20220237 73 Southern Cross Pde SWMP

of 39

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 20, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                 1 METER MAX.                       STAR PICKETS

                                                          PROVIDE WASH WATER FOR                                                                                                 DROP INLET
                                                                                                                                                                                 WITH GRATE
        TIMBER SLEEPER OR METAL                           TRUCKS EXITING SITE
        GRID 100mm HIGH AND
                                                                                                                                                                                 WIRE OR STEEL MESH
        SPACED AT 300mm CTS                               MIN LE                                                                                                                 (14 GAUGE x 150mm                                                                                            WRAP FILTER
                                                                NGTH
                                                                       10m                                                                                                       OPENINGS) WHERE                                                                                              CLOTH OVER GRATE




                                                                                                                                                                                                                                                                                                                                                     500 - 600mm
                                                                                        BERM 300 HIGH MIN                                                                        GEOTEXTILE IS NOT
       CONSTRUCTION SITE                                                                                                                                                         SELF-SUPPORTING

                                                                                                                                                                                    WOVEN GEOTEXTILE                                                                                                                                                                                            1.5m STAR PICKETS AT MAX.
                                                                                                EXISTING ROADWAY                                                                                                                                                                                                                                                                                2.5m CENTRES



      GEOTEXTILE FABRIC                                                                                                                                                     STAR PICKET                                                                                                                                                                                                         SELF-SUPPORTING
                                                                                                                                                                            FITTED WITH                                                                                                                                                                                                         GEOTEXTILE
                                                          50-75mm GRAVEL BED MIN                                                                                            SAFETY CAP
                                                                                                                                                                                                                                                                                                                                                                                                          FLOW
                                                          200mm THICK                                                                                                                                                                                                                                                                                                                     DIRECTION OF
                          RUNOFF FROM PAD DIRECTED TO                                                                                                                WOVEN GEOTEXTILE
                                                                                                                      SANDBAGS
                          SEDIMENT TRAP
                                                                                                                                                                               RUNOFF                                                                      WRAP FILTER CLOTH
                                                                                                                                                                               WATER WITH                                             RUNOFF               OVER GRATE                                                                                                                           ON SOIL, 150mm x 100mm
                   TEMPORARY CONSTRUCTION VEHICLE EXIT




                                                                                                                                                FLOW
                                                                                                                                                                               SEDIMENT                                               WATER WITH                                                                                                                                                TRENCH WITH COMPACTED
                                          SCALE: N.T.S.                                                               WATERWAY                                                                                                        SEDIMENT                                                                                                                                                  BACKFILL AND ON ROCK, SET
                                                                                                                                                                                                                                                                                                                                                                                                INTO SURFACE CONCRETE

                                                                                                                     EXCAVATION




                                                                                                                                                                                                                                                                                                                                                     600mm MIN.
                                                                                                                                                                                                                                                                             FILTERED                                                                                      SECTION DETAIL
                                                                                                                                                                                                       FILTERED
                                                                                                                                                                                                                                                                              WATER
                                                                                                                                                                                                        WATER
                                                                                                                                                                              GEOTEXTILE
                                                                                                                     EARTH BANK                                               EMBEDDED 150mm
                                                                                                                                                                              INTO GROUND                                                    GEOTEXTILE INLET FILTER TYPE B
                                                                                                                                                                                                                                                                                                                                                                                 20m MAX.




                                                                                                                                                                                                                                                                                                                                     MIN. 1.5m
                                                                                                                                                                                                                                                             SCALE N.T.S
                                                                                                                                                                     FOR DROP INLETS AT NON-SAG POINTS,                                                                                                                                                                                            FLOW
                                                                                                                                                                     SANDBAGS, EARTH BANK OR EXCAVATION USED
                                                                                                                                                                     TO CREATE ARTIFICIAL SAG POINT                                                                                                                                                          STAR PICKETS AT
                                                                                                                                                                                                                                                                                                                                                             MAX. 2.5m SPACINGS
                                                                                                                          GEOTEXTILE INLET FILTER CONSTRUCTION NOTES:                                                                                                                                                                                        TYPICAL

