WATER QUALITY & DRAINAGE CODE
Performance Criteria and Acceptable Solution
Noosa Civic Stage 2 Retail Development
29 September 2023
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES RESPONSE
PO13 AO13.1 Development will comply. Refer Stormwater Management
Development is designed and constructed to maintain The location and form of stormwater discharge points do not Plan for further information.
surface and ground water balances that sustain the alter the pre-development hydrology of receiving surface
environmental values of water dependent ecosystems, water or groundwater.
including downstream aquatic, riparian, wetland and
terrestrial ecosystems. AO13.2
Developments located on groundwater recharge or
discharge areas are designed and managed in accordance
with a groundwater recharge and discharge management
plan prepared by a suitably experienced and qualified
groundwater hydrologist. The groundwater recharge or
discharge must demonstrate that the development does not
affect groundwater balances beyond the property
boundaries.
Editor's Note— PSP6 Engineering Design Standards -
Roads, drainage and earthworks provides guidance on
prepare a groundwater recharge and discharge plan.
Construction and establishment of stormwater management systems
PO14 AO14.1 Information on the erosion and sediment control measures
Construction methods provide for appropriate controls to An erosion and sediment control plan prepared in has been provided within the Stormwater Management Plan.
avoid entry and transport of litter, sediment, and associated accordance with the International Erosion Control
prescribed water contaminants into receiving waters. Association Best Practice Books demonstrates that the
capture and release of stormwater achieves the design
Editor's note— Water contaminants are prescribed in the objectives listed in Table A: Construction phase –
Environmental Protection Act 1994. stormwater management design objectives of the State
Planning Policy (Appendix 2).
Editor’s note— PSP6 Engineering Design Standards -
Roads, drainage and earthworks provides guidance on
requirements for preparing an Erosion Management Plan.
AO14.2
https://mpncnetau.sharepoint.com/sites/administration/shared documents/9000-9999/9900-9999/9954/codes/29-09-23 water quality & drainage code.docx
Page 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix C- Civil Engineering Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 16.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.