Development Assessment Report · OPW16/0016
Attached to the e-mail OPW16/0016 - Operational Works Application.
Performance outcomes Acceptable outcomes Response Comment
reasonably short timeframe (for
example, 12 hours).
AND
AO2.3 Development within a coastal The deck is proposed to be established at
hazard area is located, designed and 2.2m AHD which is 1.65m above the
constructed to ensure exposed Highest Astronomical Tide (H.A.T). The
structures can sustain flooding from establishment of the deck at this level will
a defined storm tide event. ensure the proposed works will achieve
AND adequate immunity from storm tide
inundation. The proposed deck has been
designed by an RPEQ who specializes in
Marina type developments to ensure the
proposal is adequately designed to
reasonably withstand possible impacts
from Coastal Hazards.
AO2.4 Essential community service N/A The proposal is not for essential
infrastructure is: community services.
(1) located so that it is not
inundated by a recommended
storm tide event specified for
that infrastructure, or
(2) located and designed to ensure
any components of the
infrastructure that are likely to
fail to function or may result in
contamination when inundated
by a storm tide (for example,
electrical switch gear and
motors, water supply pipeline
air valves) are:
(a) located above the peak
water level for a
recommended storm tide
event, or
(b) designed and
constructed to exclude
storm tide intrusions or
infiltration (including by
being located in the
ground), or
(c) able to temporarily stop
functioning during a
recommended storm tide
event without causing
significant adverse impacts
to the infrastructure or the
community.
AND
AO2.5 Emergency services N/A The proposal does not involve any of the
infrastructure and emergency services or facilities mentioned by AO2.5.
shelters, police facilities, and
hospitals and associated facilities
have an emergency rescue area
above the peak water level for a
recommended storm tide event.
PO3 Development directly, AO3.1 Development avoids N/A The proposed deck will form part of the
indirectly and cumulatively avoids increasing the number of premises existing Noosa Marina premises.
an unacceptable increase in the from which people would need to be
severity of the coastal hazard, and evacuated to prevent death or injury
does not significantly increase the from a defined storm tide event.
potential for damage on the
premises or to other premises.
PO4 Development avoids the AO4.1 Development that involves N/A The proposed deck will not be used to
release of hazardous materials as a the manufacture or storage of manufacture or store hazardous
result of a natural hazard event. hazardous materials in bulk are materials.
Editor’s note: Applications should: designed to:
(1) prevent the intrusion of waters
State development assessment provisions Module 10 — Coastal protection 10.1
Tidal works, or development in the coastal management district state code
23 November 2015 V1.7
Page 2 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Assessment Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.