Our ref: 131001 Minor Change 121017 mh
Council's ref: 2006/268




12 October 2017



The Chief Executive Officer
Noosa Council
PO Box 141
TEWANTIN QLD 4565

Attention: Development Assessment

Dear Sir/Madam,

Re:          Pre-Request for Minor Change to Approved Material Change of Use
             (Resource – Based Spring Water Bottling Plant)
             314 Cooroy Mountain Road, Cooroy
             Lot 2 on SP143409
             Council's ref: 2006/268

I refer to the above site and the Planning and Environment Court (hereafter “Court”) Judgment
(No 4884 of 2014) dated 23 January 2015 for the abovementioned development. In accordance
with Section 80(3) of the Planning Act 2016 (PA), please find enclosed a pre-response request
for Council to facilitate a request to the Court for a Minor Change to the Development Permit
Material Change of Use to slightly modify the current operations of the site. A copy of the Court
Judgement is included as Attachment I. This request is made on behalf of the owner of the
subject premises, Noosa Beverages Pty Ltd.

Please find enclosed the following in support of this request for a Pre-Request Response:

      •   A Pre-Request to Response Application form, duly completed;
      •   A cheque made payable to the Noosa Council for the $1,904.00, being the
          relevant fee.

BACKGROUND
The subject site was originally approved through the Planning and Environment Court under
the original judgement ref: 318 of 2008. This approval was previously modified in 2015, with
the current Judgement ref: 4884 of 2014 being the most recent valid approval over the site This
request seeks support of a change to the conditions of approval on the basis that the operations
of the premises is slightly different to that which was originally sought and approved, with the
operations now including the supply of bulk water and bottling services for 3rd party companies.
The proposed changes will be discussed in detail below.
Full text of the other 60 pages

Page 2

Minor Change under Section 78
The proposed changes to the original Development Permit and associated conditions, comply with the
definition of a "minor change" as defined by PA. Section 80(3) permits an affected entity to consider a change
to an approval where the change is a "minor change" and provide a pre-request response notice. The definition
of "minor change" is as follows:

    Minor Change means a change that –
    b) For a development approval –
            (i) Would not result in substantially different development; and
            (ii) If a development application for the development, including the change, were
                 made when the change application is made would not cause –
                     (A) The inclusion of prohibited development in the application; or
                     (B) Referral to a referral agency, other than to the chief executive, if there
                          were no referral agencies for the development application; or
                      (C) Referral to extra referral agencies, other than to the chief executive; or
                     (D) A referral agency to assess the application against, or have regard to,
                          matters prescribed by regulation under section 55(2), other than matter
                          the referral agency must have assessed the application against, or have
                          had regard to, when the application was made; or
                      (E) Public notification if public notification was not required for the
                          development application.

In relation to the above definition, we make the following comments:
    •    The proposed changes would not result in a substantially different development;
    •    The proposed changes would not require any additional referrals to SARA;
    •    The original application was Impact Assessable, yet the nature of the proposed changes would
         not, in our opinion, cause a person to make a properly made submission objecting to the
         proposed changes given that the proposed changes are within the scale of the original approved
         decision ref: 318 of 2008.
    •    The proposed changes do not involve prohibited development.

For these reasons outlined above, it is considered that the proposed changes constitute a Minor Change to the
approved development and as such, we respectfully request a response from Council regarding the following
proposed amendments.

AMENDMENT 1
The owner of the site is looking to slightly modify the current freight arrangements for the business operating on
the site. In order to meet the requirements of a supplier, additional B double vehicles are proposed to access the
premises. Currently the number of vehicles is restricted by condition 5C as per the judgement ref: 4884 of 2014.
Please refer to below.

         5C. Trucks attending the site must not exceed a total of 8 trucks per day and must not include B-Doubles.

The current owner wishes to alter this condition to allow up to 14 trucks per day and for them to include B-
Doubles. We are of the opinion that this additional demand should be supported by Council as it is not
substantially different to what was originally approved as per judgement ref: 318 of 2008. The original judgement
included the conditions as shown below.

Page 3

         Vehicle and Truck Movements
         5B. Prior to the Council completing the staged upgrade works to Cooroy Mountain Road, weekly Trucks
         shall be limited as follows:
              a) 40 water carrying trucks (namely all semi-trailers, tankers and other trucks carrying water but
                   excluding B-doubles) per week
              b) 20 ancillary trucks (namely non-articulated trucks and non-water carrying trucks).
         5C. After the Council has completed the staged upgrade works to Cooroy Mountain Road, weekly trucks
         shall be limited as follows:
              a) 50 water carrying trucks (namely all semi-trailers, tankers and other trucks carrying water but
                   excluding B-doubles) per week
              b) 25 ancillary trucks (namely non-articulated trucks and non-water carrying trucks

These conditions allowed for a total of 60 trucks to access the site over the course of a week prior to the upgrade
of Cooroy Mount Road and 75 trucks once the upgrade is completed. The proposed change will result in a total
of 70 trucks accessing the site between Monday to Friday, which is within the originally approved threshold of
75 trucks.

It is also advised that the B-Double trucks proposed to access the site will be 20 metres in length and not a full-
sized B-Double, which can range up to 26m in length or more depending on their configuration. This size truck
when compared to a semi-trailer which can range up to 19m in length, is not considered substantially different
and will not result in impacts to the surrounding area.



We trust the information provides you with sufficient information in relation to the proposal and we look forward
to receiving a positive response from Council at your earliest convenience.

Should you have any further questions in relation to this matter, please feel free to contact me direct.

Yours faithfully,
ADAMS + SPARKES
TOWN PLANNING + DEVELOPMENT




Cameron Adams
MANAGING DIRECTOR

Encl:       Pre-Request to Response Application form
            Cheque
            Attachment I Court Judgement

Page 4

                                                       Attachment I

Copy of Planning and Environment Court Judgement dated 23 January 2015


[OCR of page images]
Attachment |

Copy of Planning and Environment Court Judgement dated 23 January 2015

Page 5

                                                                                                6T0
         ' ilr'NT COURT



 In the j^itinning <ind Environment Court                                      No. 4884 of 2014
 Hejd at: Brisbane
BRISBANE
 Between: NOOSA BEVERAGES PTY LTD ACN 157 784 346                                       Applicant


 And:                NOOSA SHIRE COUNCIL                                            Respondent



                                            FINAL ORDER

 Before:                  His Honour Judge Rackemann
 Date of Hearing:         23 January 2015
 Date of Order:           23 January 2015


 This matter relates to a request to change a development permit for a Material Change of Use
 (Resource-Based Spring Water Bottling Plant) in respect of land located at 314 Cooroy
 Mountain Road, Cooroy in the State of Queensland, which has a real property description of
 Lot 2 on SRI43409, originally granted by this Court on 2 August 2010 by Judgment in Appeal
 No. 318 of 2008 (Approval).

 UPON THE COURT BEING SATISFIED THAT:

 1. There has been compliance with requirements of the Sustainable Planning Act 2009
        (Old) (SPA) relating to giving written notice of this proceeding.

2. The changes to the Approval, identified in the affidavit of Cameron Gregory Adams
        sworn 20 January 2015, are a permissible change having regard to section 367 of the
        SPA.

IT IS ORDERED THAT:

1. The Approval be changed by omitting 'Attachment A" of the Approval and substituting
        Appendix A', which is comprised of the Respondent's amended conditions together
        with plans and reports, which appear at pages 1 to 44 inclusive of this Final Order.


2. Each party bears its own costs of and incidental to this proceeding.




 Final Order f3££.t Aft #^.rtPi^@'^c'nnes W'son Lawyers
 Filed on behalf of the Appli^N/"M£- ^i>>tJT"^ 345 Queen Street Brisbane QLD 4000
 Form PEC-7 Phone: 07 3231 0410
                                                  Fax: 07 3221 2921
                                                         Email: [email protected]
                                                         Ref: CIH:ALO:101570
                                                                                   101570:5451697 1

Page 6

                                                Registrar
                                                D®#m=Ff&GISTRAR
Filed on:            January 2015
Filed by:          Mclnnes Wilson Lawyers
Service address:   345 Queen Street Brisbane QLD 4000
Phone:             07 3231 0410
Fax:               07 3221 2921
Email:             [email protected]




                                                              101570:5451697_1

Page 7

                                  Appendix A
1 APPLICATION DETAILS

Application No:                 132006.268.02

Street Address:                 314 Cooroy Mountain Road Cooroy Mountain Old 4563

Real Property Description:      Lot 2 SP 143409

Planning Scheme:                The Noosa Plan (16 September 2013)

2 RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.

| 3 ASSESSMENT MANAGER CONDITIONS
Land Use

Approved Plans

1. Development undertaken in accordance with this approval must generally comply with
     the approved plans of development. The approved plans are numbered SK01 and
     SK02 dated 2 August 2010 and as may be amended by these conditions.

2. The development must be undertaken and operated in a manner that causes no
     detrimental effect upon the amenity of the neighbourhood by reason of the creation of
     excessive noise, lighting nuisance or other emissions.

Vehicle and Truck Movements

3. All vehicles associated with the use shall travel to the site via the western end of
     Cooroy Mountain Road.

4.


5.


5A. Trucks are not to arrive at or leave the premises outside the hours of 7.00am to
     6.00pm Monday to Friday

5B. -


5C. Trucks attending the site must not exceed a total of 8 trucks per day and must not
     include B-Doubles.

5D. Truck Driver will comply with the requirements of the Truck Drivers Code of Conduct"
     dated 2 August 2010 which requires, amongst other things but is not limited to:

     (a) The use of engine/exhaust brakes along Topaz Street and Cooroy Mountain
           Road be prohibited except in case of an emergency (i.e. safety requirement);
     (b) Maximum speed on Topaz Street and Cooroy Mountain Road to be 60 km/hr.
Hours of Operation

5E. The hours of operation for the use are limited to 6:00am to 6:00pm Monday to Friday.

Maximum Staff

5F. A maximum of 12 staff (including drivers) are permitted on the premises during the
     hours of operation and are not permitted prior to 6:00am.

Page 8

5G.

Home and Office Deliveries

5H, No home or office delivery staff or vehicles shall operate from the premises.

Miscellaneous

6. Existing trees on the site and within road reserves are to be retained, except where
      required to be removed due to building operations or the conduct of the approved use.
     These landscape plans required to be submitted are to denote areas of existing
     vegetation or existing trees proposed or required to be retained.

7. Any advertising sign or device is to comply with Council's policies on advertising.

Land Development

Vehicle Access and Frontage Works

8. The existing site access shall be upgraded. The works must be undertaken as part of
     an Operational Works application and include the following;

      (a) Design and construction generally in accordance with Council's Standard
           Drawing No SEQ R-056.
      (b) The clearing of vegetation in the road reserve as described in the submitted
           Traffic Impact Assessment prepared by RoadPro Development dated 11
            December 2013.
      (c) Any other clearing necessary to provide the "Safe Sight Distance" as indicated
            on Council's Standard Drawing No SEQ R-056.
      (d) Additional signage in Cooroy Mountain Road warning of "Trucks Turning". The
            signage must be in accordance with the current edition of the Manual of Uniform
            Traffic Control Devices Queensland.
       The ongoing maintenance of the site access, associated clearing and signage is the
       property owner's responsibility.

9. The access driveway extending from the Cooroy Mountain Road frontage to the
     buildings must have a sealed surface and be maintained in good order.

10. All vehicles shall enter and leave the site in a forward direction.

Loading Areas

11. Sealed loading and manoeuvring areas for the heavy vehicles shall be provided on site
     generally as shown on drawing number SK-01, dated 2 August 2010 and shall comply
     with the requirements of AS 2890.2-2002 where applicable.

