Skip to the record
For the highest quality transcripts.

Council archive · source document

Appendix C- Civil Engineering Report · MCU23/0135

of 75

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 12, section 1. The text section number identifies this passage in the reader.

 29 September 2023



14         CONCLUSION
This Civil Engineering Report demonstrates that under the proposed plans, the development will
be adequately serviced for sewer and water from the existing and proposed connections to the
infrastructure mains. Electricity and telecommunications will be provided to the lots with
connections undertaken in accordance with the requirements of the relevant authorities.

The proposed retail development will reuse the existing water connection which services the
existing retail development. Any upgrades to the connections will be determined in combination
with the hydraulic consultant and Unity Water at the detail design stage.

A new sewer property connection will be constructed to the existing sewer main to the south of the
new retail site. This new property connection will service the proposed development.

Access to the site will be from the existing internal road network for the site. All internal car park
adjustments completed on site, will be undertaken in accordance with the relevant Noosa Shire
Council and Australian Standards.

All earthworks undertaken on site will be compliant with all relevant Australian Standards to
minimise environmental impacts. An acid sulfate soils assessment will be undertaken as part of the
detail design process with any ASS encountered onsite to be managed in accordance with a
management plan.



15         LIMITATONS OF REPORT
MPN have prepared this report for the proposed Stage 2 retail development at Eenie Creek Road
Noosaville in accordance with MPN’s proposal to Stockwell. This report is provided for the
exclusive use of Stockwell for this specific project and its requirements. It should not be used or
relied upon by a third party and MPN accept no responsibility for the use of this report by any party
other than Stockwell.




 Excellence with Economy in Engineering                                                                  11
 https://mpncnetau.sharepoint.com/sites/administration/shared      documents/9000-9999/9900-
 9999/9954/report/29-09-23 civil engineering report_issue a.docx

Used in these records

About this file

File size
16.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix C- Civil Engineering Report.pdf · 16.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.