANDARD DRAWING 5-5) ON THE UPSLOPE SIDE TO DIVERT WATER AROUND
                                                                                                  4. ENSURE THE STRUCTURE IS AT LEAST 15m LONG OR TO BUILDING ALIGNMENT AND AT                       SEDIMENT LADEN WATERS CANNOT PASS BETWEEN.                                                       AND COMPACT IT THOROUGHLY OVER THE GEOTEXTILE.
   DOWNSTREAM. ENSURE EACH ROLL IS ANCHORED PROPERLY AT ITS UPSLOPE END.                             LEAST 3m WIDE.                                                                                                                                                                                                                                                                                                                                                                                                                                                                      STOCKPILES AND SEDIMENT FENCES (STANDARD DRAWING 6-8) 1 TO 2 METRES DOWNSLOPE.
5. ENSURE FULL WIDTH OF FLOW CHANNEL IS COVERED BY THE PLASTIC.                                                                                                                                                                                                                                                                                                                      NOTE: NOTIFY ENGINEER TO CONFIRM DOSAGES & APPLICATION PRIOR TO USE.
                                                                                                  5. WHERE SEDIMENT FENCE JOINS ONTO THE STABILISED ACCESS, CONSTRUCTION A HUMP OR
                                                                                                     GRATE IN THE STABILISED ACCESS TO DIVERT WATER TO THE SEDIMENT FENCE.




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     SURVEY DATUM

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       .

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     ASSOCIATED CONSULTANTS




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     REVISION LIST
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     A ORIGINAL ISSUE                                     11/02/22




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    Computer File
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      031159CP.DWG
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    DRAWING NUMBER                                     SHEET   REV.

                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       03-1159-C3        3 A
Log in to download the original file

031159OW(A).pdf · 2.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.