Skip to the record
Accept no substitutions.

Council archive · source document

Rabtuvi Pty Ltd - IDAS Forms · OPW13/0451

of 14

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

IDAS form 1—Application details

(Sustainable Planning Act 2009 version 2.0 effective 17 December 2012)

This form must be used for ALL development applications.

You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this

form.

For all development applications, you must:

¢ complete this form (/DAS form 1—Application details)
¢ complete any other forms relevant to your application
¢ provide any mandatory supporting information identified on the forms as being required to accompany your

application.

Attach extra pages if there is insufficient space on this form.

All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning

Regulation 2009.

This form and any other IDAS form relevant to your application must be used for development applications relating to
strategic port land and Brisbane core port land under the Transport Infrastructure Act 1994 and airport land under the
Airport Assets (Restructuring and Disposal) Act 2008. Whenever a planning scheme is mentioned, take it to mean land
use plan for the strategic port land, Brisbane core port land or airport land.

PLEASE NOTE: This form is not required to accompany requests for compliance assessment.

 

This form can also be completed online using eDA at www.smarteda.qid.gov.au

 

 

Mandatory requirements

 

 

 

Applicant details (Note: the applicant is the person responsible for making the application and need not be the owner
of the land. The applicant is responsible for ensuring the information provided on all DAS application forms is correct.
Any development permit or preliminary approval that may be issued as a consequence of this application will be issued

to the applicant.)

 

Names (individual or company name in full)
For companies, contact name

Postal address

Contact phone number

Mobile number (non-mandatory requirement)

 

RABTUV) PTY CTA

 

 

JeuUN StEYMaV®

 

 

INWUS TREAT

 

 

 

 

g- 2 €
Suburb CA LOUNDLA
State Ru Postcode YsS }

 

 

 

Country (if other than Australia)

 

 

 

oO) Suqu Sqtse

 

 

 

 

 
Full text of the other 13 pages

Page 2

 

Fax number (non-mandatory requirement) o'7 549 2 6699

 

 

e-mail address (non-mandatory requirement) Steve
@THESETIY SPE CiAUST. Cam. AN

 

 

 

Applicant’s reference number (non-mandatory
requirement)

 

 

 

1. What is the nature of the development proposed and what type of approval is being sought?

 

 

Table A—Aspect 1 of the application (If there are additional aspects to the application please list in Table B—Aspect 2.)

 

a) Whatis the nature of the development? (Please only tick one box.)
CO Material change of use C Reconfiguring a lot ial Building work [7 operational work

b) What is the approval type? (Please only tick one box.)

CO Preliminary approval oO Preliminary approval [Development
under s241 of SPA under s241 and s242 permit
of SPA

c) Provide a brief description of the proposal, including use definition and number of buildings or structures where
applicable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.)

 

 

 

PONTOON $y s7TeM

 

d) Whatis the level of assessment? (Please only tick one box.)

7
CT] Impact assessment Code assessment

 

 

Table B—Aspect 2 of the application (If there are additional aspects to the application please list in Table C—Additional
aspects of the application.)

 

 

a) Whatis the nature of development? (Please only tick one box.)
Cc] Material change of use oO Reconfiguring a lot oO Building work O Operational work

b) What is the approval type? (Please only tick one box.)

CT] Preliminary approval O Preliminary approval C] Development
under s241 of SPA under s241 and s242 permit
of SPA

c) Provide a brief description of the proposal, including use definition and number of buildings or structures where
applicable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.)

 

 

 

 

d) Whatis the level of assessment?

CL Impact assessment CT Code assessment

 

 

Page 3

 

Table C—Additional aspects of the application (If there are additional aspects to the application please list ina
separate table on an extra page and attach to this form.)

 

oO Refer attached schedule CT Not required

 

 

2. Is the application for a mobile and temporary environmentally relevant activity (ERA)?

 

me No—continue to question 3

Cc Yes—complete Table D and then go to question 6

 

Table D—name of each local government area in which the mobile and temporary ERA is proposed to operate

 

 

 

3. Location of the premises (Complete Table E and/or Table F as applicable. Identify each lot ina separate row.)

 

 

Table E—street address and lot on plan for the premises or street address and lot on plan for the land adjoining or
adjacent to the premises. (Note: this table is to be used for applications involving taking or interfering with water).
(Attach a separate schedule if there is insufficient space in this table.)

 

(1 Street address and lot on plan (All lots must be listed.)

