                                                                                                                                                 GENERAL:
                                                                                                                                                 1.    TO BE READ IN CONJUNCTION WITH 'SEDIMENT CONTROL DEVICES', REFER STD DRG IPWEA DS-040 &
                                                                                                                                                       DS-041.
                                                                                                                                                  2.   TEMPORARY DRAINAGE CONTROL FLOW SHOULD BE DIVERTED AROUND THE WORK SITE WHERE                                                                                                                                                                                                                             FORMED TOP WIDTH
                                                                                                                                                       POSSIBLE.                                                                                                                                                                                                                                                                                           GEOTEXTILE LINED OR EQUIVALENT
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       FORMED TOP WIDTH GEOTEXTILE
                                                                                                                                                  3.   ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE INSTALLED AND BE OPERATIONAL BEFORE




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 0.15 (MIN)
                                                                                                                                                                                                                                                                                                                                                                                                                                   RUNOFF                                                                                                                                                                                                                  LINED OR EQUIVALENT
                                                                                                                                                       COMMENCING UP-SLOPE EARTHWORKS.                                                                                                                                                                                                                                                                                                                                                                                            RUNOFF




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     0.15 (MIN)
                                                                                                                                                  4.   CONTROL MEASURES TO BE INSPECTED AT LEAST WEEKLY AND AFTER SIGNIFICANT RUNOFF
                                                                                                                                                       PRODUCING STORMS.
                                                                                                                                                  5.   IN AREAS WHERE RUNOFF TURBIDITY IS TO BE CONTROLLED, EXPOSED SURFACES TO BE EITHER                                                                                                                                                                                                                                                                                  2 (min)
                                                                                                                                                       MULCHED, COVERED WITH EROSION CONTROL BLANKETS OR TURFED IF EARTHWORKS ARE
                                                                                                                                                       EXPECTED TO BE DELAYED FOR MORE THAN I4 DAYS.                                                                                               FILTER SOCKS OVERLAP                                                                                                                                                                                                               1
                                                                                                                                                  6.   CONTROL MEASURES MAY BE REMOVED WHEN ON-SITE EROSION IS CONTROLLED AND 70%                                                                  ONTO KERB                          4.0m MIN
                                                                                                                                                       PERMANENT SOIL COVERAGE IS OBTAINED OVER ALL UPSTREAM DISTURBED LAND.
                                                                                                                                                  7.   STRAW BALE SEDIMENT TRAPS ARE TO BE SECONDARY OPTION WHICH GENERALLY SHOULD NOT BE
                                                                                                                                                                                                                                                                                                     SEDIMENT POND
                                                                                                                                                       USED IF OTHER OPTIONS ARE AVAILABLE.
                                                                                                                                                  3.   ALL CAPTURED RUNOFF MUST BE TREATED TO <75NTU PRIOR TO DISCHARGE.
                                                                                                                                                                                                                                                                                                               RUN-OFF                                                                                                                              NON-DISPERSIVE SUBSOIL
                                                                                                                                                  4.   SITE TO BE PROGRESSIVELY STABILISED, AIMING FOR 60% STABILISATION WITHIN 20 DAYS FROM
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                NON-DISPERSIVE SUBSOIL
                                                                                                                                                       START OF WORKS AND 70% OR GREATER WITHIN 2 MONTHS.
                                                                                                                                                  5.   ALL INLET PITS TO BE PROTECTED IMMEDIATELY.                                                                                                                                                                       1m MAX ON                                                                                                                                                                                                                    (c) PARABOLIC CATCH DRAIN WITHOUT BANK
                                                                                                                                                                                                                                                                                                                                BYPASS FLOW                             PUBLIC ROADS                                                        (a) PARABOLIC CATCH DRAIN WITH DOWN-SLOPE BANK
                                                                                                                                                  6.   EROSION AND SEDIMENT CONTROL MEASURES TO BE PROGRESSIVELY REMOVED AS SITE
                                                                                                                                                       STABILISATION IS ACHIEVED.
                                                                                                                                                                                                                                                                                                                  (a) ON-GRADE KERB INLET SEDIMENT TRAP                                                                                               FORMED TOP WIDTH GEOTEXTILE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  CONSTRUCTED DIMENSIONS OF PARABOLIC CATCH DRAINS
                                                                                                                                                  SEDIMENT CONTROL:                                                                                                                                                                                                        FILTER SOCKS MAY NEED TO                                                       LINED OR EQUIVALENT
                                                                                                                                                 1.    ALL SEDIMENT & EROSION CONTROL MEASURES TO BE IN ACCORDANCE WITH INTERNATIONAL                                                                                                                                      FULLY SURROUND THE INLET TO                                                                                                                                                                                 DRAIN TYPE FORMED TOP WIDTH WITH OR WITHOUT




