Council archive · source document
Development Assessment Report · OPW16/0016
Attached to the e-mail OPW16/0016 - Operational Works Application.
Project Urban – 15253 February 2016 7.0 CONCLUSION This Development Assessment Report has been prepared on behalf of Quadrant Holdings Pty Ltd to support a Development Application for Operational Work for Prescribed Tidal Works (Deck) in respect of land at 2 Parkyn Court Tewantin, legally described as Lot 388 MCH839039, Lot 400 MCH839039 & Lot 178 MCH5169. Under the Noosa Plan 2006 the site is included within the open space recreation zone of the Tewantin and Doonan locality. This report has demonstrated that the establishment of the proposed development on the subject site is warranted. The assessment of the proposed development against the relevant sections of the Noosa Plan 2006 and the relevant State level requirements indicates that the use demonstrates general compliance with all relevant provisions. Grounds for approval are included as follows: The proposed works are consistent with existing use rights and will provide improved facilities for existing onsite marina uses which will contribute to the variety of passive and active recreational experiences on offer in the locality, promoting community interaction, wellbeing and a desirable lifestyle for local residents in accordance with the intent of the open space and recreation zone. The proposed works are wholly contained within the existing use/lease area and are consistent with existing use rights and provisions of the state government lease and previous Council approvals. The proposed development has demonstrated compliance with the applicable sections of the SPP. The proposed development has demonstrated compliance with the application sections of the SDAP. The attached Planning Scheme Code Assessment has demonstrated that the proposed development complies with all relevant probable solutions and specific outcomes of the Watercourse Works Code contained in the Noosa Plan 2006. The attached Prescribed Tidal Work Code Assessment has determined that the proposed development complies with all relevant probable solutions and specific outcomes of the Prescribed Tidal Works Code contained in the Coastal Protection and Management Regulation 2003. The site area to accommodate the proposed works is unconstrained by planning scheme overlays. Based on the above, it is considered that the proposed development warrants approval from Council subject to the imposition of reasonable and relevant conditions. Development Assessment Report Page 14 of 14 Operational Works for Prescribed Tidal Works 2 Parkyn Court, Tewantin
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Assessment Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.