                                                    following—
                                                      i)    a distributed live load of
                                                            5.0kPa;

                                                     ii)    a concentrated live load
                                                            of 4.5kN;

                                                     iii)   the load of the largest
                                                            vehicle capable of being
                                                            on the boardwalk or
                                                            deck;

                                             (b)    subject to paragraph (c), a
                                                    boardwalk or independent deck
                                                    not accessible to vehicular traffic
                                                    is able to support at least the
                                                    following—
                                                      i)    a distributed live load of
                                                            5.0kPa;

                                                     ii)    a concentrated live load
                                                            of 4.5kN;

                                             (c)    if a relevant planning scheme
                                                    standard is more stringent than
                                                    the standard mentioned in
                                                    paragraph (a) or (b)—the
                                                    relevant     planning     scheme
                                                    standard, to the extent it is
                                                    more     stringent    than    the
                                                    standard       mentioned        in
                                                    paragraph (a) or (b).
15.3 Prescribed tidal work that is a        The design and construction of the            Complies – The proposed deck does
boardwalk or an independent deck does       boardwalk or deck is consistent with the      not unreasonably restrict remedial works
not prevent or hinder remedial work         following standards—                          to the banks of the Noosa River.
being undertaken on any bank of tidal
water or for any existing retaining wall,    (a)    subject to paragraph (b), a
revetment or seawall or another existing            boardwalk or independent deck
structure.                                          either—
                                                      i)    can be easily dismantled
                                                            and reassembled; or

                                                     ii)    does not restrict the
                                                            movement of machinery
                                                            ordinarily    used    for
                                                            remedial work to any
                                                            bank of tidal water or
                                                            any existing retaining
                                                            wall,     revetment    or
                                                            seawall or other existing
                                                            structure;

                                             (b)     if a relevant planning scheme
                                                     standard is more stringent than
                                                     the standard mentioned in
                                                     paragraph (a)—the relevant
                                                     planning scheme standard, to
                                                     the extent it is more stringent
                                                     than the standard mentioned in
                                                     paragraph (a).
Design, construction and safety—jetties and piers
Not Applicable - works not for a jetty or pier
Design, construction and safety—pipelines and other underground services
Not Applicable - works not for a pipeline or other underground service
Design, construction and safety—pontoons
Not Applicable - works not for a Pontoon
Design, construction and safety—retaining walls, revetments and seawalls
Not applicable – works not for retaining walls, revetments or seawalls
Design, construction and safety—wharves
Not applicable – works not for a wharf

Used in these records

About this file

File size
1.6 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Assessment Report.pdf · 1.6 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.