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   0.15 (MIN)
                                                                                                                                                       EROSION CONTROL ASSOCIATION (IECA) AUSTRALIA GUIDELINES AND THE SPECIFICATIONS. THE                                                                                                                                 INTERCEPT SEDIMENT RUNOFF                               RUNOFF                                                                                                                                                BANK FORMED DEPTH WITH OR WITHOUT BANK
                                                                                                                                                                                                                                                                                                      PVC PIPE SPACERS
                                                                                                                                                       BASIC PRINCIPLES ARE TO:                                                                                                                                                                                            FROM THE ROAD AND VERGE                                                                                                                                                                                    TYPE - A               1.6m                                   0.3m
                                                                                                                                                        ·   MINIMISE THE AREA OF DISTURBANCE;
                                                                                                                                                        ·   CONTROL DRAINAGE PATHS UPSTREAM OF SITE AND AT OUTLETS FROM SITE;                                                                                                                                                                                                                                                                                               2 (MIN)                                                   TYPE - B               2.4m                                   0.45m

                                                                                                                                                        ·   MINIMISE EROSION;                                                                                                                                                                                                                                                                                                                                                      1                                                  TYPE - C               3.6m                                   0.65m
                                                                                                                                                        ·   MINIMISE SEDIMENTATION;
                                                                                                                                                        ·   PROGRESSIVELY REVEGETATE AND REHABILITATE THE SITE                                                                                                  FILTER SOCK
                                                                                                                                                  2.   SEDIMENT & EROSION CONTROL DETAILS SHOWN ARE MINIMUM REQUIREMENTS. IT IS THE                                                                                                                                                                                                                                                                                                                                                    CONSTRUCTED DIMENSIONS OF TRIANGULAR V-DRAINS
                                                                                                                                                                                                                                                                                                                                                                                   SIDE INLET REMAINS OPEN
                                                                                                                                                       CONTRACTOR'S RESPONSIBILITY TO INSTALL ADDITIONAL CONTROL MEASURES AS DEEMED                                                           GULLY GRATE WRAPPED IN NON-WOVEN FILTER                                                                                                                                                                                                                                                   DRAIN TYPE FORMED TOP WIDTH WITH OR WITHOUT
                                                                                                                                                       NECESSARY THROUGHOUT CONSTRUCTION.                                                                                                     FABRIC (MINIMUM, BIDIM A34 OR EQUIVALENT)                                                                                                                                                                                                                                                   BANK FORMED DEPTH WITH OR WITHOUT BANK
                                                                                                                                                  3.   THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN ALL SEDIMENT CONTROL DEVICES IN A FUNCTIONAL
                                                                                                                                                                                                                                                                                                                                                                                                                                                             NON-DISPERSIVE SUBSOIL
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      TYPE - AV              2.0m                                   0.3m
                                                                                                                                                       ORDER AND REPLACE ALL BLOCKED SEDIMENT DEVICES AS REQUIRED UNTIL SUCCESSFUL OFF                                                                                     (b) SAG INLET SEDIMENT TRAP
                                                                                                                                                       MAINTENANCE OF WORKS.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      TYPE - BV              2.7m                                   0.45m
                                                                                                                                                  4.   CONSTRUCTION OF ALL SEDIMENT MANAGEMENT DEVICES TO THE SATISFACTION OF THE
                                                                                                                                                       SUPERINTENDENT. SHALL BE COMPLETED AND EFFECTIVE PRIOR TO:
                                                                                                                                                                                                                                                                                                                     KERB INLET PROTECTION                                                                                                           (b) TRIANGULAR V-DRAIN WITH DOWN-SLOPE BANK
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      TYPE - CV              3.9m                                   0.65m
                                                                                                                                                        a. STRIPPING OF TOPSOIL AND GRASS.
                                                                                                                                                                                                                                                                                                                                        SCALE N.T.S.                                                                                                                                                                      LINED CATCH DRAIN
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       SCALE N.T.S.
                                                                                                                                                        b. BULK EARTHWORKS TO THE SITE.
                                                                                                                                                        c. SERVICES INSTALLATION.
                                                                                                                                                        d. PAVEMENT CONSTRUCTION.
                                                                                                                                                  6.   ALL SEDIMENT MANAGEMENT MEASURES ARE TO REMAIN IN PLACE UNTIL INSTRUCTION IS RECEIVED
                                                                                                                                                       IN WRITING FROM THE SUPERINTENDENT TO REMOVE ALL OR PART OF THE SILT CONTROL                                                                          SEDIMENT COLLECTION PIT EXCAVATED AROUND INLET
                                                                                                                                                       APPLICATIONS.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  2m (MIN)
                                                                                                                                                  7.   BOTH TEMPORARY AND PERMANENT SEDIMENT MANAGEMENT/EROSION CONTROL DEVICES SHALL BE                                                                                                                                                                                                                                                                                                                        FLOW CONTROL BERM INCORPORATED INTO THE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          MINIM                                                 ROCK PAD IF THE PAD RECEIVES RUNOFF FROM
                                                                                                                                                       MAINTAINED AT A SUITABLE LEVEL/CONDITION THROUGHOUT CONSTRUCTION TO THE SATISFACTION                                                                                                                                                                                                                                                                           UM LE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            NGTH
                                                                                                                                                       OF THE SUPERINTENDENT. SEDIMENT FENCES ARE TO BE CLEANED OUT WHEN CAPACITY IS REDUCED                                                                                                                                                                                                                                                                                       10m (M                       THE BUILDING SITE (LOCATION MAY VARY)
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         IN)
                                                                                                                                                       BY 30%.
                                                                                                                                                                                                                                                                                                                                                                                                                                                   40-75mm CRUSHED ROCK                                                   300mm (MIN)
                                                                                                                                                  8.   THE BULK EARTHWORKS AND SEDIMENT CONTROL LAYOUT PLAN SHALL BE READ IN CONJUNCTION                                                                                                                                                                                                                                                                                                                                                                      BUILDING                                           LAND




