Original source · versioned page text
Attachment A to Judgment for 19Aug 2024 (6)
Very large file (32.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.
88 [OCR of page images] PERFORMANCE CRITERIA Performance criteria have been set to provide easily identifiable and quantitative indicators of revegetation progression. Table 3 identifies the performance criteria to be used to assess the success of the rehabilitation works. These performance criteria must be met for the works to be considered successful and demonstrate compliance with this Rehabilitation Plan. The rehabilitation works are to be assessed against these Performance Criteria to ensure compliance with this Rehabilitation Plan. Certification is to be issued to Council at the completion of works to demonstrate that the rehabilitation works have achieved the nominated Performance Criteria. Under the Biosecurity Act 2014 the landowner is responsible for biosecurity matters on their land. TABLE 3 - PERFORMANCE CRITERIA Weed All weeds are treated at least once prior to site planting. management No live woody weeds present in the canopy & mid-canopy at the end of the on-maintenance period. No evidence of exotic pasture grass is present. <5% coverage in the understorey of invasive plant species listed under the Planning Scheme Policy 2 Landscaping and Council's Biosecurity Plan 2020 pest plants listed in Schedule 1 part 3, Schedule 2 and Non-scheduled invasive species. Weed management to maintain a weed free zone around each planted tubestock. 3 Monthly (or as required) weed maintenance within the vegetation protection covenant areas. Mulch replenishment when required. Tubestock are watered when required. a. Year One — 12 months after installation: |. Planted trees have achieved an average height of 1m. ii. Planted shrubs have achieved an average height of 0.4m. b. Year Two - 24 months after the installation: i. Planted trees have achieved an average height of 2m. ii. Planted shrubs have achieved an average height of 1m. iii. Canopy and / or vegetative strata must not be devoid for any area greater than 1.0m? within any 10m? sample. iv. Plant density shading out and/or self-mulching. v. Installation of understorey plants must have occurred to enable at least 6 months growth prior to off maintenance acceptance. d. The duration of the establishment period: i. Adherence to maintenance regime for rehabilitation and revegetation areas. ii. No evidence of woody weeds reshooting from stumps, poisoned trees or the regrowth of cut stumps. iii. No evidence of over-weeding or impact on non-target species. iv. Signs of indigenous recruitment in rehabilitation areas. v. Weed infestations less than 5% of the rehabilitation areas. vi. Any failed plants within the previous 12-month period have been replaced. Replacement plantings must be established at least 6 months and achieve a minimum height of 1m prior to off maintenance being granted. vii. Healthy and vigorous growth allowed to grow to full form. viii. Mulch layer sufficient to suppress weeds. Ecological The following activities must not be carried out within the covenant Preservation area: a. clearing, cutting down, poisoning, lopping or pruning of native vegetation, which is indigenous to, or planted within, the zone b. soil/spoil dumping and/or compacting c. soil excavation, other than for planting indigenous native plants or for works which are a natural consequence of this approval. Environmental Management Consultants PROJECT TITLE PO Box 385 Peregian Beach QLD 4573 d. grazing by any non-native animals. e. removal of natural surface cover litter such as logs, branches, twigs, leaves and rocks. The following exceptions apply: i. declared plants under the Biosecurity Act 2014, and any Council Listed Environmental Weeds, Undesirable species, Exotic Grasses and other plants identified in writing by Council. ii. indigenous native trees which pose a well-founded threat to persons or property as approved in writing by Council iii. controlled bushfire burns to maintain ecological processes subject to submission of a Bushfire Management Plan and agreed in writing by Council. Existing Track The existing track as shown on the Plan of Development (refer RPO1) and on Plates A & B (refer RPO2 & RP03) has been defined and formed to allow unimpeded vehicular access throughout the mapped alignment. No plantings have occurred within the track alignment. Additional Removal of any structures, debris or materials foreign to a natural environment within the Rehabilitation Areas. CONTRACTOR NOTES: BUSHLAND & WETLAND REHABILITATION PLAN (BWRP)]| LINKE AND LINKE SURVEYS Aaneoocasse* 1111 LAKE WEYBA DRIVE, NOOSAVILLE QLD fannie CONTRACTOR NOTES: NORTH: UPDAILD 7 PRLLMINARY ISSUF DFTANS: PERFORMANCE CRITERIA J001263 RPOG 2 (88.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.