Car Parking

12. A sealed car parking area shall be provided on site generally as shown on drawing
     number SK-01, dated 2 August 2010 and shall comply with the requirements of
     AS/NZS 2890.1-2004 where applicable.

13. A minimum of 13 uncovered carpark spaces shall be provided on site, including 1
     clearly defined disabled carpark space.

14. All carparking shall be kept, maintained and line-marked in a condition fit for use.




                                                                                              2

Page 9

Roadworks Contributions

15. A contribution of $5,960 shall be paid to the Council towards the cost of improvements
     to the major road network of Cooroy, as a result of increase traffic generation caused
      by the proposed development. The contribution shall be paid to the Council prior to
     obtaining a Development Permit for Operational Works. This amount will be subject to
     variations in the Consumer Price Index, All Groups Brisbane from December 2007 until
     the date of payment.

16. A contribution of $160,975 shall be paid to the Council towards the cost of
     improvements to Cooroy Mountain Road, as a result of increase traffic generation
     caused by the proposed development. The contribution shall be paid to the Council
     prior to obtaining a Development Permit for Operational Works. This amount will be
     subject to variations in the Consumer Price Index, All Groups Brisbane from December
     2007 until the date of payment.

Water Quality

17. The applicant shall submit a Water Quality Management Plan for approval prior to the
     issue of any Operational Works Permit. The water quality management plan shall
     address treatment of runoff from the proposed use including effluent, car park runoff
     and by product of the industrial use occurring on site. It shall demonstrate that the
     treatment system proposed results in a no worsening of the water quality of runoff from
     the site as a result of the business operations. It will include the requirement for water
     quality to be monitored for a period of three years from the construction of the car
     parking and effluent disposal systems.

Effluent Disposal

18. -


18A. The design and construction of the on-site effluent disposal system and disposal area
     shall be in accordance with the Site and Soil Investigation for On-site Wastewater
     Treatment and Effluent Disposal prepared by Future-plus Environmental, dated
     February 2014, subject to the following requirements:

        (i) Ongoing monitoring of treatment process and disposal areas shall be undertaken
              to ensure both are functioning effectively over time. They shall be undertaken
              generally as follows:

                    Annual monitoring shall be undertaken from the time of commissioning to
                    determine the quality of the wastewater produced from the effluent
                    treatment system;

                    Monitoring of the soils, vegetation and groundwater in the application area
                    shall be undertaken every three years to establish that such is not
                    percolating into the groundwater;

                    Sampling and testing shall be in accordance with relevant regulatory
                    requirements and manuals such as those provided by the Environmental
                    Protection Agency, with testing undertaken by an accredited Laboratory;

                    Continuous monitoring shall be undertaken by the system for any water on
                    the surface of the application area, downslope resurfacing, changing plant
                    growth on or around the application area and any other signs of problems,
                    and addressed through maintenance or servicing.

        (ii) -
        (iii) -

Page 10

     (iv) -
     (V) -

     (vi) Washing plant, equipment or vehicles shall be undertaken off-site. If on-site
           washing of any plant or equipment is necessary, all wastewater shall be
           collected in a sump and disposed of off-site as trade waste by a registered
           operator.

     (vii) -
     (viii) Rehabilitation of the waterway of the site, as indicated by the 1997 Strategic Plan
             (Open Space-Conservation & Waterway Protection) is to be undertaken in
             addition to replanting as detailed in Drawing HJ0085.1.2 of the Conceptual Site-
           Based Stormwater Management Plan.

18B. -

Erosion & Sediment Control

19. Any person acting on this permit shall prevent erosion and sediment export from
     leaving the site. Site control measures such as silt fencing, controlled gravel access to
     the site and controlled disposal of waste, will be necessary. In this regard plans
     detailing the methods of controlling erosion and sediment are required to be submitted
     to the Council for approval prior to obtaining a Development Permit for Operational
     Works.

General

20. For the following classes of work associated with development, a Development Permit
     for Operational Works must be obtained prior to commencement of works relating to
     that class of work. The application may combine any or all of these classes of work:-

           Access and/or Carparking.
           Roadworks.
           Stormwater Drainage.

           Frontage Works.
           Erosion & Sediment Control
21. A suitably qualified Registered Professional Engineer shall prepare engineering
     drawings and specifications for all engineering works that will become Council
     infrastructure, which shall be submitted in conjunction with an application for a
     Development Permit for Operational Works. In this regard a DXF/DWG file on GDA94
     zone 56 grid of the proposed cadastre layout is to be submitted in conjunction with any
     application for Operational Works.

22. Digital detailed designs including drawings, calculations, specifications and a schedule
      of works, shall be submitted with any application for a Development Permit for
      Operational Works in respect of roadworks and stormwater drainage works. The
      design shall be in accordance with Council's Planning Scheme Policy PSP05 -
      Engineering Design Standards - Roads, Drainage and Earthworks. To avoid conflict
      with underground pipes or services, all existing and proposed services required by the
      development shall be shown on the plans.

23. To facilitate production of As Constructed drawings it is suggested that all design
     drawings are submitted in the Asset Design and As Constructed (ADAC) digital format.
     (Guidelines on the use of ADAC are available at www.adac.com.au).




                                                                                                  4

Page 11

24. As Constructed drawings and data shall be certified by a qualified experienced Civil
     Engineer for design intent, and a Licensed Surveyor shall certify the cadastre and the
     location, level and type of all services and structures. All of which shall be submitted
     to Council for checking and for Council's records.

     The data must fully detail levels for all engineering works including but not limited to
     drainage structures, finished ground levels and pavement surface levels. The data
     shall be submitted in the Asset Design and As Constructed (ADAC) digital format.
     (Guidelines on the use of ADAC are available at www.adac.com.auV

     Approval of works shall not be granted until all As Constructed information has been
     supplied and accepted by Council.

Environmental Health

25. The developer must provide waste storage and disposal facilities in accordance with
     Planning Scheme Policy No 9 "Waste Management Multi-Dwellings and Commercial
     and Industrial Premises", including an external imperviously paved area correctly sized
     for all refuse and recycling containers and suitably screened from public places and
     neighbouring properties. A roofed waste/bin wash area is required with a cold-water
     tap, hose and drain outlet connected to sewer, or approved wastewater disposal
     system via a bucket trap and grease arrester.

26. The development must allow refuse-loading areas to be located off street. All vehicles
     associated with the collection of waste/recyclables, shall enter and leave the site in a
     forward direction, without the need for any unsafe manoeuvring.

27. A Waste Management Plan (Operational) in accordance with Planning Scheme Policy
      No. 9 "Waste Management Multi-Dwellings and Commercial and Industrial Premises",
     must be submitted for the day-to-day operation of the development and approved by
     Council's Health Section prior to issue of development permit for operational works.

      It is critical that waste areas are properly planned. A copy of Planning Scheme Policy
      No. 9 explaining exactly how to predict waste quantities and design waste areas is
      available from Council and the web. The Plan shall include the following information: -

           The types of waste that will be generated from the activities approved within the
           development.
            Estimated volumes or tonnage of both recyclables and waste generated.
            Methods to be used for dealing with garden waste.
            Initiatives to minimize waste either by waste prevention, reduction, re-use or
            recycling.
           Description of procedures for getting all waste to the bins; the storage of bins
           and the collection of bins by the contractor.
           A description of the design details of waste storage and recycling areas including
           size, location, elevation and floor plan, methods of bin washing and system to
           prevent storm water getting into sewer via the bin wash.
           A description of types and volume of waste storage containers to be used.
           The waste and recycling storage area shall include the provision of containers for
           all waste and recycling materials including putresable matter, non-recycling
           waste, paper/ cardboard, glass, aluminum/steel cans, waste oil, styrofoam
           boxes, etc, and bin washing facilities connected to sewer.
           A detailed description of vehicular access to collect waste. Where collection is
           off street, access must allow vehicles to enter and leave the site in a forward
            direction.

Page 12

28. As no Plumbing Final has been issued through Noosa Council Plumbing Services, all
     existing plumbing and drainage, along with Backflow Prevention Devices, are to be
     assessed to ensure compliance with current Legislation and Acts.

Additional Conditions

A1. The effluent holding tank and STP shall have visual and audible high level alarms
     systems installed with secondary power backup (eg: battery power).

A2. The effluent facilities and grease trap facility shall be serviced and maintained on a
     three monthly service regime with all documentation for maintenance and servicing
     forwarded to Noosa Council.

[ 4 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the
Assessment Manager conditions.

5 ADVISORY NOTES

The following Advisory Notes are for information purposes only and do not form
conditions of approval:
1. We advise 'interested parties' i.e. 'developer', 'owner', 'tenant' to consider their
     responsibilities under the Disability Discrimination Act (DDA) in regard to the
     installation of disabled access and the provision of disabled facilities, and that
     access to this building and the provision of sanitary facilities may need to comply
     with the requirements of Section D Part D3 and Section F Clause F2.4 of the Building
     Code of Australia.
2. Noise from building works associated with commercial and or industrial
     development should comply with the following -
      • Limited to between 7:00am to 6:30pm Monday to Saturday.
      • All reasonable measures are taken to minimise noise emissions.
       • Not permitted on Sunday or public holidays.
3. In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud,
    paint, cement, concrete, builder's waste or rubbish should not be permitted to enter
    or be placed where it could reasonably be expected to move into a roadside gutter,
    storm water drain or a watercourse. On the spot fines apply for such offences.
4. The applicant is informed that payment via credit card transaction will not be an
    acceptable method of payment for development contributions conditioned in this permit
    or for infrastructure charge notices issued separately.
 Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or
obtain approvals pursuant to the Aboriginal Cuitural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: "A person
who carries out an activity must take ail reasonable and practicable measures to ensure
the activity does not harm Aboriginal cuitural heritage". It is an offence to fail to comply with
the duty of care. Substantial monetary penalties may apply to individuals or corporations
breaching this duty of care. Injunctions may also be issued by the Land and Resources
Tribunal, and the Minister administering the ACH Act can also issue stop orders for an
activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural
heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to
discuss any obligations under the ACH Act.

Page 13

[6 PROPERTY NOTES
 Not applicable
[ 7 PRELIMINARY APPROVAL OVERRIDING SCHEME
 Not applicable
1 8 FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required      Subject of the required Development Permit


Development Permit for Building Works    All Building Works

Development Permit for Operational       Access, Carparking, Roadworks, Stormwater
Works                                    Drainage, Frontage Works and Erosion and
                                         Sediment Control.

