Original source · versioned page text
Attachment A to Judgment for 19Aug 2024 (6)
Very large file (32.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Disclaimer
Notwithstanding the precautions adopted in this report, it should always be remembered that bushfires burn under a range
of conditions. An element of risk, no matter how small always remains, and although AS 3959-2018 is designed to improve
the performance of such buildings, there can be no guarantee, because of the variable nature of bushfires, that any building
will withstand bushfire attack on every occasion.
It should be noted that upon lodgement of a development proposal, State Government, council and/or the fire service may
recommend additional construction requirements.
Although every care has been taken in the preparation of this report, Land and Environment Consultants Pty Ltd accept no
responsibility resulting from the use of the information in this report.
V2
ft
ra
D
iii
57
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.