Original source · versioned page text
20220237 73 Southern Cross Pde SWMP
Original PDF page 36, section 1. The text section number identifies this passage in the reader.
DRAINS Modelling Results Project number: 20220237 Calculations: B. Parry Street Address: 73 Southern Cross Parade Locality: Sunrise Beach, NSC Date: 31/10/2022 Pre / Post Comparison 3 3 3 A.E.P Qy Pre (m /s) Qy Post (m /s) Qchange (m /s) Qchange (%) 63.2% AEP 0.022 0.024 0.002 9% 0.5 EY 0.029 0.031 0.002 7% 0.2 EY 0.038 0.041 0.003 8% 10% AEP 0.049 0.049 0.000 0% 5% AEP 0.055 0.056 0.001 2% 2% AEP 0.064 0.064 0.000 0% 1% AEP 0.072 0.072 0.000 0%
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.