Response to Information Request 5-7 Rufous Street Peregian Beach - Attachment E MCU13/0092
Very large file (16.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.
MOVEMENT SUMMARY
V Site: 2015 PM Pre Development
12-060 Peregian Beach SC
David Low Way I Woodland Drive
2015 PM Pre Development
Giveway I Yield (Two-Way)
Movement Performance -
Vehicles
Mov ~
.
00 Demand Flows,’: fe’" Deg.".~’ Average;~ Lev l of ~" 95% Back of.Oue e ."
.
,.
Prop:
f
.Effective ";.’Average’
p
.
10 Mov’ Total HV:,’, ; Satn’~!t, Delay:, :’. Service~ ,... Vehicles’; ’Distance :Oueued ’~. Stop Rate /,,’ Speed,’-
0/0 ~1 ~.~ /;;Jv/c ~f: ~(~l ,~~4~...,v h~~~.i~ l~~’\’ m ~~1r .jl\~~::./):::;,.- er veh ’;{ km/t
-
J
.1"
.
: ~
.
veh/h ,i#( see ," ~’" #, ~
’" ,.~t
~
South: David Low Way -
South
1 L2 35 3.0 0.339 0.6 LOSA 0.1 0.5 0.00 0.07 59.1
2 T1 611 3.0 0.339 0.6 LOSA 0.1 0.5 0.00 0.07 59.1
3u U 17 3.0 0.017 13.2 LOS B 0.1 0.5 0.51 0.71 44.6
Approach 664 3.0 0.339 0.9 NA 0.1 0.5 0.01 0.09 58.7
North: David Low Way -
North
8 T1 532 3.0 0.278 0.0 LOS A 0.1 0.7 0.00 0.00 59.9
9 R2 21 3.0 0.026 12.6 LOS B 0.1 0.7 0.57 0.74 45.1
9u U 1 3.0 0.026 12.6 LOS B 0.1 0.7 0.57 0.74 45.1
Approach 554 3.0 0.278 0.5 NA 0.1 0.7 0.02 0.03 59.2
West: Woodland Drive -
West
10 L2 17 3.0 0.159 21.0 LOS C 0.5 3.9 0.78 0.90 38.7
12 R2 30 3.0 0.159 21.0 LOSC 0.5 3.9 0.78 0.90 38.7
Approach 47 3.0 0.159 21.0 LOSC 0.5 3.9 0.78 0.90 38.7
All Vehicles 1265 3.0 0.339 1.5 NA 0.5 3.9 0.05 0.09 57.8
Level of Service (LOS)Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Ak lik M3D).
HV (%)values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Processed: Tuesday, 23 July 2013 2:52:15 PM Copyright @ 2000-2013 Akcelik and Associates Ply Ltd
SIDRA INTERSECTION 6.0.9.3896 www.sidrasolutions.com SIDRA
Project: P:\2011-12112-060 Peregian Beach SCICalcslSIDRAIRevised SIDRAIDavid Low Way -
Woodland Dr.sip6 INTERSECTION 6
8000122, ADAM PEKOL CONSULTING, PLUS / 1 PC
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request 5-7 Rufous Street Peregian Beach - Attachment E MCU13/0092Related documentApplication case desk ↗
About this file
- File size
- 16.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.