Skip to the record
Accept no imitations.

Council archive · source document

Appendix C- Civil Engineering Report · MCU23/0135

of 75

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 10, section 1. The text section number identifies this passage in the reader.

 29 September 2023



9          ROADWORKS
The development site will utilise the existing circulation road to the south of the new retail along
with new crossovers to the circulation roads to the north of the new retail. The basement
carparking will have an adequately sized driveway to ensure traffic is managed within the
development site.

No external roadworks are proposed as part of the new retail development.

Existing car parking areas will be reconfigured to accommodate the new retail development.

The proposed internal on-grade car parking and loading / services area layouts are depicted on the
architectural plans prepared by Buchan Group attached in Appendix 1.

All service bays and car parks will be constructed in accordance with the relevant Noosa Shire
Council and Australian Standards.


10         EARTHWORKS
A preliminary levels plan showing the proposed site levels for the basement car park landscape
areas is depicted on MPN Plan 9954- DA01-DA02 attached in Appendix 2.

All earthworks will be contained within the boundary of the site and not impact on the surrounding
internal circulation roads.

The design and construction of earthworks and basement shoring will be in accordance with the
recommendations of a geotechnical report along with AS 3798 – Guidelines on Earthworks for
Commercial and Residential Developments.

Any excavated material not suitable for fill will be removed from the site and disposed of
appropriately in an approved landfill.

As the development will involve excavation of subsoil below RL 5.0m, the development is subject to
the State Planning Policy July 2017 requirements for acid sulfate soils and an acid sulfate soil
investigation and creation of the management plan will be undertaken as part of the detail design
phase. All requirements of the management plan will be implement during works, as all excavated
soils will be subject to the requirements of the management plan.


11         ELECTRICITY AND TELECOMMUNICATIONS
The proposed development will be serviced for electricity and telecommunications services from
the existing underground services in the retail centre. The electrical and telecommunications
services will be extended into new retail to provide the required level of service. All works will be
undertaken in accordance with the relevant authority’s requirements.

The existing Energex, Telstra and NBN infrastructure in the vicinity of the site is shown on the
Energex, Telstra and NBN DBYD Plans attached in Appendix 3.




 Excellence with Economy in Engineering                                                                 9
 https://mpncnetau.sharepoint.com/sites/administration/shared      documents/9000-9999/9900-
 9999/9954/report/29-09-23 civil engineering report_issue a.docx

Used in these records

About this file

File size
16.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix C- Civil Engineering Report.pdf · 16.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.