Materials and Finishes Schedule
1. General Notes 1. General Notes 2. Notes to External Windows and 2. Notes to External Windows and BALUSTRADES DOWN PIPES
Doors Doors
1.01 All shall be in accordance with the 1.11 All elements specified to be BAL-02 Glass Balustrade DP-1 90mm Diameter Down Pipes
accompanying drawings and to the painted or powdercoated are to be 2.05 All dimensions ot be be checked on 2.12 Fall protection: where window or
satisfaction of the Architect. in accordance with Architect’s final site prior to manufacturing. door openings are on a floor more Frameless glass balustrade Colorbond downpipe 0.48mm
colour scheme. than 2000mm above the adjacent panels. Rebated glazing basemetal thickness (BMT)
1.02 Refer any discrepancies to the Contractor to provide Architect 14 2.06 Window & door sizes are nominal. surface below, and the lowest channel or grout fixed
Architect for written instruction. days notice before the final Contractor to ensure windows and openable portion of the window or connections to be confirmed by Colour:TBC
selections are required. doors are fabricated to match door is less than 1700mm above contractor. Allow for minimal
1.03 All work and materials shall be in constructed framing / surround
accordance with the Building Code that floor, the window or door shall aluminium channel fixed to
For site painting generally apply 2 dimensions and allow for packing be protected in accordance with glass in lieu of handrail. FLOORS
of Australia, the relevant Australian out of walls to accommodate door /
Standards, the applicable codes finishing coats over recommended BCA 3.9.2.5 Prevention of Falls. FLF-01 Stone tile on new concrete
undercoat following appropriate window frame depths. Minimum height: 1200mm
and regulations of the destination 2.13 Insect / fire screens shall be slab
country and local council’s priming of surface. above finished floor level.
All door sills to be set down where “Crimsafe” woven stainless steel,
requirements. Any discrepancy or 1.12 All exposed fixings, plates, screws, possible (unless noted otherwise). unless noted otheriwse. Concrete slab as per Engineers
ambiguity shall be referred to the Powder coated aluminium Drawings and specifications.
nails and the like to be 316 grade Builder to allow for set down to channel.
Architect for written direction. stainless steel where appropriate or concrete slabs where possible to 2.14 Door and window hardware shall be
unless otherwise noted. Structural ensure all doors opening onto as noted within the Door and Tile: T-1
1.04 Any proposed changes to Window Schedule Finish: Powdercoat
materials, finishes, colours etc from connections shall be as Engineer’s external spaces finish flush with Colour: Duratec Dulux Zeus FLF-02 Steel troweled concrete
those specified must be approved Drawings. Use dome head or internal finished floor level. Black
by the Architect PRIOR to ordering. countersunk fixings (as 2.15 All external windows and doors are Structural slab as Engineers
appropriate) wherever possible. Note: Scheduled door heights do to be keyed alike with the entry Glass to comply with AS 1288 Drawings laid to falls as
1.05 The Client recognises that Ensure separation of different not allow for set downs. door. and relevant wind loading; indicated.
unauthorised changes to the metals via rubber, neoprene Glass colour: clear
project are not the responsibility of gaskets, sleeves and/or silicon 2.07 Contractor to ensure that all
BALUSTRADES Colour: Natural grey with
the Architect and releases the joins. window & door head heights are at
a single RL datum across the entire CEILINGS standard aggregate.
Architect from any liability arising BAL-01 Aluminium Balustrade
from the construction, use or result 1.13 If in doubt please ask! building, unless noted otherwise . CLG-1 Flush Plasterboard Ceiling
Notify Architect if this requires any Finish: Steel troweled - Water
of such changes. Fabricated aluminium
2. Notes to External Windows and full height doors or windows to be and UV resistant clear matt
balustrade in accordance with PB-3 on battens direct to
1.05 All work referred to in this schedule Doors non-typical height penetrating sealer to
Architects Drawings. underside timber framing above.
is by Builder, unless noted manufacturers specifications.
2.01 Door and Window Schedule shall 2.08 Glazing types and thickness are all Flush join sheets throughout.
otherwise. Work noted by “Joiner” All connections to be fully Square set perimeter throughout. FLF-5 Exposed aggregate concrete
or other specialist contractor is to be read in conjunction with to comply with AS 1288.
Architectural Drawings. Any welded. Pin fixed connections
be attended upon by the Builder. Generally to be “Veridian” ‘Comfort
variations from this schedule must to footing below as required. All Finish: PT-4 Structural slab as Engineers
Plus’ in colour “Clear” unless noted
1.07 No material, finish or item used in be notified to the Architect prior to fixings to be 316 stainless steel. Drawings laid to falls as
otherwise. CLG-2 Suspended plasterboard
the project may include any ordering Where safety markings are required, indicated.
Details to be discussed with ceiling Colour: Natural grey with
asbestos or hazardous or toxic provide surface transfers only in
2.02 All doors and windows shall be architect prior to manufacturer. standard aggregate.
substances or materials. accordance with the Standard. PB-4 screwed up to suspended
fabricated to suit the required Wind
Loading and Impact loading where Generally avoid safety markings. metal battens on hanging grid
1.08 All materials, adhesives, applied Finish: Powdercoat Finish: Exposed - Water and UV
finishes and other chemical based required. Colour: Duratec Dulux Zeus suspended from framing above. resistant clear matt penetrating
2.09 Louvres generally shall be
products such as paint systems Black Flush join sheets throughout. sealer to manufacturers
“Breezeway Altair” with
2.03 Aluminium window and door joinery Square set perimeter throughout.
should be “0 VOC” unless “Stronghold’ system unless noted specifications.
shall be commercial /architectural TO COMPLY WITH
otherwise approved by Architect. otherwise.
series sections; narrowest possible QUEENSLAND POOL SAFETY Finish: PT-4 FLF-6 Driveway
1.09 All materials and products profile to be used. Proposed series CODE
to be approved by Architect prior to Blades shall generally be 152 wide CLG-3 Exposed Concrete
incorporated into the works shall where possible; 102 where fall Structural slab as Engineers
be fit for purpose and installed in in ordering. Drawings laid to falls as
protection is required. Refer Underside of Class 2 slab above.
accordance with manufacturers Materials Schedule for blade types. required.
instructions to comply with Finsh: shall powdercoat, unless Off-form finish, smooth face
warranty obligations. Copies of all noted otherwise. Powdercoating formwork. Square edges with no Colour: TBC
2.10 All fixings of windows and doors to
relevant warranties shall be shall be “Interpon D2015” series fillets. V drip groove to all
be 316 grade stainless steel.
supplied to all contracting parties. applied by an authorised external soffit edges. Reinforcing Finish: Exposed - Water and UV
fabricatotor. Colour shall be as 2.11 Stacking doors to stack so that they as per engineers specifications. resistant clear matt penetrating
1.10 All timber, including bamboo, must Architect’s material reference. are flush with the jamb when open, sealer to manufacturers
be FSC (Forest Stewardship offering full egress opening. Finish: Water and UV resistant specifications.
Council) Certified or recycled. 2.04 ALL WINDOW AND DOOR DETAILS clear matt penetrating sealer to
Rainforest timbers are not to be ARE TO BE CONFIRMED WITH manufacturers specifications.
used. Copper Chrome Arsenic NOMINATED SUBCONTRACTOR
(CCA) treated timber is not to be PRIOR TO DESIGN FABRICATION.
used. Advise Architect if a non-typical
section is required for any particular
item.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
180078 - Resort Entry Drawing.pdfRelated documentApplication case desk ↗
About this file
- File size
- 29.7 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.