9 SELF ASSESSABLE CODES
The developer must comply with the following codes for seif-assessable development
related to the development approved under this Decision Notice:
      Advertising Devices Code

Page 14

 

 

 

 

 

 

 

 

 

 

 

At

Tee ne

OROY

MOUNTAIN
Spey

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FAGTORY BELOW
at
‘STORE STOREROOM
TELEUARRETERS
WwoRsHoe

FAR MOUSE,

 

 

 

 

 

 

 

 

 

 

 

 

UPPER LEVEL PLAN \

 

/~™

 

&

SCALE 1:200 (42)

8

Page 15

                             HOOUHE




                                                            inniims i




                         O
                         o


                                                                        COORDY
                                                                         MOUNTAIN
                                                                         j^rrrt^^ylnVr




 h'' ' ]'.s ri -'S
                     J

          ll
 ^cior^y-mountain spring water factory   lower level plan                         SCALE 1:200 |A2J



'^OCi^S^

Page 16

                                                  DRAFT

                                Truck Drivers Code of Conduct
                                                            .•<£* r.y'.jiJ "j 5^
Cooroy Mountain Spring Water vf
314 Cooroy Mountain Road, Cooroy vs-jf ¦v*

                                                                                         ^
                                                  'V.Vu^*                            '
Drivers Code for All Heavy Vehicle Deliveries to Site-. '• Uy,
                                                      lUT -.«                       •». \..^v
Cooroy Mountain Spring water operate^ water botttinfejfaciiity,-'at'^U Cooroy Mountain Road, Cooroy.
Trucks access the site to deliver raw maferials ie bottles Vn^to remove both bottled water and bulk
water. Access to the site from the Bruc^Mgh'^ay.;is via the tb^nship of Cooory using streets including
Topaz Street and Cooroy Mountain Road. V':fev , 'v-V,
                                            >v.',         •J&k                     '-'j*

The transport route rega|resif,t^vel througK^reas wiMestablisheci^residential dwellings. Cooroy
Mountain Spring Wat^as road^^pmmitme(^|i^^LocaT*^ority and the Local Community to
undertake delivery and 'deSpatch of product via rbadrtransport trucks in a manner which protects the
environment and the ameni^.of.the^.loj-ahcommunlty^

It rnus^'bejfremembeljed^. that "ai-Ja, truck dflyer-accessing our site> your driving behaviour is a
repres^ritation of the Company impart .that the general public experience and we require all driving
behaviour to^omply with the-foillpwlng'sjandards at all times.
                                V.v% ''"•¦"¦j"
To achieve the de§lred outcomesvtfi>
                                *»v-1
                                      following

    • All drivers mils^.obey all signs, directions and instructions and display respect and courtesy for
         other road users'^;-;;,vfy^V
    • The use of engine brakes'is prohibited in residential areas in close proximity to the site including
        along Topaz Street and Cooroy Mountain Road except in the case of an emergency ie safety
        requirement.

    • All vehicles entering our site must be fully roadworthy and maintained. CMSW reserve the right
        to inspect any vehicle or request maintenance records for any vehicle., CMSW reserves all rights
        to prohibit any vehicle from the site if we believe it may not be roadworthy, safe to operate or
        generates excessive noise.

   • Any accidents, Incidents, complaints, spillages or near misses that occur are to be reported to
       the CMWS General Manager as soon as possible after the occurrence.

Page 17

   • Any litter is to be placed in the litter bins provided on site.
   • No trucks are to access the site prior to 7am on any day of the week.
   • Delivery hours for trucks are limited to the time period 7am to 6pm Monday to Saturday.
   • The use of engine/exhaust brakes along Topaz Street and Cooroy Mountain Road is to be
       prohibited except in the case of an emergency ie safety requirement.
   • Maximum speed of Travel on Topaz Street and Cooroy Mountain Road is to be 60 km/h.
   • Maximum speed of travel on site is 30 km/hr.


                                                                       •£ i' ,

   Drivers who are found to not comply with the above Code q|/{]onduct shall be issued a warning, any
   subsequent Infringements may result in disciplinary actiprtvBjeiKg taken.


       +++++++++4H-+++++++++++++++++++++++++++;f$%+++++++++W;f4:+++++++++++++-H-++++++++


                                     Cooroy Mountain Spring Water ¦,


Confirmation of Understanding of the Code " * :


 (print)                                "        -j..
Of              [company]                                                        ¦


Have read/had the Drivers-Code exjiiained to m'^pd uSdeTstS^hti^he requirements of the Code. I
confirm that I will compiy.with the requirements of^hfedrivers Code:




Sienedr.^i:


Date:              'S\-




Endorsed by; 0"^
                (CMSW Representative).




                                                  17b

Page 18

                              ap Road   Pro
                                  DEVELOPMENT
                                                                   www.roadpro.net.au
                                                                 ABN 98 615 073 565 | ACN 165 601 687

                                                                               P. 0403 889 039
                                                                    E. dianne(a)rocidpro.net.au
                                                        15/76 Wises Rd Maroochydore Q 4558
                                                          PO Box 303 Coolum Beach Q 4573


11th December 2013



Cooroy Property Trust
C/- Adams Sparkes Town Planning + Development
PO Box 1000
Buddina Qld 4575


Dear Cameron,


RE: Cooroy Mountain Spring Water
         Access Arrangements and Trip Generation
          Lot 2 SP 143409 at 314 Cooroy Mountain Road, Cooroy

I refer to our meeting with Council offices held on Monday 18th November 2013 and
further traffic engineering advice regarding the number of trucks generated from the
site and the access arrangements into the site.


The conditions of approval require a change due to ownership changes and changes
to the operational management of the business. The proposed bottling plant will be
scaled back and therefore changes to conditions, 5B, 5C, 5F, 5G, 8 , 12 and 13 are
required as the specific numbers of staff and trucks has been reduced. From a traffic
engineering perspective a review of the existing access has been undertaken in order
to recommend an amendment to Condition 8 of the approval.

          Condition 8
          The applicant shall relocate the existing site to a location between 80 and 110
          metres east of the existing access on Cooroy Mountain Road, to the
          reasonable satisfaction of Council.

Proposed Development
The proposed development includes a bottling plant with between 3 to 5 staff
permanently on site.



RoadPro Development                                                            ABN 98 615 073 565
13492 Cooroy Mtn Spring Water Access                                                   Page 1 of 4

Page 19

The estimated trip generation from the site is expected to generate up to 40 truck
movements per week, including refuse collection, deliveries and water carrying
vehicles. This equates to 8 trucks per day or 16 trips (8 arrivals and 8 departures)
spread throughout the daily hours of operations 7:00am until 6:00pm, Monday to
Friday. It is also estimated the site will generate 10 to 15 light vehicle movements
per day including staff and ancillary business uses.

Assessment of Existing Access
The sight visibility has been reviewed in accordance with Clause 3.4 of Austroads
2009 Guide to Road Design - Part4A: Intersections. Sight distance is measured along
the carriageway from the approaching vehicle to the conflict point.

The posted speed limit on this section of road is 60km/h. The safe intersection
sight distance (SISD) for an observation time of 3 seconds and reaction time of 2.0
seconds (Refer to Table 3.2 of Part 4) for 60km/h is 123m. The access intersection
meets this requirement to the west and achieves a sight distance of 130m. The site
distance to the east was measured to be 113m; however the additional 10m can be
achieved through the removal of vegetation within the road reserve as shown in red
in the photographs below. The vegetation is overgrown saplings only ranging in
trunk diameter of 50 to 150mm.




                       Photograph 1 - View looking east toward Access




RoadPro Development                                                     ABN 98 615 073 565
13492 Cooioy Mtn Spring Water Acccss                                            Page 2 of 4

Page 20

                                                                            £ i
                                                                           ¦M'




                                                                    > -•if'*"' .
                                                                    •' • '




                         Photograph 2 - View looking west from Access

The access driveway location has been reviewed with consideration to the number
of vehicles accessing the site. The existing driveway has been operating adequately
for many years. The proposal meets the requirement for access driveway location in
accordance with Clause 3.2.3 and Figure 3.1 of AS2890.1:2004. Given the good sight
visibility, low traffic volumes and the existing local driver awareness of this access, it
is considered appropriate to retain the driveway in its current location.

The driveway has been assessed in regard to operational performance. According to
Austroads Guide to Traffic Management Part 3 - Traffic Studies and Analysis, Table
6.1, "At unsignalised intersections with minor roads where there are relatively low
volumes of cross and turning traffic, capacity considerations are usually not
significant and capacity analysis is unnecessary". Table 2 below shows the volumes
where intersections operate adequately and capacity analysis is not required.

                                Roadway Capacity
                      Type of Road     Light cross & turning volumes
                                       Maximum design hour volumes
                                        Vehicles per hour (two way)
                   Two Lane major road  400        500          650
                          Cross road         250       200         100

The traffic volumes for Cooroy Mountain Road are 500 vehicles per day with less
than 100 vehicles in the peak hour past the subject site.


RoadPro Development                                                       ABN 98 615 073 565
13492 Cooroy Mtn Spring Water Access                                               Page 3 of 4

Page 21

The peak hour generation from the site is less than 20 trips per hour. Traffic volumes
are low and below the volumes stated in the table therefore, it is considered
unnecessary to undertake intersection analysis as the intersection operates with
uninterrupted flow conditions.

Therefore given the above assessment it is recommended that Condition 8 be
amended to allow the applicant to use the existing driveway to access the site.

If you require any further information, please don't hesitate to contact me.



Yours faithfully




Dianne Hayes
B. Eng (Civil) RPEQ7086




RoadPro Development                                                     ABN 98 615 073 565
13492 Cooroy Mtn Spring Water Access                                            Page 4 of 4

Page 22

                  future-plus
                  ENVIRONMENTAL



                                        18th February 2014



                                        Site & Soil Investigation for
                                        On-site Wastewater
                                        Treatment and Effluent
        Our Ref:                        Disposal

              4377                      Cooroy Mountain Spring
                                        Water


                                        314 Cooroy Mountain Road,
                                        Cooroy Mountain
                                        Client: Cooroy Mountain Spring Water




                     Future-Plus Environmental Sunshine Coast (SQ)
                                 PC Box 1250, Buddina QLD


                       Future-Plus Environmental Gladstone (CQ)
                                PO Bo* 1290, Gladstone QLD




p; 07 5450 2688               e: [email protected]               PO Box 1250, Buddina Q 4575
f: 07 5450 2686                www.future-plus.com.au                      ABN 23 658 506 336

Page 23

                                                                     (Cto) ENVIRONMENTAL
4377-131119-1.0


DOCUMENT CONTROL INFORMATION
File Number: 4377-131119-1.0


Project Manager: Paul Wood


Client: Cooroy Mountain Spring Water


Project Title: Site and Soil Evaluation Report (Cooroy Mountain Spring Water)


Project Authors: Michael Baynes, Anila Cletus, Paul Wood


Project Summary: Site & Soil assessment for on-site sewerage treatment facility and effluent disposal
system for Cooroy Mountain Spring Water.


Document Review

                                 Document
     Document Version                                 Author       Reviewed By       Approved By
                                     Status
     4377-131119-0.1                 Draft        Michael Baynes    Anila Cletus      Paul Wood
     4377-131119-0.2                 Draft        Michael Baynes    Anila Cletus      Paul Wood
     4377-131119-1.0                 Final        Michael Baynes    Anila Cletus      Paul Wood

Issue Approval


                 Destination                  Document Version          Date Dispatched

             Client Copy - digital            4377-131119-0.1          291,1 November 2013
             Client Copy - digital            4377-131119-0.2          20lh December 2013
             Client Copy - digital            4377-131119-1.0           18th February 2014




February 2014 Site & Soil Evaluation Report li
                Wastewater Treatment and Effluent Disposal
               314 Cooroy Mountain Road, Cooroy Mountain




                                                                                                        17

Page 24

                                                                                       x future-plus
                                                                                  V"? ' ENVIRONMENTAL
4377-131119-1,0


NOTICE TO USERS OF THIS REPORT
Apart from fair dealing for the purposes of private study, research, criticism, or review as permitted
under the Copyright Act, no part of this report, its attachments or appendices may be reproduced by
any process without the written consent of Future-Plus Environmental ("FPE"). All enquiries should be
directed to FPE.

We have prepared this report for the sole purposes of Cooroy Mountain Spring Water ("Client") for the
specific purpose only for which it is supplied. This report is strictly limited to the Purpose and the facts
and matters stated in it and do not apply directly or indirectly and will not be used for any other
application, purpose, use or matter.

In preparing this report we have made certain assumptions. We have assumed that all information and
documents provided to us by the Client or as a result of a specific request or enquiry were complete,
accurate and up-to-date. Where we have obtained information from a government register or
database, we have assumed that the information is accurate. Where an assumption has been made,
we have not made any independent investigations with respect to the matters the subject of that
assumption. We are not aware of any reason why any of the assumptions are incorrect.