                                                                                                                          1.    FABRICATE A SEDIMENT BARRIER MADE FROM GEOTEXTILE OR STRAW BALES.

                                                                                                                          2.    PICKET SPACING TO BE A MAXIMUM 1.0m CENTRES.                                                                                                                                                                                                       PLAN

                                                                                                                          3.    IN WATERWAYS, ARTIFICIAL SAG POINTS CAN BE CREATED WITH SANDBAGS OR EARTH
                                                                                                                                BANKS AS SHOWN IN THE DRAWING.

                                                                                                                          4.    DO NOT COVER THE INLET WITH GEOTEXTILES UNLESS THE DESIGN IS ADEQUATE TO
                                                                                                                                ALLOW FOR ALL WATERS TO BYPASS IT.                                                                                                                                                                                                                        DIRECTION
                                                                                                                                                                                                                                                                                                                                                                   DISTURBED                                       1.5m STAR PICKETS AT
                                                                                                                                                                                                                                                                                                                                                                                          OF FLOW
                                                                                                                                                         GEOTEXTILE INLET FILTER A                                                                                                                                                                                 AREA                                            MAX. 2.5m CENTRES

                                                                                                                                                                      SCALE N.T.S



                  TIMBER SPACER TO SUIT                            KERB-SIDE INLET




                                                                                                                                                                                                                                                                                                                                                                   UNDISTURBED
                                                                                                                                                                                                                                                                                                                                                                   AREAS

                                                                   GRAVEL-FILLED WIRE MESH OR
                                                                   GEOTEXTILE "SAUSAGE"


                                    OVERFLOW              TIMBER SPACER
         RUNOFF                                                                                                                         GRADIENT OF
                                                          TO SUIT                                                                                                             CAN BE CONSTRUCTED       ALL BATTER GRADES
         WATER WITH                                                                                                                     DRAIN 1% TO 5%
                                                                                                                                                                              WITH OR WITHOUT          2(H):1(V) MAX.
         SEDIMENT
                                                                                                                                                                              CHANNEL                                                                                                                                           SEDIMENT FENCE CONSTRUCTION NOTES:
                                                                                                                                                                                                                                                                                 STABILISE STOCKPILE SURFACE
                                                                                                                                        DIRECTION
                                                                                                                                                          OF FLOW                                                                                                                                                               1.          CONSTRUCT SEDIMENT FENCES AS CLOSE AS POSSIBLE TO BEING PARALLEL TO
                                                                                                                                                                                                                               EARTH BANK                                      2:1                                                          THE CONTOURS OF THE SITE, BUT WITH SMALL RETURNS AS SHOWN IN THE
                                                                                                                                                                                                                                                                    X.)




                                                                                                                                                                                                                   .
                                                                                                                                                                                                                                                                                     SL




                                                                                                                                                                                                          300mm MIN
             SEDIMENT                                                                                                                                                                                                                                             MA                   OP                                                   DRAWING TO LIMIT THE CATCHMENT AREA OF ANY ONE SECTION. THE
                                                                                                                                                                                                                                                              PE(                        E(
                                                                                                                                                                                                                                      FLOW                  O                              MA                                               CATCHMENT AREA SHOULD BE SMALL ENOUGH TO LIMIT WATER FLOW IF
                                                               FILTERED WATER                                                                                                                                                                             SL                                  X.)
          GRAVEL-FILLED WIRE MESH                                                                                                                                                                                                                   2:1                                                                                     CONCENTRATED AT ONE POINT TO 50 LITRES PER SECOND IN THE DESIGN
          OR GEOTEXTILE "SAUSAGE"                                                                                                                                                                                                                                                                                                           STORM EVENT, USUALLY THE 10-YEAR EVENT.
                                                                                                                                                                                    2m MIN
                                                                                                                                             150mm MIN




