Council archive · source document
07/2238 - MCU - Service amd Utility Tpye 3 - Tower [As Published] · 132007.2238
os DALY MCU for Noosa South, Lot 15 on SP177649 INTERNATIONAL The Code of Practice sets out the obligations on telecommunications carriers when undertaking activities such as inspecting land, installing facilities and maintaining facilities. In particular, Clause 3.13 of the Code directs felecommunications carriers to take all reasonable steps to ascertain whether any existing facility of another telecommunication carrier or a ‘Public Utility’ is available for co-location, when proposing fo install a new facility. Also, section 2.11 of the Telecommunications Code of Practice 1997 sets out the design, planning and installation requirements for the carriers to ensure the installation of facilities is in accordance with industry 'best practice’. This is required to: . minimise the potential degradation of the environment and the visual amenity associated with the facilities.” [Section 2.11(3)] Best practice also involves the carrier complying with any relevant industry code or standard that is registered by the Australian Communications and Media Authority (ACMA) under Part 6 of the Act. Comment: The siting and design of the proposal has taken place in accordance with Section 3 (Planning and Siting) of the Australian Standard, Siting of Radiocommunications Facilities (AS 3516.2). In accordance with the requirements of the Code of Practice, Daly International in conjunction with Telstra, assessed the viability of the co-location of other existing telecommunication facilities in the search area during the site selection process. However, no existing telecommunication facilities are located in the search area that will provide the required radio frequency objectives. This proposal therefore, fully complies with the Code of Practice. 43 THE TELECOMMUNICATIONS (LOW-IMPACT FACILITIES) DETERMINATION 1997 The Telecommunications (Low-impact Facilities) Determination 1997 (‘the Determination’) identifies both the type of facilities that can be “Low-impact", and the areas in which these facilities can be installed. The Determination specifies when a telecommunication carrier can enter land and install a low- impact telecommunication facility without seeking approval under State and Territory laws. The Determination also ensures that such installations are subject to the processes for negotiation and dispute resolution set out in the Telecommunications Code of Practice 1997. Where a facility is not defined as "low-impact", it is subject to State and Territory planning laws and regulations. Comments: In this instance, the current proposal is not defined as a low-impact facility and therefore it is subject to State laws and the provisions of the Noosa Plan 2006. This is because the proposed Telstra facility does not comply with Part 3 —- Low impact Facilities of the Determination. 31/10/07 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2238 - MCU - Service amd Utility Tpye 3 - Tower [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.