Council archive · source document
Change to Development Approval - 51994.09.01
Plann —
ee
es (
e@ | ‘
wW by on” Department of Infrastructure, Local Government and Planning
Change application form
Planning Act Form 5 (version 1.0 effective 3 July 2017) made under Section 282 of the:Planning Act 2016.
This form is to be used for a change an application made under section 78 of the Planning-Act-201.6.Itis. important when
making a change application to be aware of whether the application is for a minor change that will be assessed under
section 81 of the Planning Act 2016 or for an ‘other’ change that will be assessed under section 82 of the Planning Act
2016.
An applicant must complete all parts of this form, and provide any supporting information that the form identifies as being
required to accompany the change application, unless stated otherwise. Additional pages may be attached if there is
insufficient space on the form to complete any part.
Note: All terms used in this form have the meaning given under the Planning Act 2016, the Planning Regulation 2017, or the Development
Assessment Rules (DA Rules).
PART 1 —APPLICANT DETAILS
1) Applicant details
Applicant name(s) (individual or company full name) Naps. “Te yyILS Cn
Contact name (only applicable for companies) Dd ns hk K- Mele ao,
Postal address (P.O. Box or street address) 2. (> Box ZEO Nw conse. te
Suburb Sona ri so- Bens
State Qud
Postcode 4SGT
Country Ade Grok.
Email address (non-mandatory) Gave On ORI 3sB a » Cnin. a”
Mobile number (non-mandatory) Ors 450 2657
Applicant's reference number(s) (if applicable)
2) Owner's consent - Is written consent of the owner required for this change application?
Note: section 79(1)(b)(iii) of the Planning Act 2016 states the requirements in relation to owner's consent.
[¥| Yes — the written consent of the owner(s) is attached to this change application
(_] No — proceed to 3) in Part 2
PART 2— RESPONSIBLE ENTITY DETAILS
3) Identify the responsible entity that will be assessing this change application
Note: see section 78(3) of the Planning Act 2016
6084 Coun ti
PART 3— CHANGE DETAILS
4) Provide details of the existing development approval subject to this change application
Approval type Reference number Date issued Assessment
TL manager/approval entity
ea Development permit TI p -
] Preliminary approval (ee A749 [
L] Development permit
L] Preliminary approval
#) Queensland
Government
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 11 pages
Page 2
Department of Infrast ture, Local Government an 5) Type of change proposed 5.1) Provide a brief description of the changes proposed to the development approval (e.g. changing a development approval for a 5 unit apartment building to provide for a 6 unit apartment building): Chang ina We couver lo a 2 ores coves Fro on ly i court 5.2) What type of change does this application propose? Minor change application — proceed to Part 4 (J Other change application — proceed to Part 5 PART 4— MINOR CHANGE APPLICATION REQUIREMENTS 6) Are there any affected entities for this change application [¥] No — proceed to Part 6 C] Yes — list all affected entities below and proceed to Part 6 Note: section 80(1) of the Planning Act 2016 states that the person making the change application must give notice of the proposal and the details of the change to each affected entity as identified in section 80(2) of the Planning Act 2016. Affected entity Pre-request response provided? (where a pre- | Date notice given (where no pre- request response notice for the application has | request response provided) been given, a copy of the notice must accompany this change application) (J No LJ Yes — pre-request response is attached to this change application J No LJ Yes — pre-request response is attached to this change application J No LJ Yes — pre-request response is attached to this change application PART 5— OFHER CHANGE APPLICATION REQUIREMENTS Note: fo complete this part it will be necessary for you to complete parts of DA Form 1 and in some instances parts of DA Form 2, as mentioned below. These forms are available at www.dilgp.qid.gov.au. 7) Location details - Are there any additional premises included in this change application that were not part of the original feol-\7—1 ey e)unl-valar=l9)¢)ge)\z- ied LANo _] Yes — complete Part 2 (Location details) of DA Form 1 as it relates to the additional premises is completed and provided with this application. 8) Development details 8.1) Are there any new or changed development aspects included in this change application that are not part of the original development approval? L] No = proceed to 9) (Yes — the completed Sections 1 and 2 of Part 3 (Development details) of DA Form 1 as these sections relate to the new or changed aspects of development are provided with this application. 8.2) Does the change application involve building work? LI No L Yes — the completed Part 5 (Building work details) of DA Form 2 as it relates to the change application is provided with this application. Page 2 Planning Act Form 5 - Change application form Version 1.0—3 July 2017
Page 3
FOR QUOTATION ONLY C Development © 2unter 20 SEP 2017 Tewanti> 1000) 9500 a o Sa AS as a iA A aa % S SS Sas wz CLEAR OPENING 10000W X 90S0H —— CLEAR OPENING 15000W X B575H CLEAR OPENING 20000W X 7835H CLEAR OPENING 25000W X 685SH 36000 44550 41460 TITLE: DOME HEIGHT CLEARANCE JWIOTH Gum LENGTH o/a HEIGHT: 9.5m LOCATION: NOTED ELSEWHERE INOTES: GROUND MOUNT 0 -HC-44.5-95-B [a pe P™ 17703/2017 [a3 yy Ora ie pour o ict = seappabnen us noe netrane 1400 C\Users\Production Manager\Dropbox\Container Domes Australia\Quotations\Drawings\Height clearance drawings\Cad folder\Domes - HEIGHT CLEARANCE - HIGH CUBE.dwg, 17/03/2017 11:34:02 AM, DWG To PDF.pc3