Street address and lot on plan for the land adjoining or adjacent to the premises (Appropriate for
development in water but adjoining or adjacent to land, e.g. jetty, pontoon. All lots must be listed)

 

 

 

 

 

Street address Lot on plan Local government area
description (e.g. Logan, Caims)
Lot Unit Street Street name and official Post- Lot no. Plan type
no. no. suburb/ locality name code and plan no.
i) &4 WYyYUNA pa HSER | 34 Ic NIOS7S |SuNSH INE COAT
ii) NOoS AVILA
iii)

 

 

 

 

 

 

 

Planning scheme details (If the premises involves multiple zones, clearly identify the relevant zone/s for each lot in a
separate row in the below table. Non-mandatory.)

 

Lot Applicable zone / precinct Applicable local plan / precinct Applicable overlay/s

 

 

 

 

 

 

 

 

 

 

3 IDAS form 1—Application details
Version 2.0 17 December 2012

 

 

Page 4

 

Table F—premises coordinates (Appropriate for development in remote areas, over part of a lot or in water not
adjoining or adjacent to land e.g. channel dredging in Moreton Bay.) (Attach a separate schedule if there is insufficient
space in this table.)

 

 

 

 

 

 

 

 

 

 

 

 

 

Coordinates Zone Datum Local government
(Note: place each set of coordinates in a separate row.) reference area (if applicable)
Easting Northing Latitude Longitude

L] cpag4

L] wese4

Cc] other
4. Total area of the premises on which the development is Proposed (indicate square metres)
Cem

 

5. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm etc.)

 

 

PESIBENTAL

 

 

6. Are there any current approvals (e.g. a preliminary approval) associated with this application? (Non-
mandatory requirement.)

 

/
No [] Yes—provide details below

 

List of approval reference/s Date approved (dd/mm/yy) Date approval lapses (dd/mm/yy)

 

 

 

 

 

 

 

7. ls owner’s consent required for this application? (Refer to notes at the end of this form for more information.)

[] No
7

NM Yes—complete either Table G, Table H or Table | as applicable

 

 

Table G

 

Name of owner/s of the land

 

We, the above-mentioned owner/s of the land, consent to the making of this application.

 

Signature of owner/s of the land

 

Date

 

 

Table H

 

Name of owner/s of the land

 

 

O The owner's written consent is attached or will be provided separately to the assessment manager

 

 

Table |

 

Name of owner/s of the land -

 

 

 

 

 

4 IDAS form 1—Application details
Version 2.0 17 December 2012

Page 5

 

CO By making this application, |, the applicant, declare that the owner has given written consent to the making of the
application.

 

 

8. Does the application involve a State resource? (E.g. the application involves taking water or quarry maierial, or
interfering with the flow of water. Refer to the notes at the end of this form for more information) (Non-mandatory
requirement.)

 

 

[Z] No [_] Not identified whether or [_] Yes—complete Table J
not the application
involves a State
resource

 

Table J

Nature of State-owned resource (if identified)

 

 

 

 

 

9. Identify if any of the following apply to the premises (Tick applicable box/es.)
a

 

Adjacent to a water body, watercourse or aquifer (e.g. creek, river, lake, canal)—complete Table K
CO On strategic port land under the Transport Infrastructure Act 1 994—complete Table L
my In a tidal water area—complete Table M
[_] OnBrisbane core port land under the Transport Infrastructure Act 1994 (no table requires completion)

CT On airport land under the Airport Assets (Restructuring and Disposal) Act 2008 (no table requires completion)

 

Table K

 

Name of water body, watercourse or aquifer

WENBA CREEK

 

 

 

 

 

 

 

 

 

Table L

Lot on plan description for strategic port land Port authority for the lot

Table M

Name of local government for the tidal area (if applicable) Port authority for the tidal area (if applicable)
SUNSHING Const LEG oNMAL COW

 

 

 

10. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water
etc.)

 

W No CT Yes—ensure the type, location and dimension of each easement is included in the plans submitted

 

 

 

11. Does the proposal include new building work or operational work on the Premises? (Including any services.)

 

O No RY Yes—ensure the nature, location and dimension of proposed works are included in plans submitted

 

5 IDAS form 1—Application details
Version 2.0 17 December 2012

 

 

Page 6

 

12. Is the payment of a portable long service leave levy applicable to this application? (Refer to notes at the end
of this form for more information.)