                                                                                                                                                                                                                                                                                                                                2.          CUT A 150mm DEEP TRENCH ALONG THE UPSLOPE LINE OF THE FENCE FOR THE
                                                                                                                                                                    NOTE: ONLY TO BE USED AS TEMPORARY BANK                                                                  SEDIMENT FENCE
                                                                                                                                                                                                                                                                                                                                            BOTTOM OF THE FABRIC TO BE ENTRENCHED.
                                                                                                                                                                    WHERE MAXIMUM UPSLOPE LENGTH IS 80 METRES.
                   MESH & GRAVEL INLET FILTER CONSTRUCTION NOTES:
                                                                                                                                                                                                                                                                                                                                3.          DRIVE 1.5m LONG STAR PICKETS INTO GROUND AT 2.5m INTERVALS (MAX.) AT
                   1.   INSTALL FILTERS TO KERB INLETS ONLY AT SAG POINTS.                                                                                                                                                      STOCKPILE CONSTRUCTION NOTES:                                                                               THE DOWNSLOPE EDGE OF THE TRENCH. ENSURE ANY STAR PICKETS ARE
                                                                                                                                        DIVERSION DRAIN CONSTRUCTION NOTES:                                                                                                                                                                 FITTED WITH SAFETY CAPS.
                   2.   FABRICATE A SLEEVE MADE FROM GEOTEXTILE OR WIRE                                                                                                                                                         1.     PLACE STOCKPILES MORE THAN 2 (PREFERABLY 5) METRES FROM EXISTING
                                                                                                                                        1.   BUILD WITH GRADIENTS BETWEEN 1% AND 5%.                                                   VEGETATION, CONCENTRATED WATER FLOW, ROADS AND HAZARD AREAS.                             4.          FIX SELF-SUPPORTING GEOTEXTILE TO THE UPSLOPE SIDE OF THE POSTS
                        MESH LONGER THAN THE LENGTH OF THE INLET PIT AND
                        FILL IT WITH 25mm TO 50mm GRAVEL.                                                                                                                                                                                                                                                                                   ENSURING IT GOES TO THE BASE OF THE TRENCH. FIX THE GEOTEXTILE WITH
                                                                                                                                        2.   AVOID REMOVING TREES AND SHRUBS IF POSSIBLE - WORK AROUND THEM.                     2.    CONSTRUCT ON THE CONTOUR AS LOW, FLAT, ELONGATED MOUNDS.                                             WIRE TIES OR AS RECOMMENDED BY THE MANUFACTURER. ONLY USE
                   3.   FORM AN ELLIPTICAL CROSS-SECTION ABOUT 150mm HIGH                                                                                                                                                                                                                                                                   GEOTEXTILE SPECIFICALLY PRODUCED FOR SEDIMENT FENCING. THE USE OF
                                                                                                                                        3.   ENSURE THE STRUCTURES ARE FREE OF PROJECTIONS OR OTHER                             3.     WHERE THERE IS SUFFICIENT AREA, TOPSOIL STOCKPILES SHALL BE LESS
                        x 400mm WIDE.                                                                                                                                                                                                                                                                                                       SHADE CLOTH FOR THIS PURPOSE IS NOT SATISFACTORY.
                                                                                                                                             IRREGULARITIES THAT COULD IMPEDE WATER FLOW.                                              THAN 2 METRES IN HEIGHT.
                   4.   PLACE THE FILTER AT THE OPENING LEAVING AT LEAST A                                                                                                                                                                                                                                                      5.          JOIN SECTIONS OF FABRIC AT A SUPPORT POST WITH A 150mm OVERLAP.
                                                                                                                                        4.   BUILD THE DRAINS WITH CIRCULAR, PARABOLIC OR TRAPEZOIDAL                            4.    WHERE THEY ARE TO BE PLACE FOR MORE THAN 10 DAYS, STABILISE
                        100mm SPACE BETWEEN IT AND THE KERB INLET. MAINTAIN                                                                  CROSS-SECTIONS, NOT "V" SHAPED.
                        THE OPENING WITH SPACER BLOCKS.                                                                                                                                                                                FOLLOWING THE APPROVED ESCP OR SWMP TO REDUCE THE C-FACTOR TO                            6.          BACKFILL THE TRENCH OVER THE BASE OF THE FABRIC AND COMPACT IT
                                                                                                                                                                                                                                       LESS THAN 0.10.                                                                                      THOROUGHLY OVER THE GEOTEXTILE.
                                                                                                                                        5.   ENSURE BANKS ARE PROPERLY COMPACTED TO PREVENT FAILURE.
                   5.   FORM A SEAL WITH THE KERB TO PREVENT SEDIMENT
                        BYPASSING THE FILTER.                                                                                           6.   COMPLETE PERMANENT OR TEMPORARY STABILISATION WITHIN 10 DAYS
                                                                                                                                                                                                                                5.     CONSTRUCT EARTH BANKS ON THE UPSLOPE SIDE TO DIVERT WATER                                                                      SEDIMENT FENCE
                                                                                                                                                                                                                                       AROUND STOCKPILES AND SEDIMENT FENCES 1 TO 2 METRES DOWNSLOPE.
                                                                                                                                             OF CONSTRUCTION.                                                                                                                                                                                                             SCALE: N.T.S.
                   6.   SANDBAGS FILLED WITH GRAVEL CAN SUBSTITUTE FOR THE
                        MESH OR GEOTEXTILE PROVIDING THEY ARE PLACED SO                                                                                              DIVERSION DRAIN                                                                               STOCKPILES
                        THAT THEY CAN FIRMLY ABUT EACH OTHER AND                                                                                                                                                                                                          SCALE N.T.S
                        SEDIMENT-LADEN WATERS CANNOT PASS BETWEEN.                                                                                                        SCALE N.T.S
                             MESH & GRAVEL INLET FILTER
                                         SCALE N.T.S                                                                                                                                                                                                                                                                                                                                        1       0     1    2       3    4    5
                                                                                                                                                                                                                                                                                                                                                                                 SCALE                                               (metres)
                                                                                                                                                                                                                                                                                                                                                                                                    1 : 100 (FULL SIZE)



