Original source · versioned page text
Attachment A to Judgment for 19Aug 2024 (6)
Very large file (32.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Linke and Linke Surveys SLR Ref No: 620.31071-R01-v3.0-FEMP.docx Flood Emergency Management Plan February 2024 111 Lake Weyba Drive, Noosaville Term/Abbreviation Definition Flood Warning flood warning involves the timely collection, interpretation and dissemination of flood information before and during a flood event to enable the community to respond effectively to the flood threat. The BoM is responsible for collecting rainfall and stream flow data, operating flood prediction models and preparing and issuing flood warnings to the media, key agencies and other bodies for non-flash flooding situations. Councils are responsible for disseminating flood warnings to the local community, local authorities and other local bodies for flash flooding and non-flash flooding situations. Floodplain area of land adjacent to a creek, river, estuary, lake, dam or artificial channel which is subject to inundation by the Probable Maximum Flood (PMF). HAT Highest Astronomical Tide Likelihood of Flooding a quantitative or qualitative description of the likelihood that a specified event will occur. The likelihood of occurrence of flooding can be measured in terms of Annual Exceedance Probability (AEP) Minor, Moderate and BoM use the following definitions in flood warnings to give a general indication of the type of Major Flooding problems expected with a flood: • Minor Flooding: causes inconvenience such as closing of minor roads and the submergence of low level bridges. • Moderate Flooding: low-lying areas are inundated requiring removal of stock and/or evacuation of some houses. Main traffic bridges may be covered. • Major Flooding: extensive rural areas and/or appreciable urban areas are flooded, with properties and towns isolated. Peak Discharge (Flow) the maximum discharge occurring during a flood event. Probability a quantitative measure of the likelihood of occurrence of an event. It normally reflects the relative frequency of or expectation that an event will occur, and is usually expressed as a percentage, eg the probability of throwing a given number by rolling a dice is 1 in 6, or 16.7%. PMF Probable Maximum Flood – the largest flood that could conceivably occur at a particular location. This flood defines the maximum extent of land liable to flooding. The PMF event may form the basis of evacuation planning and the identification of refuge areas. PMP Probable Maximum Precipitation Recovery the assisting of people and communities affected by emergencies to achieve a proper and effective level of functioning. Response the combating of emergencies and the provision of rescue and immediate relief services. Risk the chance of something happening that will have an impact upon objectives. It is measured in terms of consequence and likelihood. Stormwater Runoff inundation by local runoff. Stormwater flooding can be caused by local runoff exceeding the capacity of an urban stormwater drainage system or by the backwater effects of mainstream flooding causing the urban stormwater drainage system to overflow. Waterway a river, creek, stream or watercourse that may permanently or sometimes flow throughout the year. Page 3 28
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.