                       MINUTES


         General Committee
              Meeting


                Monday, 16 May 2022

                                10am
         Council Chambers, 9 Pelican Street, Tewantin



Committee:   Crs Frank Wilkie (Chair), Karen Finzel, Joe Jurisevic, Amelia
             Lorentson, Clare Stewart, Brian Stockwell, Tom Wegener



                    “Noosa Shire – different by nature”
Log in to download the original file

2022-05-16 General Committee Meeting Minutes(PDF, 467KB).pdf · 478 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 14 sections

Section 2

GENERAL COMMITTEE MEETING MINUTES                                         16 MAY 2022



1.   ATTENDANCE & APOLOGIES

     Cr Frank Wilkie (Chair)
     Cr Karen Finzel
     Cr Joe Jurisevic
     Cr Amelia Lorentson
     Cr Clare Stewart
     Cr Brian Stockwell
     Cr Tom Wegener

     EXECUTIVE
     S Waters Chief Executive Officer
     T Grauf, Acting Director Corporate Services
     K Rawlings, Director Environment and Sustainable Development
     D Iezzi, Director Executive Services

     APOLOGIES
     Nil.




     The meeting commenced at 10.00am.




2.   CONFIRMATION OF MINUTES
     Committee Resolution
     Moved:           Cr Lorentson
     Seconded:        Cr Finzel
     The Minutes of the General Committee Meeting held on 19 April 2022 be received and
     confirmed.
                                                                   Carried unanimously.




3.   PRESENTATIONS

     Nil.




4.   DEPUTATIONS

     Nil.



                                                                           Page 2 of 15

Section 3

GENERAL COMMITTEE MEETING MINUTES                                                              16 MAY 2022


5.   ITEMS REFERRED FROM COMMITTEES


PLANNING & ENVIRONMENT COMMITTEE


1    ECONOMIC DEVELOPMENT GRANT PROGRAM APPLICATION BY NOOSA CHAMBER
     OF COMMERCE & INDUSTRY INC.
     In accordance with Chapter 5B of the Local Government Act 2009, Cr Finzel provided the following
     declaration to the meeting of a prescribed conflict of interest in this matter:
     I, Cr Finzel, inform the meeting that I have a prescribed conflict of interest in this matter. In March
     2020, Ms Pamela Sweetapple who is the Secretary of the Noosa Chamber of Commerce donated
     $2630.33 to my 2020 Election Campaign where I was one of three candidates that ran as a group
     known as 'Future Noosa' (which is no longer an entity). As a result of my prescribed conflict of interest,
     I will leave the meeting room while the matter is considered and voted on.
     Cr Finzel left the meeting.

     Motion
     Moved:            Cr Wilkie
     Seconded:         Cr Wegener
     That Council note the report by the Project Officer, Economic Development, to the Planning
     & Environment Committee Meeting dated 10 May 2022 and approve the Noosa Chamber of
     Commerce & Industry Inc. application to the Economic Development Grants Program in the
     amount of $7,500 as follows: 30,000, to be paid in two instalments, with the following
     conditions:
     A.    $7,500 initial payment to be made to provide support to the Chamber to prepare:
           1.     Defined project plans that provide the pathway from objectives to outcomes;
           2.     KPI’s including membership and funding targets;
           3.     Removal of potential duplication with existing projects; and
           4.     An updated grant application with the above supporting information; and
     B.    Request a report to a future Council Meeting on the assessment of the updated
           application.
     A.    Payment 1 (June 2022) - $15,000 Paid upon agreement with the Chamber on:
           1.     Defined project plans that provide the pathway from objectives to outcomes;
           2.     KPI’s including membership and funding targets;
           3.     Removal of potential duplication with existing projects;
     B.    Payment 2 (October 2022) - $15,000 upon presentation of a Progress Report including
           1.     KPI’s as agreed;
           2.     Outcomes achieved to date and how this translates to community benefit;
           3.     Copies of Minutes of the Chamber Committee Meeting to ensure governance
                  and Committee management in order;
     C.    Monthly Progress meetings with Chamber representatives and Economic
           Development staff in the first six months of the project, and then quarterly for the
           remainder of the grant program.