                                                                                                                               CLIENT DETAILS:                                                            PROJECT ADDRESS:                                                           APPROVED BY:                      PROJECT NAME:

                                                                                                                                                                                                                                                                                                                       PROPOSED RESIDENTIAL DUPLEX
                                                                                                                                                   IZAROX QLD PTY LTD                                                                                                                                                  TITLE:                                                                   STATUS:

                                                                                                                                                                                                                       73 SOUTHERN CROSS PARADE                                                                         EROSION & SEDIMENT                                                      FOR APPROVAL - NOT FOR
 © ABN 89 647 469 707
                                                                                                                                                                                                                        SUNRISE BEACH, QLD, 4567                                                     BEN PARRY          CONTROL DETAILS                                                         CONSTRUCTION
   75 NOOSA DRIVE                                                                                                                                                                                                                                                                                   RPEQ: 28084
                                              01   31/10/22   MCU / OPW ISSUE                         MVP     BRP   BRP        SCALE:
NOOSA HEADS, QLD 4567                                                                                                                                                                                                                                                                                  CPEng
    +61 7 5211 1003                          REV     DATE                 DESCRIPTION                DWN     CHK    APP                                          1:100                                                                                                                              DATE: 31/10/2022
                                                                                                                                                                                                                                                                                                                       DRAWING NUMBER:                                                          PROJECT NUMBER:                                 SHEET REV:

RECORCONSULTING.COM                                                             REVISIONS
                                                                                                                                                         DO NOT SCALE, IF IN DOUBT ASK
                                                                                                                                                                                                                                                                                                                        031                                                                     20220237
                                                                                                                                                                                                                                                                                                                                                                                                                                                 SIZE:
                                                                                                                                                                                                                                                                                                                                                                                                                                                 A1   01
Log in to download the original file

20220237 73 Southern Cross Pde SWMP.pdf · 8.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.