Skip to the record
The only place to find full transcripts.

Original source · versioned page text

3. FINAL-160721-BA4090-Town Planning Report

Attached to the e-mail MCU16/0084 & OPW16/0157 Development Application IDAS Forms, Planning report & Plans email 1 of 3.

of 143

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

system;                                 S5.2 Direct and accessible             S5.2 Complies
                                        linkages are provided into the site.
b) to encourage walking and                                                    The proposal allows a pedestrian
cycling;                                                                       connection from Eumundi Noosa
                                                                               Road to Project Avenue.
c) to add variety and visual
interest;
                                        S5.3 Pathway and landscape             Complies with Probable
d) to conserve street trees,            works are provided to a high           Solution S5.3 – S5.4– Pathways
vegetation and other significant
                                        standard to Council specifications     and landscaping will be to a high
features;                               and assessed for compliance with       standard in accordance with
e) to allow equitable access to
                                        local government cycling facility      Council’s requirements.
public areas and community              design standards.
                                                                               For further details please refer to
facilities;                             S5.4 Pathways are provided to          the Landscape Report attached as
f) with adequate lighting where         cater for shared use and cater for     Volume 2.
                                        both commuting and recreational
subject to high night time usage;
                                        usage and exceed minimum
g) in locations where there is          standards.
casual surveillance;

h) or widened at potential conflict
points;

i) to incorporate—

i) street tree planting to enhance
the streetscape;

ii) directional signage that is
visible under all conditions.

O6 Pedestrian and cycle path            S6.1 Pedestrian and cycle path         S6.1 Complies
infrastructure is designed and          infrastructure is designed and
constructed to –                        constructed –                          Pathways and cycle paths will be
                                                                               provided in accordance with
a) provide a stable, smooth             d) in accordance with                  Council requirements and
surface, including across               AUSTROADS Part 14 - Bicycles,          Australian Standards.
driveways, sections and joins;          Section 6;
                                                                               Refer to the Traffic Report
b) be easily maintained;                e) to comply with local                attached as Volume 4.
                                        government design standards.
c) a width and longitudinal
gradient to cater for projected         f) to have navigational signs in
usage, including nearby—                accordance with Council
                                        ‘Wayfinding’ signage
i) high activity nodes;                 specifications.

ii) public transport;                   g) to incorporate –

iii) centres;                           i) kerb ramps at all intersections
                                        and designated crossings;
d) provide clear sight-lines for safe
use;                                    ii) refuge islands on all roads with



                                                                                                                 URBIS
APPENDICES                                                                                        NOOSA ENERGY CENTRE
Log in to download the original file

3. FINAL-160721-BA4090-Town Planning Report.pdf · 3.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.