This report is presented without the assumption of a duty of care to any other person (other than the
Client) ("Third Party"). The report may not contain sufficient information for the purposes of a Third
Party or for other uses. Without the prior written consent of FPE:

        (a) This report may not be relied on by a Third Party; and
        (b) FPE will not be liable to a Third Party for any loss, damage, liability or claim arising out of
        or incidental to a Third Party publishing, using or relying on the facts, content, opinions or
        subject matter contained in this report.

If a Third Party uses or relies on the facts, content, opinions or subject matter contained in this report
with or without the consent of FPE, FPE disclaims all risk and the Third Party assumes all risk and
releases and indemnifies and agrees to keep indemnified FPE from any loss, damage, claim or liability
arising directly or indirectly from the use of or reliance on this report.

In this note, a reference to loss and damage includes past and prospective economic loss, loss of
profits, damage to property, injury to any person (including death) costs and expenses incurred in
taking measures to prevent, mitigate or rectify any harm, loss of opportunity, legal costs,
compensation, interest and any other direct, indirect, consequential or financial or other loss.



Signed on behalf of Date: 18lh February 2014
Future-Plus Environmental




Paul Wood
Director




February 2014                            Site & Soil Evaluation Report                                  in
                                     Wastewater Treatment and Effluent Disposal
                                     314 Cooroy Mountain Road, Cooroy Mountain




                                                                                                               18

Page 25

                                           (CU5&) ENVIRONMENTAL
4377-131119-1.0


                       TABLE OF CONTENTS

1.0 INTRODUCTION 1

   1.1 GENERAL 1
   1.2 SITE BACKGROUND 1
   Figure 1: -Site Location Plan (Source - Google Earth) 2
   1.3 OBJECTIVES OF THIS ASSESSMENT 3
   1.4 REGULATORY REQUIREMENTS 3
2.0 SITE ASSESSMENT 4
  2.1 GENERAL 4
  2.2 PROPERTY DETAILS 4
  2.3 EXISTING DEVELOPMENT 4
  2.4 PROPOSED DEVELOPMENT 4
  2.5 TOPOGRAPHY 4
  2.6 SITE HYDROLOGY 4
  2.7 SUB-SURFACE CONDITIONS 4
  2.8 SOIL PERMEABILITY 5
     2.8.1 Groundwater & Water Bores 5

3.0 EFFLUENT QUALITY AND QUANTITY 6
   3.1 ASSESSMENT OF SOIL AND GROUNDWATER CONDITIONS 6
   3.2 SYSTEM SELECTION 6
   3.3 HYDRAULIC LOADING 7
   3.4 TREATMENT SYSTEM 8
   3.5 ADDITIONAL DESIGN CONSIDERATIONS 8
4.0 RECOMMENDATIONS 10
   4.1 EFFLUENT DISPOSAL 10
   4.2 MEDLI ASSESSMENT 11
   4.3 SETBACK DISTANCES 11
   4.4 STORMWATER DRAINAGE 12
5.0 CONCLUSION 13




February 2014 Site & Soil Evaluation Report iv
                Wastewater Treatment and Effluent Disposal
               314 Cooroy Mountain Road, Cooroy Mountain

Page 26

                                                                         future-plus
                                                                         ENVIRONMENTAL
4377-131119-1.0


                                   LIST OF TABLES

TABLE 1:          Quality Criteria For Secondary and Advanced Secondary Treated
                  Effluent

TABLE 2           Proposed Population Intensities

TABLE 3           Calculated Hydraulic Wastewater Flows

TABLE 4                  i Required Irrigation Area

TABLE 5           Recommended Setback Distances for Secondary and Advanced Secondary
                  Effluent



                                   LIST OF FIGURES

FIGURE 1          Site Locality Plan

FIGURE 2          Borehole Location Plan

FIGURE 3          Irrigation Area Location Plan

FIGURE 4          Irrigation System Typical Design



                                LIST OF APPENDICES

APPENDIX A:       Soil Borehole Logs




February 2014                   Site & Soil Evaluation Report                      V
                            Wastewater Treatment and Effluent Disposal
                            314 Cooroy Mountain Road, Cooroy Mountain

Page 27

                                                                            future-plus
                                                                            ENVIRONMENTAL
4377-131119-1.0


1.0 INTRODUCTION
1.1 GENERAL
Future-Plus Environmental (FPE) have been engaged by Cooroy Mountain Spring Water to
cany out a Site & Soil Investigation for on-site sewage treatment/disposal. The report has

been completed in response to the conditions stated in the Maroochydore Planning and
Environment Court Order dated 2nd August 2010 REF. The investigation was undertaken to

establish the design of an appropriate on-site sewage treatment facility and land application
area to service the existing developments on land described as Lot 2 on SP143409 and located
at 314 Cooroy Mountain Road, Cooroy Mountain. A site locality plan is as shown in Figure 1

below.



Specifically this Report addresses the items detailed in Attachment A, Conditions 18A-B of
the Maroochydore Planning and Environment Court Order dated 2nd August 2010 and
Concept Effluent Treatment & Disposal Strategy Report Completed by Gilbert & Sutherland
dated November 2009.


The Site and Soil Investigation Report and the system design have been earned out in
accordance with the following:


       ¦ Plumbing & Drainage Act 2002;
       ¦ Plumbing & Drainage Regulation 2003;
       ¦ AS/NZS 1547:2000 'On-site Domestic- Wastewater Management';

       ¦ Department of Local Government and Planning 'Queensland Plumbing and

            Wastewater Code' 2011; and

       ¦ Relevant local Council guidelines.


1.2 SITE BACKGROUND
The subject site is contained within one registered allotment described as Lot 2 SP143409 and
has an area of approximately 481,700m2. The site is currently serviced by a septic tank and

associated disposal trench.




February 2014 Site & Soil Evaluation Report 1
                Wastewater Treatment and Effluent Disposal
               314 Cooroy Mountain Road, Cooroy Mountain

Page 28

                                                                              future-plus
                                                                              ENVIRONMENTAL
4377-131119-1.0

It is understood that the owner proposes to upgrade the existing septic tank and trench system

to an aerated sewerage treatment plant (STP) and effluent disposal area, to service the existing

dwelling and daytime factory staff facilities as shown in the attached Site Layout Plan (refer
Figure 2). As part of the upgrade of the on-site sewerage facilities, FPE was engaged to carry

out an assessment of the on-site sewage treatment and potential disposal areas. This site and

soil evaluation report presents the on-site sewage treatment and effluent disposal area

required to cater for the existing development. The assessments and recommendations

contained within this report are based on our site assessment, information provided by the

Client and the recent geotechnical investigation carried out by Australian Soils Investigation
(ASI).



Figure 1: -Site Location Plan (Source - Google Earth)




                                                Regional Location




February 2014                       Site & Soil Evaluation Report                           2
                                Wastewater Treatment and Effluent Disposal
                                314 Cooroy Mountain Road, Cooroy Mountain

Page 29

                                                                                  future-plus
                                                                                  ENVIRONMENTAL
4377-131119-1.0

1.3 OBJECTIVES OF THIS ASSESSMENT
      ¦ Assess the suitability of the subject site for on-site wastewater disposal to be

          undertaken in a sustainable manner, taking into account the climatic, topographical,

          edaphic, and geo-hydrological characteristics prevalent on the sites;

      ¦ Identify any environmentally sensitive areas likely to be affected by wastewater

          treatment and disposal activities;
      ¦ Identify the level of treatment necessary and method of disposal considered most

          suitable for the site; and
      ¦ Identify and assess any potentially significant impacts on human health and the
          natural environment that may occur as a result of wastewater treatment and disposal

          options having regard to relevant legislative requirements.




1.4 REGULATORY REQUIREMENTS
A number of legislative requirements relate to on-site wastewater treatment and disposal

systems under Queensland legislation, along with various other standards and guidelines that

may place constraints on the suitability of the site for on-site wastewater disposal. Those

relevant to the proposed development include:



      ¦ Sustainable Planning Act 2009;
      ¦ Environmental Protection Act 1994;

      ¦ Environmental Protection (Water) Policy 1997;
      ¦ Plumbing and Drainage Act 2002;
      ¦ Standard Plumbing and Drainage Regulation 2003;
      ¦ AS/NZS 1547:2000 'On-site Domestic Wastewater Management';

       ¦ Department of Infrastructure and Planning 'Queensland Plumbing and Wastewater

            Code' 20\\\ and
      ¦ Relevant local Council guidelines.




February 2014                         Site & Soil Evaluation Report                             3
                                  Wastewater Treatment and Effluent Disposal
                                  314 Cooroy Mountain Road, Cooroy Mountain

Page 30

                                                                                future-plus
                                                                                ENVIRONMENTAL
4377-131119-1.0

2.0 SITE ASSESSMENT
2.1 GENERAL
The assessment and recommendations contained in this report have been based on the recent

geotechnical investigations carried out and our recent site assessment of the existing sewage

infrastructure on-site.


2.2 PROPERTY DETAILS
The subject site is contained within registered allotment described as Lots 2 SP143409 and is
located at 314 Cooroy Mountain Road, Cooroy Mountain within the Sunshine Coast Regional
Council local government area. The area of the allotment is approximately 481,700m2.


2.3 EXISTING DEVELOPMENT
The site consists of an existing five (5) bedroom dwelling and the Cooroy Mountain Spring
Water bottling factory, which is utilised by five (5) daytime staff only. The site also contains
a series of free standing sheds.


2.4 PROPOSED DEVELOPMENT
The owner proposes to direct all wastewater generated by the existing dwelling and factory

office facilities to a centralised STP and effluent disposal area.


2.5 TOPOGRAPHY
The subject allotment is situated over a varying topography with a slope of 5-20% from east
to west, towards the existing creek located in the western portion of the property. The

Sunshine Coast Regional Council online mapping facilities illustrate a site elevation between
110 to 280m AHD.


2.6 SITE HYDROLOGY
It is likely that the majority of rainfall on the site will be absorbed into the soil. However,
during extended periods of heavy rainfall, excess rainfall not adsorbed into the soil profile is
likely to flow towards the watercourse located in the western portion of the property, running

parallel with Cooroy Mountain Road.


2.7 SUB-SURFACE CONDITIONS
A preliminary geotechnical investigation for effluent disposal assessment including
percolation testing was recently carried out within the locations indicated on the Borehole


February 2014                          Site & Soil Evaluation Report                          4
                                   Wastewater Treatment and Effluent Disposal
                                   314 Cooroy Mountain Road, Cooroy Mountain

Page 31

                                                                                    future-plus
                                                                              . ' ENVIRONMENTAL
4377-131119-1.0

Location Plan (Figure 2). A total of two (2) boreholes were advanced across the site to a
depth of 2.0metres below the existing ground level (refer Appendix A).


Based on the geotechnical investigation, it is noted that the soil profile encountered within the
site generally consisted of 700mm of moderately structured Silty Clay (Category 4-5)
overlying strongly structured Silty Clay (Category 6) to termination depth at 2.0m.


2.8 SOIL PERMEABILITY
In addition to the soil borehole logs, one (1) permeability test was undertaken within one of
the two boreholes and in accordance with the AS/NZS 1547:2000 to determine the actual
permeability of the site soils. The recorded KSAT value was 0.0213m/day which indicates
that the site soils are subject to very low permeability.


2.8.1 Groundwater & Water Bores
During the site investigations, no permanent water table or seepage was encountered within

the boreholes. However, groundwater table represents local groundwater accumulations that

typically fluctuate between seasons. Therefore groundwater separation distances based on the

local water table depths needs to be considered during the design of on-site sewage systems.




