Original source · versioned page text
Attachment A to Judgment for 19Aug 2024 (6)
Very large file (32.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Photograph 3.1 VHC 16.1 Photograph 3.2 VHC 22.1
V2
Photograph 3.3 VHC 28.2 Photograph 3.4 VHC 41.4
ft
ra
D
Photograph 3.5 VHC 42.6
3.4 Small patch and narrow corridor mapping rules
The small patch of VHC 16.1 rehabilitation at assessment reference point L, shown in Figure 2.1, and
the narrow corridors of VHC 28.2 at assessment reference points C and F, were assessed against the
small patch and narrow corridor mapping rules in Section 4.2.6 of Bushfire resilient communities which
‘reflect the likelihood of lower fireline intensities in smaller vegetation patches and narrow vegetation
corridors’.
The small patch of VHC 16.1 rehabilitation at assessment reference point L is much less than
0.5 hectares, ie it is 378 m2, and will adjoin developed and maintained land, ie VHC 42.6, which is
defined in Bushfire resilient communities as having discontinuous bushfire fuels and as being a low
8
65
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.