Original source · versioned page text
39 Lorilet 04 Reconfiguring a Lot Code
Performance Outcomes Acceptable Outcomes
(l) protects and enhances ecologically important
areas and provides for the clustering of lots into
cleared areas.
Infrastructure Complies
PO10 No acceptable outcome provided
All services are available to the site without
Development accommodates and provides for the
additional infrastructure. No charges required.
efficient and timely delivery of infrastructure
appropriate to the site’s setting and intended use.
PO11 Not applicable for this application.
Roadway and pathway layout are predominantly No acceptable outcome provided
rectilinear with a high degree of permeability.
Editor’s Note— Further detail on traffic and the road
network is addressed in Part 9.4.8 Transport Code
Infrastructure and services Table 9.5.1.3 Criteria for assessable development (part)
Performance Outcomes Acceptable Outcomes
Growth management
Infrastructure and services
PO12 AO12.1 Complies
New lots are located, sized and configured so as to All lots are connected to power supply and All services are unaffected.
ensure each lot is capable of being serviced by telecommunications services and where located
appropriate levels of infrastructure including: within the Urban boundaries, power supply and
communications infrastructure are provided
underground.
(a) power supply;
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.