Original source · versioned page text
2015-04-28 Attachment 2 to Item 20 Planning and Organisation Agenda Proposed Subordinate Local Law No. 1,3,4,5
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Noosa Shire Council Subordinate Local Law No. 1 (Administration) 2015 19
4 Additional criteria for the granting of approval
(1) For all approvals, the additional criteria are that –
(a) an adequate water source will be available to the proposed temporary home;
and
(b) there is adequate means of waste disposal and sanitation to ensure the
reasonable standards of health and hygiene can be maintained; and
(c) the temporary home can be suitably screened by means of landscaping,
natural vegetation or trees so as not to adversely affect the amenity of the
area; and
(d) the temporary home conforms with one of the following structural criteria in
the circumstances described –
(i) in the case of a tent – the maximum approval period will be for a term
of no more than 3 months; or
(ii) in the case of a vehicle designed or modified as a place of residence –
the maximum approval period will be for a term of no more than 6
months; or
(iii) in the case of a bus designed or modified as a place of residence – the
maximum approval period will be for a term of no more than 12
months; or
(iv) in the case of a self-contained caravan or motorhome – the maximum
approval period will be for a term of no more than 18 months; or
(v) in the case of a shed or class 10A building on the property – the shed or
building is not intended to be used permanently as a habitable building
– the maximum approval period will be for a term of no more than 24
months; or
(vi) in the case of any other proposed temporary home – the applicant can
demonstrate to the local government’s satisfaction that the health,
safety and aesthetic standards will not be adversely affected for the term
of approval applied for.
(2) For an approval relating to a residential caretaker, the additional criterion is that the
owner is liable to demonstrate an ability and capacity to construct a permanent
dwelling within the period of the building approval.
Example -
The applicant has a contract with a registered builder and sufficient funds are available. However,
this criterion may not be satisfied if –
a genuine application has not been made for building approval of a proposed permanent
residence; or
the proposed erection of a permanent residence has been approved and there is less than 90 days
left in the period fixed for finishing the relevant building work.
(3) For an approval relating to a site caretaker –
(a) the applicant must be able to demonstrate that a temporary caretaker is
required to reduce the risk of theft, vandalism or damage to buildings and
facilities on the property; and
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.