 

/
No—go to question 14 L] Yes

 

 

13. Has the portable long service leave levy been paid? (Refer to notes at the end of this form for more
information.)

 

 

[] No

Yes—complete Table N and submit with this application the yellow local government/private certifier’s copy of the
receipted QLeave form

 

Table N

 

Amount paid Date paid QLeave project number (6 digit number starting with A, B, E, L or P)
(dd/mm/yy)

 

 

 

 

 

 

14. Has the local government agreed to apply a superseded planning scheme to this application under section
96 of the Sustainable Planning Act 2009?

 

 

HY No

[_] Yes—please provide details below

 

Name of local government Date of written notice given | Reference number of written notice given
by local government by local government (if applicable)
(dd/mm/yy)

 

 

 

 

 

15. List below all of the forms and supporting information that accompany this application (Include all IDAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this
question does not apply for applications made online using Smart eDA.)

 

 

 

 

 

 

 

Description of attachment or title of attachment Method of lodgement to
assessment manager
IDM Faaenn 23 MAILE
CONSTRUCTION PLANS # ENGINEERS CEETIF Ie TR MALL
Ceer OF TITLE = =4 Gonuranw Exeter Mai
MSQ CON CUeZENCE Camm ets MAIL
OWNELS CONSENT Lom tH.

 

 

 

16. Applicant's declaration

 

 

 

™M By making this application, | declare that all information in this application is true and correct (Note: it is unlawful to
provide false or misleading information.)

 

 

 

6 IDAS form 1—Application details
Version 2.0 17 December 2012

Page 7

Notes for completing this form

e Section 261 of the Sustainable Planning Act 2009 prescribes when an application is a properly made application.
Note, the assessment manager has discretion to accept an application as properly made despite any non-
compliance with the requirement to provide mandatory supporting information under section 260(1)(c) of the
Sustainable Planning Act 2009.

Question 7

e Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required for
an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is
required under section 263, then an application must contain, or be accompanied by, the written consent of the
owner, or include a declaration by the applicant that the owner has given written consent to the making of the
application.

e Owner's consent is not required for a mobile and temporary ERA.

Question 8

e fadevelopment application involves a State resource, the application is not required to be supported by evidence
of resource entitlement. The allocation or entitlement to the resource is a separate process and should be obtained
prior to development commencing.

Question 12

e The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable long
service leave levy is payable.

e The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.

Question 13

e The portable long service leave levy need not be paid when the application is made, but the Building and
Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
permit is issued.

e Building and construction industry notification and payment forms are available from any Queensland post office or
agency, on request from QLeave, or can be completed on the QLeave website at www.gleave.qid.gov.au. For
further information contact QLeave on 1800 803 481 or visit www.qleave.qld.gov.au.

Privacy—The information collected in this form will be used by the Department of State Development, Infrastructure
and Planning (DSDIP), assessment manager, referral agency and/or building certifier in accordance with the
Processing and assessment of your application. Your personal details will not be disclosed for a purpose outside of the
IDAS process, except where required by legislation (including the Right to Information Act 2009) or as required by
Parliament. This information may be stored in relevant databases. The information collected will be retained as
required by the Public Records Act 2002.

 

OFFICE USE ONLY
Date received Reference numbers

 

 

 

 

 

 

 

NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER

To Council. | have been engaged as the private certifier for the
building work referred to in this application

 

 

 

 

 

BSA Certification license Building

Date of engagement |Name number classification/s

 

 

 

 

 

QLEAVE NOTIFICATION AND PAYMENT (For completion by assessment manager or private certifier if
applicable.) =

Description of the work QLeave project Amount paid Date paid | Date receipted |Name of officer who

 

 

 

 

 

 

 

 

 

 

7 IDAS form 1—Application details
Version 2.0 17 December 2012

Page 8

 

number ($) form sighted by |sighted the form
assessment
manager

 

 

 

 

 

 

 

 

The Sustainable Planning Act 2009 is administered by the Department of State Development, Infrastructure and
Planning. This form and all other required application materials should be sent to your assessment manager and any
referral agencies.