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         10m (MIN)
                                                                                                                                                       WITH THE APPROVED DRAWINGS.                                                                                                                                                                                                                                                                                                                                                                                                                              SITE                                             SLOPE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  150-200mm                                        N
                                                                                                                                                  9.   PRIOR TO COMMENCEMENT OF CONSTRUCTION APPROVAL IS TO BE OBTAINED FROM THE                                                                                                                                                                                                                                                                                                              MI                                                  KERB
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          m
                                                                                                                                                       SUPERINTENDENT FOR THE LOCATION OF THE SITE ACCESS POINT AND WASH DOWN AREA WHICH                                                                                                                                                                                                                                                                                               2.0
                                                                                                                                                       ARE TO BE MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD.                                                                                                                                                                                                                                                                                                                                               Y
                                                                                                                                                                                                                                                                                                                                                                                                                                                             UP-SLOPE RUNOFF                                                                                BD FOOTPATH
                                                                                                                                                 10. IF EROSION AND SEDIMENT CONTROL DEVICES HAVE BEEN FOUND TO BE DIFFERENT OR FAILED IN                                                                                                                                                                                                                     DIRECTED TO AN                                                                           RP
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                MAKE SAFE FOR
                                                                                                                                                     SERVICE, CORRECTIVE ACTION IS TO BE UNDERTAKEN IMMEDIATELY WHICH MAY INCLUDE                                                                                                                                                                                                                              APPROPRIATE                                                                                                      ROADWAY                       FOOTPATH
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                MAK                                                                                                                                                             PEDESTRIAN TRAFFIC
                                                                                                                                                     AMENDMENTS' ADDITIONS TO THE ORIGINAL APPROVED EROSION CONTROL PLANS. SUCH                                                                                                                                                                                                                               SEDIMENT TRAP                  PEDE E SAFE TO
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 STRIA
                                                                                                                                                     AMENDMENTS ARE TO BE APPROVED BY SUPERINTENDENT, IF DEEMED NECESSARY AND RELEVANT.                                                                                                                                                                                                                                                                N TRA
                                                                                                                                                                                                                                                                                                                                                                                                                                                          GEOTEXTILE FILTER CLOTH (MANDATORY                FFIC
                                                                                                                                                 11. SEDIMENT TRAP TO BE FLOCCULATED AND DE-SILTED AS NECESSARY.                                                                                                                                                                                                                                          WHEN WORKING ON CLAYEY SOILS)                                                                                                                                                           ROADWAY
                                                                                                                                                 12. WATER QUALITY TESTING / MONITORING TO BE UNDERTAKEN BY CONTRACTOR.
                                                                                                                                                                                                                                                                                                             (a) FABRIC WRAP DROP INLET PROTECTION WITH TRENCH
                                                                                                                                                  SEDIMENT FENCE:                                                                                                                                                                                                                                                                                                                                 (a) ROCK ENTRY/EXIT PAD FOR BUILDING SITES
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    (b) ROCK PAD SLOPING AWAY FROM ROAD
                                                                                                                                                                                                                                                                                                                                                                                                                                              CONSTRUCTION NOTES:
                                                                                                                                                 1.    NOT TO BE LOCATED IN AREAS OF CONCENTRATED FLOW.
                                                                                                                                                                                                                                                                                                                                                                                                                                              MATERIALS
                                                                                                                                                  2.   NORMALLY LOCATED ALONG THE CONTOUR WITH A MAXIMUM CATCHMENT AREA 0.6Ha PER 100m                                                                                                                                                                                                                                                                                                                                                                                                            2m (MIN)
                                                                                                                                                                                                                                                                                                                                                                                      GRATE WRAPPED IN NON-WOVEN FILTER                       ROCK: WELL GRADED, HARD, ANGULAR, EROSION RESISTANT ROCK, NOMINAL DIAMETER OF 40 TO 75mm.
                                                                                                                                                       LENGTH OF FENCE
                                                                                                                                                                                                                                                                                                                                                                                      CLOTH (WOVEN SEDIMENT FENCE ONLY                        FOOTPATH STABILISING AGGREGATE: 25 TO 50mm GRAVEL OR AGGREGATE (IF REQUIRED).
                                                                                                                                                  3.   WOVEN FABRICS ARE PREFERRED, NON-WOVEN FABRICS MAY BE USED ON SMALL WORK SITES, I.E.                                                                          SEDIMENT COLLECTION PIT
                                                                                                                                                                                                                                                                                                                                                                                      USED IN HEAVY TRAFFIC AREAS)                                                                                                                                                                                            BUILDING
                                                                                                                                                       OPERATIONAL PERIOD LESS THAN 6 MONTHS OR ON SITES WHERE SIGNIFICANT SEDIMENT RUNOFF IS                                                                        EXCAVATED AROUND INLET                                                                                                   GEOTEXTILE FABRIC: HEAVY-DUTY, NEEDLE-PUNCHED, NON-WOVEN FILTER CLOTH (‘BIDIM’ A24 OR EQUIVALENT).
                                                                                                                                                       NOT EXPECTED                                                                                                                                                                                                                                                                                                                                                                                                                                             SITE
                                                                                                                                                                                                                                                                                                                                                                                                                                              INSTALLATION
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 LAND
                                                                                                                                                  4.   WHERE FENCES NEED TO BE LOCATED ACROSS THE CONTOUR THE LAYOUT SHALL CONFORM TO                                                                                                                                                                                                         1.    INSPECT ALL SITE ENTRY AND EXIT POINTS PRIOR TO FORECAST RAIN, DAILY DURING EXTENDED PERIODS OF RAINFALL, AFTER                                                                                              SLOPE




