Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

Appendix C- Civil Engineering Report · MCU23/0135

of 75

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (16.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 54, section 1. The text section number identifies this passage in the reader.

ACID SULFATE SOILS OVERLAY CODE
Performance Criteria and Acceptable Solution
Noosa Civic Stage 2 Retail Development
29 September 2023

               PERFORMANCE OUTCOMES                                                 ACCEPTABLE OUTCOMES                                                      RESPONSE

Section A—If accepted development subject to compliance with identified requirements (acceptable outcomes only) or assessable development where for filling or excavation

PO1                                                                AO1.1                                                               RO1

Development:                                                      The disturbance of ASS is avoided by:                                 An Acid Sulfate Soils Assessment and Management Plan
                                                                                                                                   will be completed as part of the detail design process and
   1.   does not disturb ASS; or                                       1.   undertaking an ASS investigation and soil analysis
                                                                                                                                   submitted with the operational works documentation.
   2.   is managed to avoid or minimise the release of acid                 according to the National Acid Sulfate Soils Guidance;
        and metal contaminants, where disturbance of ASS is            2.   not excavating or otherwise removing soil or sediment
        unavoidable.                                                        containing ASS;
                                                                       3.   not permanently or temporarily extracting
                                                                            groundwater that results in the aeration of previously
                                                                            saturated ASS; and
                                                                       4.   not undertaking filling on land at or below 5 metres
                                                                            AHD that results in:-
                                                                            1. actual ASS being moved below the water table;
                                                                                 or
                                                                            2. previously saturated ASS being aerated.

                                                                  Editor's note—National Sampling and Identification Methods
                                                                  Guidelines is a reference to:

                                                                       1.   National Acid Sulfate Soils Guidance: National acid
                                                                             sulfate soils sampling and identification methods
                                                                             manual, Department of Agriculture and Water
                                                                             Resources, Canberra (Sullivan et al, 2018); and
                                                                       2.   National Acid Sulfate Soils Guidance: National Acid
                                                                             Sulfate Soils Identification and Laboratory Methods
                                                                             Manual, Department of Agriculture and Water
                                                                             Resources, Canberra; and
                                                                       3.   the Australian Standard 4969.

                                                                  OR



                                                                  AO1.2

https://mpncnetau.sharepoint.com/sites/administration/shared documents/9000-9999/9900-9999/9954/codes/29-09-23 acid sulfate soils overlay code.docx
                                                                                                Page 1

Used in these records

About this file

File size
16.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix C- Civil Engineering Report.pdf · 16.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.