Council archive · source document
Change Existing Approval - 132007.2206.01
Officer: Jack Lewis Direct Telephone: 07) 5449 5183 Fax: (07) 5475 7277 Our Reference: JL013:ae:132007.2206 Your Reference: 00985 L02 NG 9 July 2012 Mr Philip Wilkinson C/- Martoo Consulting Pty Ltd PO Box 1684 NOOSA HEADS QLD 4567 Dear Sir Change to an Existing Approval Sustainable Planning Act 2009 I refer to your request dated 7 June 2012 to make a permissible change to an existing approval granted on 25 June 2008. On 5 July 2012, Council decided your requested changes. Details of the decision are as follows: APPLICATION DETAILS Application No: 132007.2206.01 Street Address: 31 Orealla Cres SUNRISE BEACH QLD 4567 Real Property Description: Lot 187 RP 135362 Planning Scheme: The Noosa Plan (8 August 2011) DECISION DETAILS The following type of approval has been issued: Development Permit for Material Change of Use of Premises - Detached House In relation to the request to make a change to the existing approval, Council on 5 July 2012 decided to: A. Approve a change to Condition 13. RELEVANT PERIOD OF APPROVAL The relevant period for this development approval is identified in the assessment manager conditions. CONSOLIDATED ASSESSMENT MANAGER CONDITIONS Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are numbered, titled and dated: Plan / Document No. Rev. Plan / Document Name Date DA.01 C Site Plan – Bark Design Architects 02.05.08 DA.02 C Ground Floor – Bark Design Architects 02.05.08 DA.03 C First Floor – Bark Design Architects 02.05.08 DA.04 C Second Floor – Bark Design Architects 02.05.08 DA.05 C Roof Plan – Bark Design Architects 02.05.08 DA.06 C North Elevation – Bark Design Architects 02.05.08 DA.07 C East Elevation – Bark Design Architects 02.05.08 DA.08 C West Elevation – Bark Design Architects 02.05.08 DA.09 C South Elevation – Bark Design Architects 02.05.08 DA.10 C Section A – Bark Design Architects 02.05.08 DA.11 C Section B – Bark Design Architects 02.05.08 DA.12 C Section C & D – Bark Design Architects 02.05.08 and as may be amended by these conditions and annotations on the plans. The carport roof line shall not extend beyond the carport floor line. The carport shall remain unenclosed. The development must be undertaken and operated in a manner that causes no detrimental effect upon the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other emissions. A rainwater storage tank with a minimum capacity of 5000 litres shall be provided on site to service the detached house. The tank is to be installed to ensure water from the tank can be used both: For external use such as watering gardens, irrigation, ornamental ponds or water features, topping up swimming pools, outdoor cleaning; and For use in flushing of toilets internal to the building. All hot water systems installed shall be either solar systems; electric heat pump systems; or gas systems (LPG or natural). The building height shall not exceed 8.0 metres above natural ground level and finished ground except where shown on approved plan numbered DA.09 revision C prepared by Bark Design Architects and dated May 2008. A verification survey of the building is to be carried out by a Licensed Surveyor and a certificate lodged with Council at completion of work confirming compliance with the maximum allowable building height as required by either the conditions of approval or the Planning Scheme. Existing trees on the site and within road reserves are to be retained, except where required to be removed due to building operations or the conduct of the approved use. In this regard, the removal of vegetation shall not extend beyond 3 metres of the building footprint of the Detached House. All other vegetation shall be protected from interference resulting from clearing or construction activities by: Clearly marking vegetation to be retained with flagging tape; Installing protective fencing around the drip line of the vegetation; Stockpiling, storage and vehicle parking occurs in already cleared areas and does not cause interference with vegetation; and Low impact construction techniques are used around vegetation to minimise interference with the vegetation. Cleared vegetation is to be suitably processed by one of the following methods and removed from the site:- Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a minimum of 10 metres between edges of heaps. Disposal for firewood. Disposal for landscaping purposes. Transport to alternative site for breaking down materials provided that all necessary permits have been obtained to allow the alternate site to be used for this purpose. The Applicant is advised that other methods may be considered provided full details of the method are submitted. The applicant is advised that burning off is an unacceptable method of disposal. Buildings and structures (including swimming pools, sheds, tennis courts or outbuildings) are not constructed under overhead electricity transmission lines, or within any easements. Currency The Development Permit for a material change of use lapses if the use has not happened by 25 June 