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         10m (MIN)
                                                                                                                                                       'TYPICAL LAYOUT' ACROSS GRADE.                                                                                                                                                                                                                                                         RUNOFF-PRODUCING RAINFALL, OR OTHERWISE AT FORTNIGHTLY INTERVALS.
                                                                                                                                                  5.   FENCES ARE REQUIRED 2m MIN. FROM TOE OF CUT OR FILL BATTERS, WHERE NOT PRACTICAL ONE                                                                                                                                                                                                   2.    IF SAND, SOIL, SEDIMENT OR MUD IS TRACKED OR WASHED ONTO THE ADJACENT SEALED ROADWAY, THEN SUCH MUST BE PHYSICALLY
                                                                                                                                                       FENCE CAN BE AT THE TOE WITH A SECOND FENCE 1m MIN AWAY. FENCE SHOULD NOT BE LOCATED                                                                                                                                                                                                                                                                                                                                                                                                                  SEDIMENT FENCE
                                                                                                                                                                                                                                                                                                                                                                                                                                              REMOVED, FIRST USING A SQUARE-EDGED SHOVEL, AND THEN A STIFF-BRISTLED BROOM, AND THEN BY A MECHANICAL VACUUM UNIT, IF
                                                                                                                                                       PARALLEL WITH TOE IF CONCENTRATION OF FLOW WILL OCCUR BEHIND THE FENCE
                                                                                                                                                                                                                                                                                                                                             STORMWATER INLET                                                                                 AVAILABLE.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                MAKE SAFE FOR
                                                                                                                                                  TEMPORARY CONSTRUCTION ENTRY / EXIT:                                                                                                                                                       GRATE                                                                                            3.    IF NECESSARY FOR SAFETY REASONS, THE ROADWAY SHALL ONLY BE WASHED CLEAN AFTER ALL REASONABLE EFFORTS HAVE BEEN                                           FOOTPATH
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                PEDESTRIAN TRAFFIC
                                                                                                                                                 1.    ADJACENT STORMWATER RUNOFF TO BE DIVERTED AWAY FROM ENTRY/EXIT.                                                                                                                                                                                                                        TAKEN TO SHOVEL AND SWEEP THE MATERIAL FROM THE ROADWAY.