 

8 IDAS form 1—Application details
Version 2.0 17 December 2012

 

Page 9

IDAS form 23—Tidal works and development within
coastal management districts

(Sustainable Planning Act 2009 version 2.0 effective 17 December 2012)

This form must be used for development applications for:

© — operational work that is tidal works (including prescribed tidal works) or operational work within a coastal
management district (under the Sustainable Planning Regulation 2009, schedule 7, table 2, item 13)

* — material change of use (under the Sustainable Planning Regulation 2009, schedule 7, table 3, item 5) that
requires referral because it involves:

- operational work carried out completely or partly in a coastal management district

- _ building work carried out completely or partly in a coastal management district that is the construction of a new
premises with a gross floor area (GFA) of at least 1000m? or the enlargement of the GFA of an existing
premises by more than 1000m*

¢ — reconfiguring a lot that requires referral because the land is situated completely or partly in a coastal management
district or the reconfiguration is in connection with the construction of a canal (under the Sustainable Planning
Regulation 2009, schedule 7, table 2, item 14)

e building work that requires referral because it is on land completely or partly seaward of a coastal building line
(under the Sustainable Planning Regulation 2009, schedule 7, table 1, item 11).

You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this
form.

Notes for completing this form

For all development applications you must:

* complete /DAS form 1—Application details

e complete any other forms relevant to your application

e provide any mandatory supporting information identified on the forms as being required to accompany your
application.

Attach extra pages if there is insufficient space on this form.

All terms used on this form have the meaning given in the Coastal Management and Protection Act 1995, the Coastal
Protection and Management Regulation 2003, the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.

For guidance on determining if an application triggers assessment by the Department of Environment and Heritage
Protection (EHP) for coastal management purposes refer to IDAS Guide 23 — tidal works and development within
coastal management districts.

 

This form can also be completed online using eDA at www.smarteda.qid.gov.au

 

 

 

Mandatory requirements

 

 

 

1 IDAS form 23—Tidal work and coastal management districts
Version 2.0 17 December 2012

Page 10

 

 

1. What is the nature of the work or development proposed by the application? (Tick applicable box/es.)

 

 

yw Operational work - complete table A LC Material Change of Use - complete table B
CT Reconfiguring a Lot-complete table C | Building Work - complete table D

 

Table A — Operational Work

 

 

Does the operational work involve the following? (Tick applicable box/es.)

a) Tidal works as defined under the Coastal Protection and Management Act 1995 (e.g. basins, breakwater, bridges,
boat ramps, decks and boardwalks, docks, dockyards, groynes, jetties, marinas, pipelines, pontoons, powerlines,
seawalls, slips, training walls, wharves and reclaimed land)? (Tick applicable box/es)

] No [yes

If yes, what is the purpose?
FonpoanN

Private purpose (e.g. private pontoon)

 

 

 

 

O Another purpose (e.g. commercial marina)

Does the tidal works also require resource allocation under the Coastal Protection and Management Act 1995?
L

No C1 Yes

If applicable what is the estimated value of the proposed works?

 

 

 

 

b) Interfering with quarry material as defined under the Coastal Protection and Management Act 1995 (e.g. excavating
or moving sand, gravel or any other earth material on State land such as roads, esplanades, parks or unallocated
state land) on state coastal land above high-water mark.

[no ~=>- Yes
If yes, which of the following?

CT Works for coastal management purpose involving beach nourishment, dune fencing, revegetation of dunal areas
with endemic native plants, or stinger net enclosures.

CO For purpose directly related to the provision of lifesaving or rescue services by a volunteer community
organisation.

Oo For other purposes (please state below).

 

 

If applicable what is the estimated value of the proposed works?

 

 

 

 

c) Disposing of dredge spoil or other solid waste material in tidal water?
/
No oO Yes

If applicable what is the estimatéd value of the proposed works?

 

 

 

 

d) Constructing an artificial waterway?

 

 

 

2 IDAS form 23—Tidal work and coastal management districts
Version 2.0 17 December 2012

Page 11

 

[No L] Yes

If applicable what is the length of the waterway?

 

 

 

 

e) Removing or interfering with coastal dunes on land, other than State coastal land, that is in an erosion prone area as
defined in the Coastal Protection and Management Act 1995 and above high water mark (e.g. lowering dune vegetation
on freehold and leasehold land)?

No (1 Yes
If applicable what is the estimated value of the proposed works?

 

 

 

 

 

 

Table B — Material Change of Use

 

a) Does the material change of use involve the following? (Tick the applicable box/es.)

O Operational work carried out completely or partly in a coastal management district

b) Does the material change of use involve building work carried out completely or partly in a coastal management
district that is:

CO the construction of new premises with a gross floor area of at least 1000m?

CT the enlargement of the gross floor area of existing premises by more than 1000m?

 

 

Table C — Reconfiguring a Lot

 

a) Does the reconfiguring a lot involve the following? (Tick the applicable box/es.)
O Land situated completely or partly in a coastal management district

C The construction of a canal

b) How many lots will be created?