February 2014                        Site & Soil Evaluation Report                            5
                                 Wastewater Treatment and Effluent Disposal
                                 314 Cooroy Mountain Road, Cooroy Mountain

Page 32

4377-131119-1.0


3.0 EFFLUENT QUALITY AND QUANTITY
3.1 ASSESSMENT OF SOIL AND GROUNDWATER CONDITIONS
The soil and percolation test results indicate that the soils at the site are relatively
impermeable but is however still suitable for on-site sewage treatment and effluent disposal.

Groundwater or seepage was not observed within the boreholes carried out during the recent

site investigation.



Given the relatively poor permeability of the site soils and the presence of medium to heavy
clay soils which are more representative of Category 6 soils, the on-site wastewater

assessment for this site is based on Category 6 soils although the Borehole logs indicate the

presence of Categoiy 5 top soils.


3.2 SYSTEM SELECTION
In order to minimise potential impacts on local water quality and to maximise the potential

reuse of treated effluent, it is recommended that all wastewater generated from the

development be treated to a minimum secondary standard. It is understood that all wastewater

generated from the dwelling and factory office facilities will be diverted to the existing septic
tank located geographically downslope of the waste generating facilities. It is proposed that
the existing septic tank will be converted to a pump station, with all collected wastewater to

be pumped to a SIP capable of treating the wastewater to a minimum secondary standard.



Typical quality criteria for secondary and advanced secondary treated effluent nominated in

the Department of Infrastructure and Planning, Queensland Plumbing and Wastewater Code

are summarised in the following table:


Table 1: Quality Criteria for Secondary and Advanced Secondary Treated Effluent
                                                                                Advanced Secondary
                                                    Secondary Treatment
                  Parameter           Units                                         Treatment
                                                      Acceptable Limit
                                                                                 Acceptable Limit
             Suspended Solids          mg/L                  30                         10
                     BODS              mg/L                  20                         10
                Faecal Coliforms    cfu/IOOmL                200                        10




February 2014                          Site & Soil Evaluation Report                                 6
                                   Wastewater Treatment and Effluent Disposal
                                   314 Cooroy Mountain Road, Cooroy Mountain

Page 33

                                                                                                future-plus
                                                                                        _ _ ' ENVIRONMENTAL
4377-131119-1.0

3.3 HYDRAULIC LOADING
The hydraulic loading for this site was calculated based on the anticipated population
intensities within the factory office facilities and the five (5) bedrooms contained with the
existing dwelling, as provided by the Client (refer Table 2 below).


Table 2; Proposed Population Intensities for the subject site

                                Source                         Proposed Population
                                                         5 persons per day (during standard
                      Factory Office Facility
                                                              daytime operating hours)
                    Five (5) Bedroom Dwelling                        8 persons


The hydraulic loading associated with the proposed development intensity mentioned above
can be calculated using Appendix 4.2D of AS/NZS 1547:2000 based on a typical wastewater
flow allowances generated from rural factories and domestic dwelling. For rural factories this

typically ranges from 30L/P/day for on-site roof tank water supply to 50L/P/day for
reticulated community water or bore water supply as per AS/NZS 1547:2000. The typical
wastewater flow allowances for a domestic dwelling with bore water supply and standard

water reduction fixtures is typically 145L/P/day as per AS/NZS 1547:2000. The estimated
hydraulic loading associated with the development intensity has been calculated in the table
below:



Table 3: Calculated Hydraulic Wastewater Flows From Appendix 4.2D AS/NZS1547:2000

                                                                  Allowance based on Bore
             Source                      Estimated Populations                                  Flows (L/day)
                                                                        Water Supply
      Factory Office Facility                     5                          50*                    250
    Five (5) Bedroom Dwelling                     8                          145                   1,160
                                                                  Total Estimated Daily Flows      1,410




Based on the above, a total maximum hydraulic loading of 1,410 litres (8 Equivalent Persons
- EP) per day may be generated from the combined use of the facilities on-site.



Based on the estimated daily flow of 1,410 litres (8 EP) per day, the site does not trigger an
application for an Environmental Relevant Activity 63(l)(a)(i) identified as;



February 2014                                  Site & Soil Evaluation Report                                    7
                                           Wastewater Treatment and Effluent Disposal
                                           314 Cooroy Mountain Road, Cooroy Mountain

Page 34

                                                                                future-plus
                                                                                ENVIRONMENTAL
4377-131119-1.0

         Operating sewage treatment works, other than no-release works, with

        a total daily peak design capacity of 21 to 100 EP if treated effluent is
        discharged to an infiltration trench or irrigation scheme.



If additional people are using the site and/or water conservation is not being practiced within
the building and additional flow is being generated, enlargement of the STP and irrigation
area may be required. This will be additional cost to the owner.


3.4 TREATMENT SYSTEM
Treatment of wastewater must achieve a minimum of secondary or advanced secondary

effluent quality in accordance with the Queensland Plumbing and Wastewater Code 2011.


Treated Wastewater shall comply with the following quality criteria specified in Table 1.1 of
the Queensland Plumbing and Wastewater Code, which are as follows:

                  bod5 < 20mg/L
            . SS < 30mg/L
                  Thermotolerant Coliform (org/lOOmL) < 200


3.5 ADDITIONAL DESIGN CONSIDERATIONS
A number of other design considerations should be made in relation to the following key
elements associated with this project.


Peak Flows and Low Flows
The wastewater treatment plant must be able to cope with periods of sustained high or peak
loads and also periods of very low influent. During these times, appropriate flow balancing

may be necessary in order to buffer against such extreme variable conditions.


Effluent Quality & Concentration
Developments with mixed uses produce (Factory Office Facility) a different type of
wastewater when compared to traditional domestic effluent. Typically, this effluent can be

more concentrated and require specific design considerations.




February 2014                          Site & Soil Evaluation Report                          8
                                   Wastewater Treatment and Effluent Disposal
                                   314 Cooroy Mountain Road, Cooroy Mountain

Page 35

4377-131119-1.0

Alarms and Early Warning Systems
It is recommended that a high level and failure alarms with battery backup be considered as
part of the overall design for the pump station and STP.


Service and Maintenance
The service and maintenance provide must attend and complete the required service,

maintenance and monitoring of the STP on a minimum 3 monthly basis.


Grease Trap
The existing grease trap is to be inspected by a suitable qualified person to ensure the
integrity of the unit, as it is recommended that pre-treatment of the effluent be undertaken,

given the nature of the wastewater likely to be generated by the development. The grease trap

should then be adopted as part of the operation and maintenance of the facility and require
regular inspection, service and maintenance.




February 2014                       Site & Soil Evaluation Report                         9
                                Wastewater Treatment and Effluent Disposal
                                314 Cooroy Mountain Road, Cooroy Mountain

Page 36

                                                                         (x VSfc^) ENVIRONMENTAL
4377-131119-1.0

4.0 RECOMMENDATIONS
4.1 EFFLUENT DISPOSAL
It is recommended that the application of effluent on-site via surface irrigation be adopted.

Contained in Figure 3 of this report is the proposed location of the effluent application areas
and the irrigation system design detail.


Assuming a hydraulic loading of 1,410 litres per day and a DIR of 15mm/week based on
                                                                                             2 •
Table 4,2 A4 of AS 1547:2000 (Category 6 soils), a minimum application area of 658m is
required.



Table 4: Minimum Required Irrigation Area

                                                           Irrigation Area
                                     AS1547:2000 Soil      as Determined
                   Subject Site                                                 Slope
                                         Category              by Table
                                                          4.2A4 of AS 1547
                  Lot 2 SP143409      Soil Category 6           546m2           5-10%



Based on the Table above and presence of Category 4-5 soils to 700mm, an effluent irrigation

area of 625m2 is required for the site. A typical design detail of the irrigation system is shown
in Figure 4.



It is noted that the site has sufficient space available for a 100% reserve area and is shown in

Figure 4.



The application area shall be installed in accordance with the following:
  1) All plumbing and drainage work is to be carried out by licensed persons and strictly in
      accordance with the AS/NZ 3500:2003, AS/NZS 1547:2000 and Plumbing and Drainage
      Act 2002;
  2) Lilac stripe poly pipe is to be buried a minimum of 150mm below ground level from the
      treatment plant to the irrigation area;

  3) Sprinklers are to be used to irrigate the treated effluent within the designated area after
      150mm of mulch or turf has been applied;



February 2014                          Site & Soil Evaluation Report                         10
                                   Wastewater Treatment and Effluent Disposal
                                   314 Cooroy Mountain Road, Ccoroy Mountain

Page 37

                                                                                                  x future-plus
                                                                                   V ENVIRONMENTAL
4377-131119-10

 4) Any depressions within the surface application area are to be filled with soils of same

      category at horizon A.

  5) Effluent warning signs must be clearly displayed in at least two places beside all

      application areas.



The required setback distances as nominated in the Queensland Piumbing and Wastewater

Code 2011 have been summarised in Table 5 of this report.



4.2 MEDLI ASSESSMENT
Based on the resent investigation under by Future-Plus Environmental, in accordance with the

relevant legislation and guidelines, it was deemed unnecessary to undertake a MEDLI

assessment for the site. Rather the detailed site assessment has been undertaken in

accordance with the QLD Plumbing and Wastewater Code and AS:NZS 1547:2000.




4.3 SETBACK DISTANCES
The setback distances from the effluent disposal area shall comply with the Queensland
Plumbing and Wastewater Code which is summarised below:



Table 5: Recommended Setback Distances for Secondary and Advanced Secondary Effluent

                     Feature                                       Recommended Separation Distance

 Footings or Buildings                             Boundaries of land application areas should be positioned at least
                                                   2.0m down slope or 4.0m up slope from the footing or where the site
                                                   is flat, 2.0m from any point of the building footing
 Property boundaries, pedestrian paths and         Boundaries of land application areas should be positioned at least
 walkways, recreation areas                        2.0m down slope, or 4.0m up slope or where the site is flat, 2.0m from
                                                   any point
 Retaining wall footing                            Boundaries of land application areas should be positioned at least
                                                   2.0m down slope, or 4.0m up slope from the retaining wall footing or
                                                   where the site is flat, 2.0m from any point of the building footing
 In ground swimming pool                           Boundaries of land application areas should be positioned at least
                                                   6.0m down slope, or 6.0m up slope from the pool or where the site is
                                                   flat, 6.0m from any point
 In ground potable water tank                      6m from the boundary of the land application area
 Top bank of a permanent watercourse; Top          30m for secondary, 10m for advanced secondary
 bank of intermittent watercourse; Top bank of a
 lake; Top water level of a surface water source
 used for agriculture, aquaculture or stock



February 2014                                 Site & Soil Evaluation Report                                               11
                                          Wastewater Treatment and Effluent Disposal
                                          314 Cooroy Mountain Road, Cooroy Mountain

Page 38

                                                                                                           environmental
4377-131119-1.0

                       Feature                                             Recommended Separation Distance

 purposes; Easement boundary of unlined open
 stormwater drainage channel or drain
 Bore or a dam used or likely to be used for              30m for secondary, 10m for advanced secondary
 human and or domestic consumption
 Unsaturated soil depth to a permanent water              0.6m (vertical) for secondary, 0.3m (vertical) for advanced secondary
 table
Note: Surface spray irrigation system must be located at least 10m from any habitable area



4.4 STORMWATER DRAINAGE
Issues relating to surface flows may become prevalent within the disposal areas during

extended periods of rainfall. Accordingly, it is recommended that a cut-off drain or diversion

drain/mound is constructed upslope of the disposal areas to collect and divert any

surface/subsurface waters away from the disposal area. A retention mound is to be

constmcted downslope of the land application area to prevent any surface water from exiting

the designated disposal area.