                                                                                                                                                  2.   WHEEL-WASH OR SPRAY UNIT MAY BE REQUIRED DURING WET WEATHER.                                                                                                                                                                                                                           4.    WHEN THE VOIDS BETWEEN THE ROCK BECOMES FILLED WITH MATERIAL AND THE EFFECTIVENESS OF THE ROCK PAD IS REDUCED TO A
Filename: C:\ARCOSGROUP\2023 PROJECTS - DOCUMENTS\230703 - URB RES - 2 JAN STREET, NOOSA HEADS\3.0 CAD\DRAWINGS\OPW\230703-OPW-C-231.DWG




                                                                                                                                                                                                                                                                                                                                                                                                                                              POINT WHERE SEDIMENT IS BEING TRACKED OFF THE SITE, A NEW 100mm LAYER OF ROCK MUST BE ADDED AND/OR THE ROCK PAD MUST BE                                                                             ROADWAY
                                                                                                                                                  STANDARD SPECIFICATIONS:
                                                                                                                                                                                                                                                                                                                                                                                                                                              EXTENDED.
                                                                                                                                                  DRAWING TO BE READ IN CONJUNCTION WITH INTERNATIONAL EROSION CONTROL ASSOCIATION (IECA)                                                                                                                                                                                                     5.    ENSURE ANY ASSOCIATED DRAINAGE CONTROL MEASURES (e.g. FLOW CONTROL BERM) ARE MAINTAINED IN ACCORDANCE WITH THEIR
                                                                                                                                                  AUSTRALASIA BEST PRACTICES STANDARD DRAWINGS & SPECIFICATIONS. IECA STANDARD DRAWINGS                                                                         (b) TYPICAL DETAILS OF EXCAVATED SEDIMENT COLLECTION TRENCH
                                                                                                                                                  GENERALLY AS LISTED BELOW BUT NOT LIMITED TO:
                                                                                                                                                                                                                                                                                                                                                                                                                                              DESIRED OPERATIONAL CONDITION.                                                                                                                                   (c) ROCK PAD SLOPING TOWARD THE ROAD
                                                                                                                                                                                                                                                                                                                                                                                                                                              6.    DISPOSE OF SEDIMENT AND DEBRIS IN A MANNER THAT WILL NOT CREATE AN EROSION OR POLLUTION HAZARD.
                                                                                                                                                        EXIT-01 - CONSTRUCTION EXIT - ROCK PAD
                                                                                                                                                        EXIT-02 - CONSTRUCTION EXIT - ROCK PAD
                                                                                                                                                                                                                                                                     OPTIONAL GEOTEXTILE SPLASH PAD PLACED
                                                                                                                                                                                                                                                                     BELOW DAM TO REDUCE EROSION AT THE BASE
                                                                                                                                                                                                                                                                                                                          FIELD INLET PROTECTION
                                                                                                                                                        EXIT-03 - ROCK PADS FOR BUILDING SITES
                                                                                                                                                                                                                                                                1    OF THE CHECK DAM (GENERALLY NOT REQUIRED)                                         SCALE N.T.S.                                                                                                                                                   ROCK PADS FOR BUILDING SITES
                                                                                                                                                        CD-01 - CATCH DRAINS                                                                                                                                                                                                                                                                                                                                                                                  SCALE N.T.S.
                                                                                                                                                        CD-02 - CATCH DRAINS - EARTH LINED
                                                                                                                                                        RCD-01 - CHECK DAMS                                                                                                                                                                                                                                                                                                      STABILISE STOCKPILE SURFACE
                                                                                                                                                        FF-01 - FILTER FENCE                                                                                    1
                                                                                                                                                        SF-01 - SEDIMENT FENCE
                                                                                                                                                        SF-02 - SEDIMENT FENCE
                                                                                                                                                        ESC-02 - GRATED STORMWATER (FIELD) INLET SEDIMENT TRAP                                        150mm (MIN)
                                                                                                                                                                                                                                                                                                                                                                    EARTH BANK FOR UPSTREAM




