Original source · versioned page text
Attachment A to Judgment for 19Aug 2024 (6)
Very large file (32.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.
procedure in the Australian Standard (AS 3959-2018) Construction of buildings in bushfire prone
areas.
Aerial imagery of the site and measuring tools were accessed online from Google Earth and the
Queensland Globe to assist with validating observations and measurements made during the site
assessment.
1.2 Suitably qualified person
This BMP was prepared by Robert Janssen who is a suitably qualified and experienced bushfire
management consultant.
Robert is the managing principal at LEC and has over 25 years of experience in bushfire planning and
operations. He has prepared BMPs for residential, commercial and industrial property developments,
utilities, government facilities and conservation estates.
Robert’s formal qualifications as an environmental scientist and consulting experience are coupled
with 10 years of experience as a nationally accredited fire-fighter with the national parks and wildlife
service in New South Wales and Queensland.
V2
ft
ra
D
2
59
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.