All stormwater runoff from the roof of buildings and pavement areas associated with the

development on the site should not be discharged in a concentrated form onto the effluent

disposal areas.




February 2014                                      Site & Soil Evaluation Report                                              12
                                               Wastewater Treatment and Effluent Disposal
                                               314 Cooroy Mountain Road, Cooroy Mountain

Page 39

                                                                                 future-plus
                                                                                 ENVIRONMENTAL
4377-131119-1.0


5.0 CONCLUSION
This report presents recommendations on the sizing of an effluent disposal system (surface

inigation) to cater for the combined use of the existing development and the population
intensities associated with this.



The assessments and recommendations are based on our site assessment and the geotechnical

investigation carried out.



On the basis of the geotechnical investigations and assessment of the flow rates, the subject

allotment is considered suitable for on-site sewage operations within the site. An effluent

irrigation area of approximately 500m2 will be required to adequately dispose the treated
wastewater generated from the development intensity.



Provided the on-site sewerage facility is installed in accordance with the recommendations

provided and relevant codes and standards aforementioned in this report, there will be

minimal risk of environmental impact to the site and surrounding areas. The on-site STP and

effluent disposal area will need to be managed intensively to minimise potential human health
risks and thereby protect and enhance the quality of human health and the environment in the
long term. The system must be operated and maintained in compliance with the

manufacturer's guidelines (information should be sought from the treatment system

manufacturer), to ensure this risk is appropriately managed.



All wastewater should be treated to a minimum secondary or advanced secondary level to

reduce any potential environmental impacts.



Details of the wastewater treatment plant and land application system are summarised below;




February 2014                           Site & Soil Evaluation Report                          13
                                    Wastewater Treatment and Effluent Disposal
                                    314 Cooroy Mountain Road, Cooroy Mountain

Page 40

                                                                               future-plus
                                                                               ENVIRONMENTAL
4377-131119-1.0

      Wastewater Treatment                                    Comments
                              All wastewater generated from the dwelling and factory office
                              facilities are to be diverted to the existing septic tank located
                              geographically downslope of the waste generating facilities. The
 Treatment Standard:
                              existing septic tank is to be converted to a pump station, with all
                              collected wastewater pump to an STP capable of treating the
                              wastewater to a Secondary or Advanced Secondary standard.
 Land Application System:      Surface (heavy droplet) Irrigation System
 Land Application Area:       500m2 irrigation area
                              In accordance with those contained within the Queensland Plumbing
 Setback distances:
                              and Wastewater Code
                              A diversion drain/bund and/or cut-off drain is to be constructed up
                              slope of the land application area in order to intercept both surface
                              and sub-surface water prior to entering the land application area.
                              A retention mound is to be constructed downslope of the land
                              application area to prevent any surface water from exiting the
                              designated disposal area.
 System Recommendations:
                               Grease trap to be installed.

                               Existing Septic System to be converted to a pump station. Effluent to
                               be pumped to the new STP. Locate sanitary drainage line from office
                               facilities I toilets and plumb to pump station.




February 2014                    Site & Soil Evaluation Report                                14
                             Wastewater Treatment and Effluent Disposal
                             314 Cooroy Mountain Road, Cooroy Mountain




                                                                                                       34

Page 41

                                                               future-plus
                                                               ENVIRONMENTAL
4377-131119-1.0




                                FIGURE 1
                           Site Location Plan
                            (Refer to page 2)




February 2014         Site & Soil Evaluation Report                          15
                  Wastewater Treatment and Effluent Disposal
                  314 Cooroy Mountain Road, Cooroy Mountain

Page 42

                                                               future-plus
                                                               ENVIRONMENTAL
4377-131119-1.0




                                FIGURE 2
                       Borehole Location Plan




February 2014         Site & Soil Evaluation Report                          16
                  Wastewater Treatment and Effluent Disposal
                  314 Cooroy Mountain Road, Cooroy Mountain

Page 43

V




                                                        Cooroy Mountain Spring Water—Borehole Location Plan
                              )lus_
                                            Location: 314 Cooroy Mountain Road,
                       ENVIRONMENTAL                    Cooroy Mountain
                                                                                                Scale: Not to Scale


                                                                                              Figure Measurements to Take
    FPE Reference Number: 4377-131119-1.0   Client: Cooroy Mountain Spring Water           Precedence Over Scale Measurements

Page 44

                                                               future-plus
                                                               ENVIRONMENTAL
4377-131119-1.0




                                FIGURE 3
                    Irrigation Area Location Plan




February 2014         Site & Soil Evaluation Report                          17
                  Wastewater Treatment and Effluent Disposal
                  314 Cooroy Mountain Road, Cooroy Mountain

Page 45

                                            Zj.   /% § I
                                            vvvw^AAy
     The wastewater generated by the Domestic |3 —
     Dwelling and Factory Office Facilities is to be |fey (/ " >'
   diverted to the existing Septic tank. The existing li'/ / /'
   Septic tank is to be converted to a pump station.
                                                       Septic/Pump Well
   All collected wastewater is to be pumped to the I
                       new STP.

                                           TT^                                                                         /
                                                                                     ^ UCAIt/j
                                                                                                                  /
                                                                                         \ Emvr»l


                                                                                        ¦~i / V ^
                                                                                          --/ fii ¦%..
                                                               Proposed STP
                                                                 Location
                                                                                                  ih // >
                                                                                                  ^-7 V/7/
                                                                                             y/ //'/
                                  Tv.
                                                                                'sJy
         \                                             "sr--




                                                                                                                 Sprinkler




     Proposed Irrigation
          Area= 625m2
                                                                                                              Slope




                                                        Cooroy Mountain Spring Water—Irrigation Layout Plan

                   future-ptus
                   ENVIRONMENTAL            Location: 314 Cooroy Mountain Road,                   Scale: Not to Scale
                                                        Cooroy Mountain

                                                                                                 Figure Measurements to Take
FPE Reference Number: 4377-131119-1.0 Client: Cooroy Mountain Spring Water Pty Ltd
                                                                                           Precedence Over Scale Measurements

Page 46

                                                                              Sprinkler




                                                     Cooroy Mountain Spring Water—Irrigation Layout Plan

                  future-plus
                                        Location: 314 Cooroy Mountain Road,
                  ENVIRONMENTAL                                                                Scale: Not to Scale
                                                    Cooroy Mountain

                                                                                             Figure Measurements to Take
FPE Reference Number: 4377-131119-1.0   Client: Cooroy Mountain Spring Water Pty Ltd
                                                                                          Precedence Over Scale Measurements
                                                                                                                           ¦m

Page 47

                                                                 future-plus
                                                                 ENVIRONMENTAL
4377-131119-1.0




                                  FIGURE 4
                  Irrigation System Typical Design Detail




February 2014           Site & Soil Evaluation Report                          18
                    Wastewater Treatment and Effluent Disposal
                    314 Cooroy Mountain Road, Cooroy Mountain

Page 48

                                                                                                                                                   Installation Notes:

                    -ÿversion Crain/IVbmd                                                                                                          1) This drawing must be read in conjunction with the corresponding
                                                 -Max spacing
                                                  SOOOrrm           Dstribution laterals wth abow ground sprinkler heads                           Future - Plus Environmental report.
                                                                                                                                                   2) All work must comply with AS/NZ 1547, Queensland Plumbing
                                                                                                                                                   and Wastewater Code, Standard Plumbing and Drainage Regulation
                                                                                                                           Retention Crain/IVbmd   200S,Plumbing and Drainage Act 2002 and Local Council guidelines
   ISOmmrrin                                                                                                                                       3) The wastewater generated by the Domestic Dwelling and
                                                                                                                                                   Factory Office Facilities is to be diverted to the existing Septic tank. The
                                                                                                                                                   existing Septic tank is to be converted to a pump station. AH collected
                                                                                                                                                   wastewater is to be pumped to the new STP.
                                                                                                                                                   4) Delivery pipe should be lilac stripe 25mm or similar poly pipe
                                                                                                                                                   and buried to a minimum of 150mm
                                                                                                                                                   5) A filter is to be installed on the delivery line to prevent clogging
                                                                                                                                                   of the sprinklers
                                                                                                                                                   6) A check valve is to be installed on the delivery pipe
                                                                                                                                                   7) A distribution valve is to be installed (located upslope of the
                                                                                                                                                   irrigation area) to provide even distribution to the irrigation areas and to
                                                                                                                                                   the laterals
                                            o-maope                                                                                                8) Any depressions within the irrigation area are to be filled with soil
                                                                                                                                                   of same category as horizon A
                                                                                                                                                   9) Laterals must be laid parallel with the natural contours of the land
                                                                                                                                                    10) Control valves are to be placed on each sprinkler to ensure even
                                                                                                                                                   distribution
                         r-DN^rsion Crain/Mxnd                                                                                                     11) Sprinklers should be spaced 5m apart and no less than 2.5m from
                                                  i—Cut Off Drain                                                                                  the irrigation area boundary
                                                                                                                                                    12) A diversion drain/mound is to be constructed upslope of the
                                                                                                                                                   irrigation area
                                                                           Low plim-large heavy
                                                                                                                                                    13) A retention mound is to be constructed downslope of the
                                                                           droplet dorre sprinkler
                                                                                                                                                   irrigation area
                                                                                                                                                    14) All stormwater is to be diverted away from the proposed irrigation
                                                                                                                                                   area
                                                                                                                                                    15) Where not already established introduce suitable, non-invasive,
                                                                                                                                                   vegetation that is tolerant to wet conditions and has a high
                                                                                                                                                   evapo-transpiration capacity. Seek advice from your local nursery
                                                                                                                                                    16) Where not already established turf or mulch is to be applied to the
                                                                                                                                                   irrigation area
                                                                                                                                                    17) All vehicles and hooved animals are to be kept off the irrigation
                     Sqang Ste - geder than 1:10                                                                                                   area
                     wiere dcpe exceeds ICP/oacMoe is to be                                                                                         18) A minimum of two warning signs should be placed within each
                     soixjTt frcm FFE prior to instsllstion                                                                                         irrigation area



                                            >10%3Gpe

                                                                                                                                                                           Non-inucEMB, trees, shnte, gouxl
                                                 Standard Drawing
                                                                                                                                                                           cx>^ and tuf aited to vvet oordtions
                  future-plus                    Siifaoe Irrigation System                                                                                                 and the L|3takB of nutrients are to be
                  ENVIRONMENTAL
                                                 Cooroy Mountain Spring                                                                                                    used in the irrigation area



                                                          Rgje [\/feasLremsrts to Take
FPE Ref: 4377-131119-1. OScale:                       Ftesdenoe Q/a-Srale IVfeasuHTErts

Page 49

                                                               future-plus
                                                               ENVIRONMENTAL
4377-131119-1.0




                              APPENDIX A
                          Soil Borehole Logs




February 2014         Site & Soil Evaluation Report                          19
                  Wastewater Treatment and Effluent Disposal
                  314 Cooroy Mountain Road, Cooroy Mountain

Page 50

      Australian Soil Investigations            LOG SECTIONS         Ref No.130185

Client: Future-Plus Environmental
Location 314 Cooroy Mountain Road, Cooroy.
Date: 25-11-13