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                1.5 MAX
                                                                                                                                                        ESC-03 - KERB INLET SEDIMENT TRAPS                                                 A                    A
                                                                                                                                                                                                                                                                            OUTER WING POINTS A TO BE AT                                                            APPROACH FLOWS
Last saved by: HARRYDAVIES(2023-12-18) Last Plotted: 2023-12-18




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                             SEDIMENT
                                                                                                                                                                                                                                                    B




                                                                                                                                                        R-01 - RENEGOTIATION - GENERAL                                                                                      LEAST 150mm ABOVE CREST B                                                                                                                                                                                         1                                                                                                                                                              FENCE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            1
                                                                                                                                                                                                                                                                                                                                             FLOW DIRECTION                                                                                                                  2
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       GROUND LEVEL               2
                                                                                                                                                                                                                                                   SECTION 1-1
                                                                                                                                                                                                                                               FIGURE 1 - LAYOUT PROFILE OF CHECK DAMS
                                                                                                                                                                                                                                                        (ROCK CHECK DAMS SHOWN)



                                                                                                                                                                                                                                                ROCK CHECK DAMS                                                                                                                                                                                                                                   TYPICAL STOCKPILE DETAIL
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                              SCALE N.T.S.
                                                                                                                                                                                                                                                           SCALE N.T.S.



                                                                                                                                                                                                            North Point   Scale                                     Horiz. Datum     Client                                     Consultant                                                                                     Project                                                                                                       Drawing
                                                                                                                                                                                                                                                                      LOCAL                                                                                                                                                                                                                              Drawn                HD                                                                                                     Project No.                   Drawing No.           Rev No.
                                                                                                                                                                                                                                                                                              GREG & KERI VENTER                                                                                                                             DUAL OCCUPANCY                                                                                                 EROSION & SEDIMENT CONTROL
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         Design               HD
                                                                                                                                                                                                                                                                                               (IZAROX PTY LTD)                                                                                                                          OPERATIONAL WORKS - CIVIL                                                                                           NOTES & STANDARD DETAILS
                                                                                                                                                                                                                                                                    Vert. Datum
                                                                                                                                                                                                                                                                       AHD
                                                                                                                                                                                                                                                                                                                                                                                                                                               2 JAN STREET                                              Check              GM
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      230703                     OPW-C-231                A
                                                                                                                                                                                                                                                                     RL Datum                                                                                                     CIVIL | STRUCTURAL | GEOTECHNICAL
                                                                                                                                                                                                                                                                                                                                                                                                                                          NOOSA HEADS, QLD, 4567                                         Approved                                      Approved Date         Signed                                                                                              Sheet
                                                                                                                                            A FOR APPROVAL
                                                                                                                                           Rev          Revision Description
                                                                                                                                                                                          18.12.23 LS
                                                                                                                                                                                            Date Approved
                                                                                                                                                                                                                                                                                                                                COPYRIGHT © All rights reserved.
                                                                                                                                                                                                                                                                                                                                This work is copyright and cannot be reproduced
                                                                                                                                                                                                                                                                                                                                or copied in any form without the prior consent
                                                                                                                                                                                                                                                                                                                                                                                  SUNSHINE COAST | BRISBANE | GOLD COAST
                                                                                                                                                                                                                                                                                                                                                                                  www.arcosgroup.com.au | ABN 51 640 311 842
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         LACHLAN SWANN
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         RPEQ     21223
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       18.12.23                                                             Status                FOR APPROVAL
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 Size     A1

Used in these records

About this file

File size
4.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Apdx 3 - Civil Eng Plans.pdf · 4.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.