Attachment 1—Referral agency conditions
(The following conditions must be attached to any development approval relating to this application) (Copies of the
documents referenced below are found at Attachment 3)
No. Conditions Condition timing
Development permit for reconfiguring a lot for one lot into 8 lots
Schedule 10, Part 17, Division 3, Table 5, Item 1 (Planning Regulation 2017) - The chief executive
administering the Planning Act 2016 nominates the Director-General of the Department of Environment,
Science and Innovation to be the enforcement authority for the development to which this development
approval relates for the administration and enforcement of any matter relating to the following
condition(s):
1. The development must be carried out generally in accordance with Prior to submitting the
the following plan: Plan of Survey to the
(a) Overall Development Layout – 8 Lot Arrangement, prepared by local government for
Covey Associate Pty Ltd, dated 13.09.23, reference Project No. approval
202573 Sheet No. RL30, revision C.
2. For the proposed works, only use clean materials and ensure that the For the duration of the
words do not cause contamination. To achieve this: works
(a) Only use materials that are free from contaminants as defined
under section 11 of the Environmental Protection Act 1994.
3. Erosion and sediment control measures which are in accordance with For the duration of the
Best Practice Erosion and Sediment Control (BPESC) guidelines for works
Australia (prepared by the International Erosion Control Association), are
to be installed and maintained to prevent the release of sediment to tidal
waters.
4. Submit “As Constructed drawings” to [email protected] or mail to: Within two (2) weeks of
Department of Environment and Science the completion of the
Permit and License Management works
Implementation and Support Unit
GPO Box 2454
Brisbane Qld 4001.
5. (a) In the event that the works cause disturbance or oxidisation of acid (a) Upon disturbance
sulfate soil, the affected soil must be treated and thereafter or oxidisation until the
managed (until the affected soil has been neutralised or contained) affected soil has been
in accordance with the current Queensland Acid Sulfate Soil neutralised or contained
Technical Manual: Soil management guidelines, prepared by the
Department of Science, Information Technology, Innovation and the
Arts, 2014.
(b) Certification by an appropriately qualified person, confirming that the (b) At the time the soils
affected soil has been neutralised or contained, in accordance with have been neutralised or
(a) above is to be provided to [email protected] or mailed to: contained
Department of Environment and Science
Permit and License Management
Implementation and Support Unit
GPO Box 2454
Brisbane Qld 4001.
State Assessment and Referral Agency Page 2 of 5
14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.