Page 4
9) Referral details - Do any aspects of the change application require referral for any referral requirements? Note: The application must be referred to each referral agency triggered by the change application as if the change application was the original development application including the proposed change. No (_] Yes — the completed Sections 1 and 2 of Part 5 (Referral details) of DA Form 1 as it relates to the change application is provided with this application. Where referral is required for matters relating to building work the referral checklist for building work is also completed. 10) Information request under Part 3 of the DA Rules (1) | agree to receive an information request if determined necessary for this change application (1) | do not agree to accept an information request for this change application Note: By not agreeing to accept an information request |, the applicant, acknowledge: e that this change application will be assessed and decided based on the information provided when making this change application and the assessment manager and any referral agencies relevant to the change application are not obligated under the DA Rules to accept any additional information provided by the applicant for the change application unless agreed to by the relevant parties e Part 3 of the DA Rules will still apply if the application is an application listed under section 11.3 of the DA Rules. Further advice about information requests is contained in the DA Forms Guide. 11) Further details J Part 7 of DA Form ‘1 is completed as if the change application was a development application and is provided with this application. PART 6 — CHECKLIST AND APPLICANT DECLARATION 12) change application checklist | have identified the: e responsible entity in 3); and e fora minor change, any affected entities; and es e for an ‘other’ change all relevant referral requirement(s) in 9) Note: See the Planning Regulation 2017 for referral requirements For an ‘other’ change application, the relevant sections of DA Form 1 — Development OY. details have been completed and is attached to this application RANOr lopidabie For an ‘other’ change application, where building work is associated with the change oy, application, the relevant sections of Form 2 — Building work details have been Ket. licabl completed and is attached to this application lele| elec Supporting information addressing any applicable assessment benchmarks is attached to this application Note: This includes any templates provided under 23.6) of DA Form 1 that are relevant as a ih result of the change application, a planning report and any technical reports required by the Yes relevant categorising instrument(s) (e.g. the local government planning scheme, State Planning Policy, State Development Assessment Provisions). For further information, see DA Forms Guide: Planning report template. / Relevant plans of the development are attached to this development application of Note: Relevant plans are required to be submitted for all relevant aspects of this change Yes. application. For further information, see DA Forms Guide: Relevant plans. 24) Applicant declaration M By making this change application, | declare that all information in this change application is true and correct. LJ Where an email address is provided in Part 1 of this form, | consent to receive future electronic communications from the responsible entity and any relevant affected entity or referral agency for the change application where written information is required or permitted pursuant to sections 11 and 12 of the Electronic Transactions Act 2001. Note: It is unlawful to intentionally provide false or misleading information. Page 3 Planning Act Form 5 - Change application form Version 1.0—3 July 2017
Page 5
Department of Infrastructure, Local Government and Planning, Privacy — Personal information collected in this form will be used by the responsible entity and/or chosen assessment manager, any relevant affected entity or referral agency and/or building certifier (including any professional advisers which may be engaged by those entities) while processing, assessing and deciding the change application. All information relating to this change application may be available for inspection and purchase, and/or published on the assessment manager's and/or referral agency's website. Personal information will not be disclosed for a purpose unrelated to the Planning Act 2016, Planning Regulation 2017 and the DA Rules except where: ¢ such disclosure is in accordance with the provisions about public access to documents contained in the Planning Act 2016 and the Planning Regulation 2017, and the access rules made under the Planning Act 2016 and Planning Regulation 2017; or e required by other legislation (including the Right to Information Act 2009); or e otherwise required by law. This information may be stored in relevant databases. The information collected will be retained as required by the Public Records Act 2002. PART 7 — FOR OFFICE USE ONLY Date received: (as oe Reference number(s): | QLeave notification and payment Note: For completion by assessment manager if applicable Description of the work QLeave project number Amount paid ($) Date paid Date receipted form sighted by assessment manager Name of officer who sighted the form The Planning Act 2016, the Planning Regulation 2017 and the DA Rules are administered by the Department of Infrastructure, Local Government and Planning. This form and all other required change application materials should be sent to the responsible entity. Page 4 Planning Act Form 5 - Change application form Version 1.0—3 July 2017
