Energex Advisory Response to Changed Application - MCU12/0208
2
Note: The easement conditions relevant to Easement B on RP177295 and C on
’(
RP177294 continue to remain relevant to the respective landholdings, Where the level
of assessment continues to allow for uses either as exempt or self-assessable
development compliance against the easement conditions will continue to be required,
In such regard approval against the conditions of the easement will be required to be
sought from Energex,
Appendix A of this response identifies the respective ’level of assessment’ conflicts with
the easement conditions.
3. No structures are to be erected within Easement B on RP177295 and C on
RP177294
4. Natural ground levels on the easements are not to be disturbed without
Energex approval. Detailed civil design drawings showing any proposed cut and
fill levels on the easement and the location of the Energex assets in relation to
the proposed development must be approved by Energex before any works can
commence on site.
5. No detention, bio-detention or stormwater management devices (inclusive of
swales) are to be located within the Easement B on RP177295 and C on
RP177294.
6. Stormwater management principles carried out as part of the development are
to ensure a no worsening affect is ensured to Easement B on RP177295 and C
on RP177294
7. The placement of services i.e. water, sewerage or stormwater within either
Easement B on RP177295 or Con RP177294 is not approved. The location of
services within the easements is to subject to further detailed assessment as
part of a future operational works application.
8. Flooding impacts on Easement B on RP177295 and or C on RP177294, as a
result of the proposed works, are not to be worsened,
Note: Easement B on RP177295 and C on RP177294 contain overhead 132kV
electricity infrastructure. This corridor is of primary importance to the supply network
and provides a strategic link between Energex’s Sunrise, Noosaville and Tewantin
Substations. This infrastructure will continue represent an important component of the
network to cater for the growth needs of the region.
Should you require any further information on the above matter, please contact
Tom Sexton on (07)3664 5766.
Yours faithfully,
~~
Tom Sexton
Town Planner
Property Services
Energex Limited
Reference: HBD 3714389 297080
Did you know Energex has a referral website?
http://www.energex.com.au/bu ildi ng-and-mai ntaining-the-network/referral-ag ency
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Energex Advisory Response to Changed Application - MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 3.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.