                                                                                               Page 3 of 15

Section 4

GENERAL COMMITTEE MEETING MINUTES                                                    16 MAY 2022


    Amendment No.1
    Moved:            Cr Jurisevic
    Seconded:         Cr Stockwell
    That Item A, 5 be added to read:
    5.    Grant approval to include the proper disclosure of all funds to align with all other
          recipients of Noosa Shire Council Grant Funding at each stage.
                                                                       Carried unanimously.
    Amendment No.2
    Moved:            Cr Stockwell
    Seconded:         Cr Jurisevic
    That Item 4 be amended to read:
    4.    An updated grant application with the above supporting information and a strong focus
          on deliverables aligned with Pillars 2 and 5 of the Roadmap and Strategic Plan; and
                                                                        Carried unanimously.

    Motion
    Moved:            Cr Wilkie
    Seconded:         Cr Wegener
    That Council note the report by the Project Officer, Economic Development, to the Planning
    & Environment Committee Meeting dated 10 May 2022 and approve the Noosa Chamber of
    Commerce & Industry Inc. application to the Economic Development Grants Program in the
    amount of $7,500 as follows:
    A.    $7,500 initial payment to be made to provide support to the Chamber to prepare:
          1.    Defined project plans that provide the pathway from objectives to outcomes;
          2.    KPI’s including membership and funding targets;
          3.    Removal of potential duplication with existing projects; and
          4.    An updated grant application with the above supporting information and a strong
                focus on deliverables aligned with Pillars 2 and 5 of the Roadmap and Strategic
                Plan; and
          5.    Grant approval to include the proper disclosure of all funds to align with all other
                recipients of Noosa Shire Council Grant Funding at each stage
    B.    Request a report to a future Council Meeting on the assessment of the updated
          application.

    Procedural Motion
    Moved:             Cr Lorentson
    Seconded:          Cr Stewart
    That the matter lay on the table until the Ordinary Meeting dated 19 May 2022.
                                                                         Carried unanimously.
    Cr Finzel returned to the meeting.




                                                                                      Page 4 of 15

Section 5

GENERAL COMMITTEE MEETING MINUTES                                                           16 MAY 2022


2    NOOSA THREATENED FAUNA SPECIES RECOVERY ROAD MAP
     Committee Recommendation
     Moved:            Cr Jurisevic
     Seconded:         Cr Lorentson
     That Council note the report by the Fauna Management Project Officer to the Planning &
     Environment Committee Meeting dated 10 May 2022 regarding the Draft Fauna Threatened
     Species Road Map developed by the Fauna Management Project Officer and note that
     A.    The Road Map will be subject to an ongoing consultation program prior to finalisation;
     B.    Deliverables of the Road Map will be subject to future funding requests under Council’s
           commitment to ‘significant implementation’ of the Noosa Environment Strategy by
           2023.
                                                                            Carried unanimously.


SERVICES & ORGANISATION COMMITTEE

3    3D HAZARD MAPPING TOOL – APPOINTMENT OF SIMTABLE™
     Committee Recommendation
     Moved:            Cr Wilkie
     Seconded:         Cr Stockwell
     That Council note the report by the Disaster Management Officer to the Services and
     Organisation Committee Meeting dated 10 May 2022 and agree to enter into a medium
     sized* contractual arrangement with Simtable™ for the provision of a 3D hazard simulation
     tool for a trial period of two (2) years, in accordance with section 235 (a) of the Local
     Government Regulation 2012. At the end of the 2 year trial, officers will assess the merits of
     the 3D Hazard Mapping Tool in supporting disaster management activities and whether to
     continue using it long term. Funding of ongoing costs will then be considered through future
     budget processes to determine whether general revenue, grants or other funding is applied.
     *medium sized contractual arrangements are valued between $15,000 and $200,000, exc. GST
                                                                                  Carried unanimously.

The meeting adjourned at 11.24am.
The meeting resumed at 11.32am.


6.   REPORTS DIRECT TO GENERAL COMMITTEE


4    NOOSA DRIVE PATHWAY PROJECT REFERENCE GROUP - APPOINTMENT OF
     COUNCILLORS TO REFERENCE GROUP
     Committee Recommendation
     Moved:            Cr Stockwell
     Seconded:         Cr Stewart
     That Council note the report by the Infrastructure Planning, Design and Delivery Manager to
     the General Committee Meeting dated 16 May 2022 regarding the establishment of the
     Noosa Drive Pathway Project Reference Group and appoint Councillor Wilkie as Chair and
     Councillor Lorentson as a member of the Group.
                                                                          Carried unanimously.

