Original source · versioned page text
Minor Change Request Pomona Subdivision
Changes to Conditions As a result of the proposed changes, the following conditions require changing: Condition 1 – Change to reflect the Updated Site Plan and Earthworks Plans Condition 6 – Update Plan Numbers Condition 8 – Update Engineering Plan Condition 11 – Update Engineering Plan If you have any further queries in relation to the above, please do not hesitate to contact myself. Regards, Jack Lewis B.Sc Hons UNSW M.Plan Otago RPIA Planner/Director Pivotal Perspective Pty Ltd 0406 334 227
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.