2014, unless an application to extend the currency is approved by Council. REFERRAL AGENCY CONDITIONS The referral agencies applicable to this application are: Referral Trigger Referral Status Referral Agency and Address Site in an area where management advice has been given for unexploded ordnance Concurrence Environmental Protection Agency Contaminated Land Unit GPO Box 2771 BRISBANE QLD 4001 A copy of any referral agency conditions is attached. APPROVED PLANS/DOCUMENTS The approved plans and / or documents for this development approval are listed in the following tables: Plan / Document No. Rev. Plan / Document Name Date DA.01 C Site Plan – Bark Design Architects 02.05.08 DA.02 C Ground Floor – Bark Design Architects 02.05.08 DA.03 C First Floor – Bark Design Architects 02.05.08 DA.04 C Second Floor – Bark Design Architects 02.05.08 DA.05 C Roof Plan – Bark Design Architects 02.05.08 DA.06 C North Elevation – Bark Design Architects 02.05.08 DA.07 C East Elevation – Bark Design Architects 02.05.08 DA.08 C West Elevation – Bark Design Architects 02.05.08 DA.09 C South Elevation – Bark Design Architects 02.05.08 DA.10 C Section A – Bark Design Architects 02.05.08 DA.11 C Section B – Bark Design Architects 02.05.08 DA.12 C Section C & D – Bark Design Architects 02.05.08 ADVISORY NOTES The following Advisory Notes are for information purposes only and do not form conditions of approval: The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and Local Law No. 12, prevents a builder or building contractor carrying out building work on a building site in a way that makes or causes audible noise to be made from the building work:- On a Sunday or public holiday, at any time; or On a Saturday or a business day, before 7.00am or after 6.30pm. A maximum penalty of $1,500 applies to an offence under this legislation. Prior to the commencement of the development, a plumbing assessment must be obtained from Noosa Council’s Plumbing Services Section in accordance with the Plumbing & Drainage Act 2002 (as applicable). Fencing to the swimming pool and spa must comply with the Queensland Building Act 1975 Chapter 8 and Part 4 of Building Regulation 2006 in all respects. Direct access from the dwelling to the pool and spa enclosure is not permitted. Aboriginal Cultural Heritage Act 2003 There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003. The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any obligations under the ACH Act. PROPERTY NOTES Not Applicable PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME Not Applicable FURTHER DEVELOPMENT PERMITS REQUIRED Development Permit for Building Works - All Building Works SELF ASSESSABLE CODES The following codes for self-assessable development related to the development approval issued under this Decision Notice must be complied with. Detached House Driveways Code SUBMISSIONS Not Applicable REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME Not Applicable RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Sustainable Planning Act 2009 is attached. OTHER DETAILS If you wish to obtain more information about Council’s decision, electronic copies of which are available on line at www.sunshinecoast.qld.gov.au, or at Council offices. DECISION NOTICE HISTORY 132007.2206 - Original Decision Notice. 25 June 2008 132007.2206.01 – Change to Existing Approval 5 July 2012 Yours faithfully Jack Lewis Development Planner Encl. Appeal Rights Referral Agency Conditions – Environmental Protection Agency INTEGRATED PLANNING ACT 1997 & 1998 REGULATION Referral Agency Conditions – Environmental Protection Agency INTEGRATED PLANNING ACT 1997 & 1998 REGULATION Appeal Rights SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING REGULATION 2009 The following is an extract from the Sustainable Planning Act 2009 (Chapter 7) 466 Appeals about decisions relating to permissible changes (1) For a development approval given for a development application, the following persons may appeal to the court against a decision on a request to make a permissible change to the approval— (a) if the responsible entity for making the change is the assessment manager for the application— (i) the person who made the request; or (ii) an entity that gave a notice under section 373 or a pre-request response notice about the request; (b) if the responsible entity for making the change is a concurrence agency for the application—the person who made the request. (2) The appeal must be started within 20 business days after the day the person is given notice of the decision on the request under section 376. (3) Also, a person who has made a request under section 369 may appeal to the court against a deemed refusal of the request. (4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made. FM1512s/1-07/04/2010 Page 10 of 10 FM1512s/1-07/04/2010 Page 1 of 10 132007.2206.01
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Change Existing Approval - 132007.2206.01Related documentApplication case desk ↗
About this file
- File size
- 552 KB (small file)
- File type
- DOC
No other editions are linked here.