                                                                                                Page 5 of 15

Section 6

GENERAL COMMITTEE MEETING MINUTES                                                             16 MAY 2022


5   2122Q125 – CONTRACT FOR PROJECT MANAGMENT SERVICES FOR 2022 FLOOD
    RECOVERY AND RECONSTRUCTION
    Committee Recommendation
    Moved:            Cr Stewart
    Seconded:         Cr Wilkie
    That Council note the report by the Disaster Reconstruction Coordinator to the General
    Committee Meeting dated 16 May 2022 and award Contract number 2122Q125 to Erscon
    Engineering Consultants (Erscon), under Section 234 – Exception for LGA arrangement, of
    the Local Government Regulation 2012, to provide Project Management Services to lead the
    Disaster Recovery Funding Arrangements (DRFA) activities as per the guidelines outlined
    by the Queensland Reconstruction Authority (QRA), for a term of 27 Months to the
    (maximum) value of $2,100,000.00 GST exclusive as follows:
    A.    $2,000,000 for Project Management services that will exist until the DRFA acquittal
          date of September 30, 2024. These costs will be recoverable under the guidelines of
          the DRFA so Council will not have to fund this cost; and
    B.    $100,000 for submission administration that will exist until the DRFA acquittal date of
          September 30, 2024. These costs are not recoverable under the guidelines of the
          DRFA and will need funding by Council. It is proposed that the Disaster Management
          Reserve restricted cash be used to fund this activity.
                                                                           Carried unanimously.



6   MCU21/0151 – APPLICATION FOR MATERIAL CHANGE OF USE                                                     –
    TELECOMMUNICATIONS FACILITY SITUATED AT 25 RAILWAY PDE, POMONA
    In accordance with Chapter 5B of the Local Government Act 2009, Cr Finzel provided the following
    declaration to the meeting of a declarable conflict of interest in this matter:
    I, Cr Wegener, inform the meeting that I have a declarable conflict of interest in this matter as I have
    an NBN tower located on my property and receive income from NBN via a lease arrangement. It could
    be viewed that I have an interest in mobile phone networks and NBN towers however as the
    application is by Telstra and it does not indicate NBN or Optus infrastructure I do not believe a
    reasonable person could believe I have a perception of bias. Therefore, I will choose to remain in the
    meeting room. However, I will respect the decision of the meeting on whether I can remain and
    participate in the decision.
    Committee Resolution
    Moved:            Cr Stewart
    Seconded:         Cr Stockwell
    That Council note the declarable conflict of interest by Cr Wegener and determine that it is in the public
    interest that Cr Wegener participates and votes on this matter because Council believes that Cr
    Wegener does not stand to receive a personal benefit or loss in relation to this matter and therefore a
    reasonable person would trust that the final decision is made in the public interest.
                                                                                    Carried unanimously.
    Cr Wegener did not vote on the above motion.
    Committee Recommendation
    Moved:              Cr Stockwell
    Seconded:           Cr Wilkie
    That Council note the report by the Development Planner to the General Committee Meeting
    dated 16 May 2022 regarding Application No. MCU21/0151 for a Development Permit for
    Material Change of Use - Telecommunications Facility situated at 25 Railway Pde Pomona
    and:

                                                                                              Page 6 of 15

Section 7

GENERAL COMMITTEE MEETING MINUTES                                                      16 MAY 2022


    A.   Approve the application in accordance with the following conditions:
         When Conditions Must Be Complied With
         1.      Unless otherwise stated, all works required by the conditions of this Decision
                 Notice must be completed prior to the use commencing, and then compliance
                 maintained at all times while the use continues.
         Approved Plans
         2.      Development undertaken in accordance with this approval must generally comply
                 with the approved plans of development. The approved plans are listed in the
                 following table unless otherwise amended by these conditions.