Page 6
NTC Committee Meeting. Held at Noosa Tennis Club 22/5/2017 Meeting opened at 7:05pm Present:- Geoffrey Cole, Phil Hunter, Ptor Gjestland, David Maddaford, Paul Gaffney, Belinda Redhead, Peter Bell and David McMahon. Apologies:- Laura Livingstone. Minutes from previous Committee Meeting read. Confirmed: Paul Gaffney Seconded: David Maddaford No business. arising. Treasurer’s Report. Peter Bell reported that he was not up to date with the accounts yet. Phil reported that we need to transfer remaining funds from the Bank of Qld accounts into new accounts at Bendigo Bank, and needed Mark and James to carry this out. Phil and Geoffrey need to activate the account at the Bendigo Bank. Phil to organise how much and how long to deposit funds into the term deposit account at the Bendigo Bank. Also organize the deposit for Grants account with $20,000 plus $10,000 from Noosa Tennis Academy General Business: 1] Gaming Grant [ $35,000 ] put in by Momentum for LED lights and we are waiting for the outcome. 2] Alice’s letter of resignation to be published in our Newsletter if she agrees. Alice to be approached by Paul. 3] Liquor Licence to be left as it is at the present time, but will be discussed again in the future. 4] Holden Grant. There are two components $35,000 $250,000 This has been offered to be done by Alice Dickson. Motion: The Committee has discussed and decided on the Holden Grant [if successful ] to be allocated for the construction of two new courts, with the surface to be decided at a later date. Proposed by Paul Gaffney. Seconded by Peter Bell. 5] Australian Sports Foundation. Presented by Belinda and no further action required. 6] Skills Alliance Group They will start in September and the jobs have been decided on at previous meetings. 7] Working Bee David McMahon to talk to John Fergusson for jobs to be done, and the preferred time. 8] Tennis Queensland have requested a profile from all Members of our Club, and are
Page 7
Payment Terms: 25% Deposit to confirm Order, Balance of 75% must be paid prior to delivery or dispatch. We accept payments via direct deposit, cash, credit card and cheque. Fees apply to payments by credit card. Purchase Orders accepted from approved customers. By Accepting this Quote and placing an Order, you agree to be bound by the attached terms and conditions. If you have any questions concerning this quotation, please contact us. THANK YOU FOR YOUR BUSINESS P: 1300 793 822 [email protected] H F ON: ee ewe let)
Page 8
donating $5 per response and the raised money will be used for Club maintenance. 9] Insurance claim submitted to repair the sail over the play area over the hitting wall. 10] Roof: Motions: a) The Club is registering for GST, for rebates on current and future projects. Proposed by David Maddaford. Seconded by Belinda Redhead. b) The Committee intends to present all the details of the proposed roof cover via email and on theClub Notice Board within one month, with an expectation that the structure will be completed by the end of 2017 c) The Committee agrees to approve the change in scope of the “court cover” project, from one court to two courts. Considerable economies of scale have been achieved through this change. d) The Committee accepts David McMahon’s proposal of an advanced payment of the $2,000 per year for the first 5 years (equating $10,000) be put directly toward the roof project. Proposed by Geoffrey Cole. Seconded by Phil Hunter. 11] In response to John Fergusson communication with Phil: Motion: a) Several weeks prior to sending out the Notice of Meeting for the AGM, the club will send out correspondence advising Members of the date of the AGM and seek nominations for the Committee of Management positions, AS WELL AS any items/issues that are to be put before the members at the AGM. b) Such correspondence advising of the upcoming AGM should go out sufficiently early to allow the Club Secretary to receive back nominations and any other items/issues by the respective closing date, so that the Notice of Meeting can be sent to members outlining the business to be conducted at the AGM. c) Only that business which has been posted on the Notice of Meeting can be attended to at the AGM. Therefore, no general business or other issues can be addressed at the AGM as no Notice of such business or issues have been given prior to the meeting. Proposed by Paul Gaffney. Seconded by Geoffrey Cole. Meeting closed 9:15pm
Page 9
Print activity statement Label Description 5B Owed by ATO T4 Reason for variation 17 Instalment amount T8 Estimated tax for year T9 Varied amount payable for quarter PAYG tax withheld Label Description wi Total salary, wages and other payments Ww2 Amount withheld from Total salary, wages and other payments W3 Other amounts withheld W4 Amount withheld where ABN not quoted 4 Income tax withheld amount Sub totals 8A Owed to ATO 8B Owed by ATO Amount owing to ATO $5,051.00 Page 2 of 3 Value $0.00 $2,004.00 Based on the notional tax $ 7,686.20 from the 2016 assessment. $0.00 $0.00 T9 is an ATO estimate only Value $16,845.00 $585.00 $0.00 $0.00 $585.00 $8,159.00 $3,108.00 https://basp.ato.gov.au/T axA gentPortal/default.aspx ?nav=TAP.SPAContainer.SPACo... 12/09/2017
Page 10
email: luis. mofonsecag@icloud com By: Luis Fonseca Phone: 0467 026 934 ee
Page 11
By: Luis Fonseca email: luis. mafonsecagichoud.com Phone: 0467 026 934
Page 12
By: Luis Fonseca email: luis. mgfonsecagiicloud com Phone: 0467 026 934
Used in these records
Change to Development Approval - 51994.09.01Related documentApplication case desk ↗
About this file
- File size
- 3.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.