Skip to the record
The only place to find full transcripts.

Original source · versioned page text

3. FINAL-160721-BA4090-Town Planning Report

Attached to the e-mail MCU16/0084 & OPW16/0157 Development Application IDAS Forms, Planning report & Plans email 1 of 3.

of 143

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

                      S7.2 For trees higher than 4m,
                      trees are planted at a distance
                      from any part of an electricity
                      transmission line at least equal to
                      the expected height of the tree at
                      maturity (see Figure 14-17);

                      AND

                      S7.3 For power lines that connect
                      to a premises, the height of plant
                      species at maturity provides for a
                      2m clearance below the power
                      line; (see Figure 14-18)

                      AND

                      S7.4 Trees and large scrubs are
                      located a minimum of—

                      a) 5m from electricity poles and
                      pillars;

                      b) 4m from street lamps;

                      c) 2m from stormwater catchment
                      pits; and

                      d) 2m from underground services
                      and utilities;

                      AND

                      S7.5 Plants are located to enable
                      tradespersons to access, view and
                      inspect service meters, such as
                      water and electricity meters;

                      AND

                      S7.6 Root barriers are installed
                      around trees that are located
                      within 3m of any infrastructures or
                      that have potentially invasive
                      roots.

Entry statements




URBIS
NOOSA ENERGY CENTRE                                         APPENDICES
Log in to download the original file

3. FINAL-160721-BA4090-Town Planning Report.pdf · 3.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.