       Depth         TEST SITE No 1          Depth         TEST SITE No 2
        100           Silty Clay CH          100            Silty Clay CH
        200      Med to heavy clay, orange   200      Med to heavy clay, top soil
        300       Brown, moist, moderate     300      Orange brown traces of fine
        400          Structure.(Cat 5)       400      To large gravel & cobbles
        500                                  500        Roots, moist, moderate
        600                                  600         Structure. (Cat 4-5)
       700                                   700
       800             Silty Clay CH         800             Siltv Clay CH
       900        Heavy clay, dark orange    900       Heavy clay, dark orange
       1000        Brown, moist, strongly    1000       Brown, moist, strongly
       1100          Structured.(Cat 6)      1100         Structured .(Cat 6)
       1200                                  1200
       1300                                  1300
       1400                                  1400
       1500                                  1500
       1600                                  1600
       1700                                  1700
       1800                                  1800
       1900                                  1900
       2000                 End              2000                End
       2100                                  2100
       2200                                  2200
       2300                                  2300
       2400                                  2400
       2500                                  2500
       2600                                  2600
       2700                                  2700
       2800                                  2800
       2900                                  2900
       3000                                  3000
       3100                                  3100




                                                                                     44

Page 51

                                                                                                                  Gii ^
  PLANNING AND ENVIRONMENT .COURT |
            QUE EMS! .'NP
                           I
            - q ^ In,the Planning and Environment Court No. 4884 of 2014
                   Held at: Brisbane
               FiLKD
             BRISBANE
                   Between: NOOSA BEVERAGES PTY LTD ACN 157 784 346 Applicant


                   And: NOOSA SHIRE COUNCIL Respondent




                    NOTICE UNDER SECTION 376 OF THE SUSTAINABLE PLANNING ACT 2009 (OLD)


                   1 This notice is to be given to:

                            (a) Noosa Beverages Pty Ltd ACN 157 784 346 c/- Mclnnes Wilson Lawyers,

                                      345 Queen Street, Brisbane Qld 4001;
COR; RACKEMANN D.C.J.
AT:lA$^ {b)                           Noosa Shire Council c/- Wakefield Sykes, Solicitor, Suite 20, The Cooloola
LEAVE TojtfljllifrfyJC..              Centre, Tewantin Qld 4565;
TO FILE AND READ
..2-3../....! mlL., (c)               Department of State Development, Infrastructure and Planning (DSDIP),


Associate
                  •Ml                 Level 6, 63 George Street, Brisbane Qld 4000; and

                            (d) Department of Environment and Heritage Protection c/- DSDIP, Level 6, 63

                                      George Street, Brisbane Qld 4000.


                            Take notice that:


                            (a) a request to make a permissible change to a development approval

                                      (Request) given by the Planning and Environment Court on 2 August 2010

                                      by Judgment in Appeal No. 318 of 2008 (Approval), in accordance with

                                      section 369 of the Sustainable Planning Act 2009 (Qld) (SPA), was made

                                      to the Court by Originating Application filed on 11 December 2014;

                            (b) the Request to change the Approval has been approved by the Court; and




                   Notice under section 376 of SPA Mclnnes Wilson Lawyers
                   Filed on behalf of the Applicant 345 Queen Street, Brisbane Qld 4000
                                                                     Phone no: (07)3231 0410
                                                                     Fax no: (07) 3221 0479
                                                                     Email: [email protected]
                                                                     Ref: CIH:ALO:101570

                                                                                                   101570:5453508_1

Page 52

the changes to the Approval are shown in track changes in Annexure A of

this notice.




                                                         101570:5453508_1

Page 53

                                  ANNEXURE A
1 APPLICATION DETAILS

 Application No:                 132006.268.02

 Street Address:                314 Cooroy Mountain Road Cooroy Mountain Qld 4563

 Real Property Description;     Lot 2 SP 143409

 Planning Scheme:               The Noosa Plan (16 September 2013)

2 RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.

3 ASSESSMENT MANAGER CONDITIONS
Land Use

Approved Plans

1. Development undertaken in accordance with this approval must generally comply with
     the approved plans of development. The approved plans are numbered SK01 and SK02
     dated 2 August 2010 and as may be amended by these conditions.

2. The development must be undertaken and operated in a manner that causes no
     detrimental effect upon the amenity of the neighbourhood by reason of the creation of
     excessive noise, lighting nuisance or other emissions.

Vehicle and Truck Movements

3. All vehicles associated with the use shall travel to the site via the western end of Cooroy
      Mountain Road.

4.


5.

5A. Trucks are not to arrive at or leave the premises outside the hours of 7.00am to 6.00pm
      Monday to Friday
5B. Prior to the Council completing the staged upgrade works to Cooroy Mountain Road,
     weekly Trucks shall bo limited as follows:

     (a)—^10 water carrying trucks (namely all semi trailers, tankers and other trucks carrying
          water but excluding B Doubles) per week;

     (fe)—20 ancillary trucks (namely non articulated trucks and non-water carrying trucks).

5C. Trucks attending the site must not exceed a total of 8 trucks per day and must not include
      B-Doubles.

     After the Council has completed the staged upgrade works to Cooroy Mountain Road,
     weekly Trucks shall be limited as follows:

     (a^—50 water carrying trucks (namely all semi trailers, tankers and other trucks carrying
         water but excluding B Doubles) per week;

     (fe)—25 ancillary trucks (namely non articulated trucks and non-water carrying trucks).




                                                                                                  1

Page 54

     Noto: The road upgrade referred to is the upgrading of the remaining 2.2 kilometres of
     Cooroy Mountain Road to provide two (2) 3.5 motre wide traffic lanes with a 1.0 metre
     wide soalod shoulder to total formation width of 0.0 motros.—It is envisaged that the
     upgrade works to Cooroy Mountain Road will be completed in the financial year
     2012/2013.
5D. Truck Driver will comply with the requirements of the Truck Drivers Code of Conduct"
     dated 2 August 2010 which requires, amongst other things but is not limited to:

     (a) The use of engine/exhaust brakes along Topaz Street and Cooroy Mountain Road
           be prohibited except in case of an emergency (i.e. safety requirement);
     (b) Maximum speed on Topaz Street and Cooroy Mountain Road to be 60 km/hr.
Hours of Operation

5E. The hours of operation for the use are limited to 6:00am to 6:00pm Monday to Friday.v

     • 6:00am to 10:00pm Monday to Friday;
     • 8:00am to 5:00pm on no more than five (5) Saturdays per year, whore production
           has been disrupted during the week due to breakdown.

Maximum Staff

5F. A maximum of 48-12 staff (including drivers) are permitted on the premises during the
     hours of operation and are not permitted prior to 6:00am except for:

     « 1 employee (maintenance worker) who is permitted to arrive at 5:00am Monday to
           Friday;
     « 1 employee (maintenance worker) who is permitted to arrive at 5:30am Monday to
           Friday;
     « 8 employees (production workers) who are permitted to arrive at 5:^5am Monday
           to Friday.

5G. Administrative staff will be relocated from the site by 31 October 2012 such that the
     maximum number of staff on site from that time forward will be 30, generally represented
     by 15 production staff, 7 semi trailer drivers, 3 management staff (from time to time), 2
     ancillary truck drivers and 2 maintenance workers.

Home and Office Deliveries

5H. No home or office delivery staff or vehicles shall operate from the premises.

Miscellaneous

6. Existing trees on the site and within road reserves are to be retained, except where
     required to be removed due to building operations or the conduct of the approved use.
     These landscape plans required to be submitted are to denote areas of existing
     vegetation or existing trees proposed or required to be retained.

7. Any advertising sign or device is to comply with Council's policies on advertising.

Land Development

Vehicle Access and Frontage Works

8. The applicant shall relocate the existing site access to a location between 60 and 110
      metres east of the existing site access on Cooroy Mountain Road, to the reasonable
     satisfaction of Council.—The intersection between Cooroy Mountain Road and the
     relocated site access shall be designed and constructed to provide safe turning areas
     for the vehicles likely to use the access. In this respect the intersection between Cooroy




                                                                                                  2

Page 55

     Mountain Road and the relocated access shall be designed and constructed in
     accordance with the most recent edition of the Department of Main Roads Road
     Planning and Design Manual and The Noosa Plan Planning Scheme Policy 5
     Engineering Design Standards—Roads, Drainage and Earthworks.—The redundant
     access (i.e. the existing access driveway) shall not be used for vehicular access. The
     ensure vehicular access via the redundant access does not occur, the redundant access
     point within the Cooroy Mountain Road Reserve shall be revegetated in accordance with
     Council standards.

     The existing site access shall be upgraded. The works must be undertaken as part of
     an Operational Works application and include the following:

     (a) Design and construction generally in accordance with Council's Standard Drawing
           No SEQ R-056.
     (b) The clearing of vegetation in the road reserve as described in the submitted Traffic
           Impact Assessment prepared by RoadPro Development dated 11 December
           2013.
     (c) Any other clearing necessary to provide the "Safe Sight Distance" as indicated on
           Council's Standard Drawing No SEQ R-056.
     (d) Additional signage in Cooroy Mountain Road warning of "Trucks Turning". The
           signage must be in accordance with the current edition of the Manual of Uniform
           Traffic Control Devices Queensland.
       The ongoing maintenance of the site access, associated clearing and signage is the
       property owner's responsibility.

9. The access driveway extending from the Cooroy Mountain Road frontage to the
     buildings must have a sealed surface and be maintained in good order.

     The relocated driveway from Cooroy Mountain Road to the car parking loading area
     shall be sealed, designed and constructed in accordance with AS/NZS 2890.1 200*1,
     AS2890.2'2002 and The Noosa Plan Planning Scheme Policy 5 Engineering Design
      Standards Roads, Drainage and Earthworks.—The relocated driveway shall be
     designed and constructed to grades that prevent vehicles from scraping and/or
     bottoming whilst also allowing pedestrians movements along the footpath without any
     step or level difference.—Should any driveways be constructed to grades that do not
     comply with AS/NZS 2890.1 200^1, AS2890.2 2002, Council will require that the
     driveway be removed and reconstructed to levels that do comply.

10. All vehicles shall enter and leave the site in a forward direction.

Loading Areas

11. Sealed loading and manoeuvring areas for the heavy vehicles shall be provided on site
     generally as shown on drawing number SK-01, dated 2 August 2010 and shall comply
     with the requirements of AS 2890.2-2002 where applicable.

Car Parking

12. A sealed car parking area shall be provided on site generally as shown on drawing
     number SK-01, dated 2 August 2010 and shall comply with the requirements of AS/NZS
     2890.1-2004 where applicable.

13. A minimum of 2§-13 uncovered carpark spaces shall be provided on site, including 1
     clearly defined disabled carpark space.

14. All carparking shall be kept, maintained and line-marked in a condition fit for use.




                                                                                                3

Page 56

Roadworks Contributions

15. A contribution of $5,960 shall be paid to the Council towards the cost of improvements
     to the major road network of Cooroy, as a result of increase traffic generation caused by
     the proposed development. The contribution shall be paid to the Council prior to
      obtaining a Development Permit for Operational Works. This amount will be subject to
      variations in the Consumer Price Index, All Groups Brisbane from December 2007 until
      the date of payment.

16. A contribution of $160,975 shall be paid to the Council towards the cost of improvements
      to Cooroy Mountain Road, as a result of increase traffic generation caused by the
      proposed development. The contribution shall be paid to the Council prior to obtaining
      a Development Permit for Operational Works. This amount will be subject to variations
      in the Consumer Price Index, All Groups Brisbane from December 2007 until the date
     of payment.

