Council archive · source document
07/2238 - MCU - Service amd Utility Tpye 3 - Tower [As Published] · 132007.2238
_ DALY MCU for Noosa South, Lot 15 on $P177649 INTERNATIONAL These operational factors all influence the size of the search area within which a suitable site has to be identified. Geographical Constraints - The geographical form of the surrounding landscape also plays a large part in determining network design. Many of the rural landscapes comprise of undulating landscapes including, trees and other features that obstruct radio frequency (RF) coverage. The number of required sites and pattern of the network design will also have to account for the particular rural landscape. 2.3 PROCESS OF SITE SELECTION Planning for a new mobile telecommunications base station is a complex process, which in this case involved the following activities: . Telstra uses a number of methods to identify those parts in the 3G network that require improved coverage, capacity and call performance. These methods include drive surveys, statistical measures, Computer modelling of coverage, and the evaluation of customer complaints. When an area within the Telstra network is identified as providing poor services and performance, investigations are undertaken to determine the measures required to rectify theses services and performance deficiencies. In this case Telstra has identified the rural and nearby residential areas around Willow Vale, as requiring 3G mobile coverage, where there is presently poor to nil coverage. e Telstra radio frequency engineers assessed this deficiency and devised measures necessary for rectification. The first stage of the process was to consider if the deficiency can be improved through the optimisation of the existing network hardware to avoid the deployment of additional infrastructure. However if optimisation can not deliver a satisfactory outcome, the deployment of a new site is considered. The initial research undertaken is used to define the scope of the network deficiency and the performance objective of the proposed new facility. In this instance, the radio frequency engineer determined that a new site (telecommunication tower) is required. e Telstra identified an area where a telecommunications facility would be most required (a "search ring") and undertakes a preliminary investigation with the relevant planning/environmental and property consultants, RF engineers and designer of this search ring to identify possible locations or options for the facility. Whilst the operational and geographical aspects of deploying new mobile base stations are primary factors, there are many other critical issues that have to be effectively resolved in parallel that also influence network design. Some of the issues which need to be considered are visual amenity, co-location, the availability and suitability of land and a willing site provider, occupational health and safety, construction issues - structural and loading feasibility, access for 31/10/07 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2238 - MCU - Service amd Utility Tpye 3 - Tower [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.