Original source · versioned page text
3. FINAL-160721-BA4090-Town Planning Report
Attached to the e-mail MCU16/0084 & OPW16/0157 Development Application IDAS Forms, Planning report & Plans email 1 of 3.
Queensland (RPEQ) with specific
experience in establishing and
managing artificial waterways,
and
AO10.2
Monitoring and maintenance
programs adaptively manage
water quality in any non-tidal
artificial waterway to achieve
relevant water-quality objectives
downstream of the waterway,
and
AO10.3
Aquatic weeds are managed in
any non-tidal artificial waterway
to achieve a low percentage of
coverage of the water surface
area (less than 10%). Pests and
vectors (such as mosquitoes) are
managed through avoiding
stagnant water areas, providing
for native fish predators, and any
other best practices for
monitoring and treating pests,
and
AO10.4
Any non-tidal artificial waterway
is managed and operated by a
responsible entity under
agreement for the life of the
waterway. The responsible entity
is to implement a deed of
agreement for the management
and operation of the waterway
that:
a. identifies the waterway, and
b. states a period of responsibility
for the entity, and
c. states a process for any
transfer of responsibility for the
waterway, and
d. states required actions under
the agreement for monitoring the
URBIS
FINAL-160721-BA4090-TOWN PLANNING REPORT APPENDICES
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.