                                           Figure 3.2 – DRAINS Post-development catchments


The results of the modelling against the range of design storms for the development under the existing and
proposed development conditions are shown in Table 3.1 Existing and proposed unmitigated site peak discharge
rates.
                              Table 3.1 Existing and proposed unmitigated site peak discharge rates

                                                                       Wyandra Street
                                                                                                     Qchange
                                           A.E.P               Qexisting   Qproposed    Qchange       (%)
                                                               (m³/s)      (m³/s)       (m³/s)
                                        63.2% AEP               0.022       0.024        0.002         9%
                                           0.5 EY               0.029       0.031       0.002          7%
                                           0.2 EY               0.038       0.041       0.003          8%
                                         10% AEP                0.049       0.049       0.000          0%
                                          5% AEP                0.055       0.056       0.001          2%
                                          2% AEP                0.064       0.064       0.000          0%
                                          1% AEP                0.072       0.072       0.000          0%



The results show that the site has increased the total peak flows from the site for a number of storm events however
these changes are typically restricted to the more frequent less severe storm events, where pervious areas have
greater impact through infiltration losses.

The overall magnitude of the increase resulting from the development is small, with a maximum increase of 3L/s
predicted by the modelling for any storm event. This level of change is not considered likely to result in any significant
impacts or damage to the downstream receiving environment and therefore no attenuation is considered necessary
for the proposed development.




                                                                                                                 Page 8 of 14
Project number 20220237
File 20220237 73 Southern Cross Pde SWMP.docx, 2022-10-31 Revision 1
P +61 7 5211 1003                 A 75 Noosa Drive, Noosa Heads,Qld 4567            E [email protected]    recorconsulting.com
Log in to download the original file

20220237 73 Southern Cross Pde SWMP.pdf · 8.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.