Water Quality

17. The applicant shall submit a Water Quality Management Plan for Council approval prior
     to the issue of any Operational Works Permit. The Water Management Plan shall be
      prepared by a suitably qualified Environment Engineer and cerifiod by a Pvogistored
      Professional Engineer of Queensland. The Wator Managomont Plan shall detail water
     quantity and quality roquiromonts of environments receiving runoff from the sito. The
     Wator Management Plan shall domonstrato that appropriate treatment measures will be
      incorporated into the proposed use to ensure the existing wator quantity and water
     quality within the environment receiving runoff from all aspects of the proposed use (i.e.
      including but not limited to offluont, carpark runoff and any by products of industrial use
      occurring on site) are maintained in accordance with The Noosa Plan and the
      Environmental Protection (Water) Policy 1997. The Water Quality Management Plan
      shall address treatment of runoff from the proposed use including effluent, car park
      runoff and by product of the industrial use occurring on site. It shall demonstrate that
     the treatment system proposed results in a no worsening of the water quality of runoff
     from the site as a result of the business operations. It will include the requirement for
     water quality to be monitored for a period of three years from the construction of the car
      parking and effluent disposal systems.

Effluent Disposal

18. -


18A. The design and construction of the on-site effluent disposal system and disposal area
     shall be in accordance with the Conceptual Effluent Treatment and Disposal Strategy
     prepared by Gilbert and Sutherland Site and Soil Investigation for On-site Wastewater
      Treatment and Effluent Disposal prepared by Future-plus Environmental, dated
      November 2009 February 2014, subject to the following requirements:

      (i) Ongoing monitoring of treatment process and disposal areas shall be undertaken
            to ensure both are functioning effectively over time. They shall be undertaken
            generally as follows:

                    Annual monitoring shall be undertaken from the time of commissioning to
                    determine the quality of the wastewater produced from the effluent treatment
                    system;

                    Monitoring of the soils, vegetation and groundwater in the application area
                    shall be undertaken every three years to establish that such is not
                    percolating into the groundwater;




                                                                                                    4

Page 57

                 Sampling and testing shall be in accordance with relevant regulatory
                 requirements and manuals such as those provided by the Environmental
                 Protection Agency, with testing undertaken by an accredited Laboratory:

                 Continuous monitoring shall be undertaken by the system for any water on
                 the surface of the application area, downslope resurfacing, changing plant
                 growth on or around the application area and any other signs of problems,
                 and addressed through maintenance or servicing.

     (jj)—A rosorvo disposal aroa 100% tho size of tho primary disposal aroa shall be
           nominated and located outside required buffer areas.—The location shall be
           provided as part of tho detailed design report at the Operational Works application
           stage.

     p)—A minimum secondary standard offluont treatment with disinfection to achieve the
         required microbiological quality (i.e. 200 cfu/100mL with no samplo ovor 1000
         cfu/IOOmL) shall bo adopted.

     (Iv)—Detailed MEDLI modolling shall be undertaken at the Operational Works
          application stage to confirm tho appropriato size for tho offluont disposal area to
          onsuro this is equal to plant uptake, soil storage and onvironmontal acceptable
           release rates.

     (v)—More information on sourco/s and rospectivo volumes of wastewater produced
           during bottling etc shall be provided—in detailed site based stormwater
           management plan (SMBWMP) at the Operational Works application stage,
           including monitoring of actual wastowator production rates.

     (vi) Washing plant, equipment or vehicles shall be undertaken off-site. If on-site
           washing of any plant or equipment is necessary, all wastewater shall be collected
           in a sump and disposed of off-site as trade waste by a registered operator.

     (vU)—Additional monitoring of wastowator discharge at Outflow Point 1 (G&W drawing
          H J0085.1.7) is to bo carried out to domonstrato compliance with tho dosirod
          SBSWMP water quality objectives in support of an Operational Works approval,
          and on an ongoing monthly basis to demonstrate the continued compliance with
          SBSWMP water quality objectives. This monitoring and assessment of tho impact
           must—be—carried—out—compliance—with—the—Ecoaccess—operational—policy
           "Wastewater Discharge to Queensland Waters".

     (viii) Rehabilitation of the waterway of the site, as indicated by the 1997 Strategic Plan
             (Open Space-Conservation & Waterway Protection) is to be undertaken in addition
             to replanting as detailed in Drawing HJ0085.1.2 of the Conceptual Site-Based
           Stormwater Management Plan.

18B. The Conceptual Effluent Treatment and Disposal Strategy prepared by Gilbert and
     Sutherland, datod October 20096 assumes a combined bottled/bulk water production
     volume of 24 ML/annum, which produces 7.2 ML/annum of waste water.—If the
     production rates increases over 24 ML/annum, additional settlement ponds, cheSmical
     treatment and flocculation is required in addition to those measures spoificied in the
     Conceptual Effluent Treatment and Disposal Strategy and condition ISA of this
     approval.—Those additional measures are to be achiovod through larger (vortical)
     holding tanks and chemical dosing within the approved development footprint.

Erosion & Sediment Control

19. Any person acting on this permit shall prevent erosion and sediment export from leaving
     the site. Site control measures such as silt fencing, controlled gravel access to the site
     and controlled disposal of waste, will be necessary. In this regard plans detailing the




                                                                                                  5

Page 58

     methods of controlling erosion and sediment are required to be submitted to the Council
     for approval prior to obtaining a Development Permit for Operational Works.

General

20. For the following classes of work associated with development, a Development Permit
     for Operational Works must be obtained prior to commencement of works relating to that
     class of work. The application may combine any or all of these classes of work:-

           Access and/or Carparking.
            Roadworks.

           Stormwater Drainage.
            Frontage Works.
            Erosion & Sediment Control
21. A suitably qualified Registered Professional Engineer shall prepare engineering
     drawings and specifications for all engineering works that will become Council
     infrastructure, which shall be submitted in conjunction with an application for a
     Development Permit for Operational Works. In this regard a DXF/DWG file on GDA94
     zone 56 grid of the proposed cadastre layout is to be submitted in conjunction with any
     application for Operational Works.

22. Digital detailed designs including drawings, calculations, specifications and a schedule
      of works, shall be submitted with any application for a Development Permit for
      Operational Works in respect of roadworks and stormwater drainage works. The design
      shall be in accordance with Council's Planning Scheme Policy PSP05 - Engineering
      Design Standards - Roads, Drainage and Earthworks. To avoid conflict with
      underground pipes or services, all existing and proposed services required by the
      development shall be shown on the plans.

23. To facilitate production of As Constructed drawings it is suggested that all design
     drawings are submitted in the Asset Design and As Constructed (ADAC) digital format.
      (Guidelines on the use of ADAC are available atwww.adac.com.au).

24. As Constructed drawings and data shall be certified by a qualified experienced Civil
     Engineer for design intent, and a Licensed Surveyor shall certify the cadastre and the
     location, level and type of all services and structures. All of which shall be submitted to
     Council for checking and for Council's records.

     The data must fully detail levels for all engineering works including but not limited to
     drainage structures, finished ground levels and pavement surface levels. The data shall
     be submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines
     on the use of ADAC are available at www.adac.com.au).

     Approval of works shall not be granted until all As Constructed information has been
     supplied and accepted by Council.

Environmental Health

25. The developer must provide waste storage and disposal facilities in accordance with
     Planning Scheme Policy No 9 "Waste Management Multi-Dwellings and Commercial
     and Industrial Premises", including an external imperviously paved area correctly sized
     for all refuse and recycling containers and suitably screened from public places and
     neighbouring properties. A roofed waste/bin wash area is required with a cold-water
     tap, hose and drain outlet connected to sewer, or approved wastewater disposal system
     via a bucket trap and grease arrestor.

Page 59

26. The development must allow refuse-loading areas to be located off street. All vehicles
      associated with the collection of waste/recyclables, shall enter and leave the site in a
     forward direction, without the need for any unsafe manoeuvring.

27. A Waste Management Plan (Operational) in accordance with Planning Scheme Policy
      No. 9 "Waste Management Multi-Dwellings and Commercial and Industrial Premises",
      must be submitted for the day-to-day operation of the development and approved by
      Council's Health Section prior to issue of development permit for operational works.

      It is critical that waste areas are properly planned. A copy of Planning Scheme Policy
      No. 9 explaining exactly how to predict waste quantities and design waste areas is
      available from Council and the web. The Plan shall include the following information: -

            The types of waste that will be generated from the activities approved within the
            development.
            Estimated volumes or tonnage of both recyclables and waste generated.
            Methods to be used for dealing with garden waste.
            Initiatives to minimize waste either by waste prevention, reduction, re-use or
            recycling.
            Description of procedures for getting all waste to the bins; the storage of bins and
            the collection of bins by the contractor.
            A description of the design details of waste storage and recycling areas including
            size, location, elevation and floor plan, methods of bin washing and system to
            prevent storm water getting into sewer via the bin wash.
            A description of types and volume of waste storage containers to be used.
            The waste and recycling storage area shall include the provision of containers for
            all waste and recycling materials including putresable matter, non-recycling waste,
            paper/ cardboard, glass, aluminum/steel cans, waste oil, styrofoam boxes, etc,
            and bin washing facilities connected to sewer.
            A detailed description of vehicular access to collect waste. Where collection is off
            street, access must allow vehicles to enter and leave the site in a forward direction.
28. As no Plumbing Final has been issued through Noosa Council Plumbing Services, all
     existing plumbing and drainage, along with Backflow Prevention Devices, are to be
      assessed to ensure compliance with current Legislation and Acts.

Additional Conditions
A1. The effluent holding tank and STP shall have visual and audible high level alarms
      svstems installed with secondary power backup (eg: batterv power).

A2. The effluent facilities and grease trap facility shall be serviced and maintained on a three
     monthly service regime with all documentation for maintenance and servicing forwarded
      to Noosa Council.

4 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the
Assessment Manager conditions.

5 ADVISORY NOTES

The following Advisory Notes are for information purposes only and do not form
conditions of approval:




                                                                                                     7

Page 60

1. We advise 'interested parties' i.e. 'developer', 'owner', 'tenant' to consider their
      responsibilities under the Disability Discrimination Act (DDA) in regard to the
      installation of disabled access and the provision of disabled facilities, and that access
      to this building and the provision of sanitary facilities may need to comply with the
      requirements of Section D Part D3 and Section F Clause F2.4 of the Building Code of
      Australia.
2. Noise from building works associated with commercial and or industrial
     development should comply with the following -
      • Limited to between 7:00am to 6:30pm Monday to Saturday.
      • All reasonable measures are taken to minimise noise emissions.
       • Not permitted on Sunday or public holidays.
3. In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud,
    paint, cement, concrete, builder's waste or rubbish should not be permitted to enter or
    be placed where it could reasonably be expected to move into a roadside gutter, storm
   water drain or a watercourse. On the spot fines apply for such offences.
4. The applicant is informed that payment via credit card transaction will not be an
    acceptable method of payment for development contributions conditioned in this permit or
   for infrastructure charge notices issued separately.

Aboriginal Cuitural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or
obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: "A person who
carries out an activity must take all reasonable and practicable measures to ensure the
activity does not harm Aboriginal cultural heritage". It is an offence to fail to comply with the
duty of care. Substantial monetary penalties may apply to individuals or corporations
breaching this duty of care. Injunctions may also be issued by the Land and Resources
Tribunal, and the Minister administering the ACH Act can also issue stop orders for an
activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage
value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss
any obligations under the ACH Act.


6 PROPERTY NOTES
Not applicable
7 PRELIMINARY APPROVAL OVERRIDING SCHEM E
Not applicable
8 FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required           Subject of the required Development Permit



Development Permit for Building Works         All Building Works

Development Permit for Operational            Access, Carparking, Roadworks, Stormwater
Works                                         Drainage, Frontage Works and Erosion and
                                              Sediment Control.




                                                                                                      8

Page 61

9 SELF ASSESSABLE CODES
The developer must comply with the following codes for self-assessable development
related to the development approved under this Decision Notice:
     Advertising Devices Code




                                                                                     9

Used in these records

About this file

File size
4.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

131001 Minor Change Request.pdf · 4.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.