Response to Information Request 5-7 Rufous Street Peregian Beach - Attachment E MCU13/0092
Very large file (16.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.
MOVEMENT SUMMARY
\l Site: 2015 PM Post Development
12-060 Peregian Beach SC
David Low Way / Woodland Drive
2015 PM Post Development
Giveway / Yield (Two-Way)
Movement Performance - Vehicles
"
Mov ",:~ 00 :~,’1’1- Demand Flows "’;;;J~.J ’Deg.~,: ’rAverage.", Level of 95% Bac;:k of Queue. ’’’t.~’’::~di’rop.
Effective, Average
,Iqt’ ,’,::fI(1oy; <", Total, ,~ ".~V ":~.; ~ ~~trL". .~Delay
"
Service:: ,/ ’te~icJes.’;.1’Di~tance:i ’~g~.eyed’ ~top Rate Speed
<hr,
1
~Y0t v’;~veh/h r%1.’~
. "
V~’" olo~ "\V’~i r’r vIe, .. ~ ~;" J see:ff
\ +
f"i4!AtY.,j-’ W’.*Jr~:4~’ ; ~ .
11" ’t ," ,,’
veh mil:"" ,,:’,,’"~ ,V\ (."’’’ er veh km/h
South: David Low Way South -
1 L2 98 3.0 0.368 1.3 LOSA 0.1 0.5 0.00 0.17 58.0
2 T1 601 3.0 0.368 1.3 LOSA 0.1 0.5 0.00 0.17 58.0
3u U 17 3.0 0.016 13.2 LOS B 0.1 0.5 0.51 0.71 44.7
Approach 716 3.0 0.368 1.6 NA 0.1 0.5 0.01 0.18 57.6
North: David Low Way -
North
8 T1 523 3.0 0.273 0.0 LOSA 0.4 2.8 0.00 0.00 59.9
9 R2 77 3.0 0.099 13.0 LOS B 0.4 2.8 0.60 0.83 44.7
9u U 1 3.0 0.099 13.0 LOS B 0.4 2.8 0.60 0.83 44.7
Approach 601 3.0 0.273 1.7 NA 0.4 2.8 0.08 0.11 57.4
West: Woodland Drive -
West
10 L2 79 3.0 0.115 14.5 LOS B 0.6 4.1 0.70 0.83 43.5
12 R2 88 3.0 0.437 32.5 LOS D 1.6 11.7 0.90 1.02 32.4
Approach 167 3.0 0.437 24.0 LOSC 1.6 11.7 0.80 0.93 36.9
All Vehicles 1483 3.0 0.437 4.2 NA 1.6 11.7 0.13 0.23 54.1
Level of Service (LOS)Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a
good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model is used. Control Delay includes Geometric Delay.
Gap-Acceptance Capacity: SIDRA Standard (Ak elik M3D).
HV (%)values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.
Processed: Thursday, 25 July 2013 1 :56:19 PM Copyright@ 2000-2013 Akcelik and Associates Pty lid
SIDRA INTERSECTION 6.0.9.3896 www.sidrasolutions.com SIDRA
Project: P:\2011-12112-060 Peregian Beach SCICalcslSIDRAIRevised SIDRAIDavid Low Way -
Woodland Dr.sip6 INTERSECTION 6
8000122,ADAM PEKOL CONSULTING, PLUS /1 PC
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request 5-7 Rufous Street Peregian Beach - Attachment E MCU13/0092Related documentApplication case desk ↗
About this file
- File size
- 16.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.