 

 

 

 

 

 

Table D — Building Work

 

a) Is the building work on land completely or partly seaward of the coastal building line under the Coastal Protection
and Management Act 1995?

O No CJ Yes

 

 

2. Is the tidal works located within a local government tidal area? (Tick applicable box/es)

 

ml No [vz] Yes- provide details below
Local Government

 

 

 

SuncSHiNe Coasqp REG Cone couricin

 

 

3 IDAS form 23—Tidal work and coastal management districts
Version 2.0 17 December 2012

Page 12

 

3. Confirm that the following mandatory supporting information accompanies this application

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Mandatory information Confirmation of Method of
lodgement lodgement
For ALL applications
Written description of the proposal including a report that addresses any m@ Confirmed
relevant state coastal policies.
For applications involving operational work that is tidal works
A copy of the certificate of title for the land (including tidal land) that A Confirmed
would abut or adjoin the proposed works. oO Cot applicable
Plans showing: [1 Confirmed
e _ the real property description and boundaries of the land (including C1 Not applicable
tidal land) that would abut or adjoin the proposed works
® — the proposed works (including existing works to be removed) in
relation to relevant tidal planes (e.g. mean high water springs)
e the slope angles of the beds and banks of the tidal area and the
finished levels of the proposed works .
if
For tidal work that will occupy a navigable waterway provide a water Confirmed
allocation area plan providing evidence that the proposed work will not O N Li
prejudice the access rights of adjoining property owners. lot applicable
Details of the largest vessel, if any, to be moored at the structure. me Confirmed
Oo Not applicable
For prescribed tidal works, details of how the proposed work addresses a Confirmed
the IDAS code for prescribed tidal work in the Coastal Protection and Oo ;
Management Regulation 2003, schedule 4A . Not applicable
If applicable, certification that the design of tidal works is suitable for 4 Confirmed
intended use, signed by a Registered Professional Engineer of Cl Not applicable
Queensland (or equivalent).
For applications involving Material Change of Use
Plans certified by a registered professional engineer of Queensland EF] Confirmed
R i ing:
(RPEQ) or a registered surveyor showing Oo Not applicable
e the real property description and boundaries of the land
e the proposed works in relation to the location of the coastal
management district and coastal hazards.
For applications involving Reconfiguring a Lot
Plans certified by a registered surveyor showing: im Confirmed
* — the real property description and boundaries of the land [_] Not applicable
° The location of the coastal management district and coastal hazards
in relation to the land being reconfigured
e Any land being surrendered as a separate lot on the plan of
subdivision.
For applications involving building works seaward of a coastal building line
4 IDAS form 23—Tidal work and coastal management districts

Version 2.0 17 December 2012

 

Page 13

 

Plans certified by a registered professional engineer of Queensland
(RPEQ):
e the real property description and boundaries of the land

e the proposed works in relation to the location of the coastal building
line.

 

 

mM Confirmed
O Not applicable

 

 

Notes for completing this form

e Please ensure all applicable fees are paid, noting that referral agency fees are to be paid to the Department of

Environment and Heritage Protection.

e For an application requiring referral to the Department of Transport and Main Roads (DTMR), it is recommended that
the applicant contact DTMR to ensure that required information for assessment of the application is provided.

Privacy—Please refer to your assessment manager, referral agency and/or building certifier for further details on the use

of information recorded in this form.

OFFICE USE ONLY

 

 

Date received Reference numbers

 

 

 

 

 

 

The Sustainable Planning Act 2009 is administered by the Department of State Development, Infrastructure and Planning.
This form and all other required application materials should be sent to your assessment manager and any referral

agencies. Referral agency fees are to be paid to the referral agency.

 

5 IDAS form 23—Tidal work and coastal management districts

Version 2.0 17 December 2012

Page 14

PLANS

 

 

PLAN TITLE DATE
JSP-SJ-25770 ISS B SITE PLAN 16/04/2013
JSP-SJ-25771 ISSA ELEVATION 16/04/2013
JSP-SJ-005 ISS H PIANO HINGE 12/04/2007
JSP-GW-006 ISSE CATWALK 1/10/2007
JSP-SD-102 ISS D 315 PILE BRACKET 6/06/2008
JSP-SD-045 ISS C CONCRETE INSITU PILE 20/04/2006

JSP-SJ-25773 ISSA

PONTOON CONSTRUCTION

14/03/2013

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Rabtuvi Pty Ltd - IDAS Forms.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.