Original source · versioned page text
CHANGE - fully signed Deed_Agreement_-_Blue_CHP_Myall_Rise_2026.02.27
Docusign Envelope ID: 886D61F4-0E2F-4EF2-8560-413163297E81 Housing Project (idearchitecture, Issue A, March 2023) « Appliances Schedule (idearchitecture, Issue A, 19 November 2024) ¢ Interior Finishes Schedule (idearchitecture, Issue B, 19 November 2024) « Exterior Finishes Schedule (idearchitecture, Issue A, 19 November 2024) « Glass Accessories Schedule (idearchitecture, Issue A, 19 November 2024) * Joinery Hardware and Finishes Schedule (idearchitecture, Issue B, 19 November 2024) « Sanitaryware Schedule (idearchitecture, Issue B, 19 November 2024) « Sanitaryware Accessories Schedule (idearchitecture, Issue B, 19 November 2024) contract Valuation If required, the Vendor will provide a valuation for the A valuation is required to support the Vendor's pricing. The RFP following: requires the Purchaser to provide the Project's completed *° ‘ABletend market value, including on a dwelling-by-dwelling basis. « Aslf Complete « Market Rental Assessment. Variations No variations to plans, designs or fixtures and fittings without | The Purchaser is required to meet strict design guidelines with the Purchaser's consent other than minor variations or as both State and Commonwealth funding bodies. The market 5% required by law. variance for a standard residential sales transaction for a single For the avoidance of doubt, no reduction in square metres TG SE ADRES NORCENT (m2) beyond 2.5% of original plans (both overall and on individual dwelling basis) without the Purchaser's approval (at its absolute discretion). Building Contract | Assignment of builder warranties and rights under building This is a requirement of the Purchaser and its financiers.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.