              Plan No.     Sheet    Plan/Document Name                                   Date
                           No.
              QC100259     S0       Site specific notes, prepared by Telstra             18.06.2021
              QC100259     S1       Site Layout and Access, prepared by Telstra          18.06.2021
              QC100259     S1-1     Site Layout, prepared by Telstra                     18.06.2021
              QC100259     S1-2     Site Setout Plan – Option 1, prepared by Telstra     18.06.2021
              QC100259     S3       East Elevation, prepared by Telstra                  18.06.2021
              QC100259     G4       Site Earthing – Option 1, prepared by Telstra        18.06.2021
              QC100259     G4-1     Earthing Scenario 3, prepared by Telstra             18.06.2021
              QC100259     G4-4     Trench Details, prepared by Telstra                  18.06.2021
              QC100259     E2       AC Power Connection, prepared by Telstra             18.06.2021
              QC100259     T2       Concrete Foundation Details, prepared by Telstra     18.06.2021
              QC100259     T2-1     Equipment Platform – H Frame Detail, prepared by     18.06.2021
                                    Telstra
              QC100259     T8       Compound Fence and Gate Details, prepared by         18.06.2021
                                    Telstra (as annotated by Council)
              501-PL       A        Landscape Concept Plan, prepared by Urbis            21.12.2021
         Nature and Extent of Approved Use
         3.      The maximum height of the satellite dish must not exceed the maximum height
                 as reflected in the approved plans with respect with the finished ground level and
                 the natural ground level.
         4.      No lights are permitted to be attached to the telecommunications facility, except
                 where required for hazard lighting purposes or similar.
         Currency Period
         5.      The Currency Period for this development approval lapses if the use has not
                 happened by 19 May 2028, unless an application to extend the currency period
                 is approved by Council.
         Health and Safety
         6.      The development must not, at any time during the life of the development, result
                 in human exposure to environmental electromagnetic emissions exceeding the
                 current regulations, standards and/or recommendations of the Australian
                 Radiation Protection and Nuclear Safety Agency (ARPANSA). The carrier of the
                 infrastructure must provide, at any time upon request by Council, written
                 certification to demonstrate compliance with this condition. The written
                 certification must assume:

                                                                                       Page 7 of 15

Section 8

GENERAL COMMITTEE MEETING MINUTES                                                 16 MAY 2022


              a.   a maximum number of users over the lifetime of the structure;
              b.   full power usage;
              c.   a maximum down tilt of antennae.
        Colours and Finishes
        7.    The development must be finished in pale eucalypt or the like in order to visually
              blend into the landscape.
        8.    Associated fencing (and gate) as shown on the approved plans must be visually
              unobtrusive and must be camouflaged through the use of colours, materials and
              screening vegetation to blend the fence into the visual landscape.
        Site maintenance
        9.    The site must be kept tidy and well maintained at all times for the life of the
              development.
        Cessation of Use
        10.   The facility must be removed from the site upon cessation of the use.
        Noise
        11.   Written certification is required from a suitably qualified person confirming that
              sound pressure levels from all mechanical plant and equipment comply with the
              following:
              a.   Air-conditioning and equipment
                        7am to 10pm: Maximum level allowable = background + 5dB(A)
                        10pm to 7am: Maximum level allowable = background + 3dB(A)
        12.   The certification must be submitted to Council, which certifies that operational
              noise from any fixed plant and equipment complies with the requirements of this
              Decision Notice.
        Vegetation Retention
        13.   Existing trees on the site must be retained, except where required to be removed
              to accommodate the approved use.
        14.   Existing vegetation in the road reserve must be retained, unless written
              authorisation from Council is granted for the clearing.
        Landscaping Works
        15.   The development site must be landscaped generally in accordance with the
              approved plans and include additional landscaping to enhance the amenity of the
              site. The works must be undertaken in accordance with an Operational Works
              approval and the Noosa Plan and Planning Scheme Policy PSP2 - Landscaping
              for the Pomona area and must include in particular:
              a.   the works shown on the approved Landscape Concept Plan, and in addition
                   include the following:
                   i.    1 x 45L pot size street tree per 8m of road frontage (minimum 7
                         trees); and
                   ii.   Screen planting (minimum 20L pot size) along all boundaries planted
                         at maximum 3 metre centres with a maximum 3 metre height at
                         maturity.
        16.   All landscape works must be established and maintained in accordance with the
              approved design for the life of the development, and in a manner that ensures

                                                                                  Page 8 of 15

Section 9

GENERAL COMMITTEE MEETING MINUTES                                                  16 MAY 2022


                 healthy, sustained and vigorous plant growth. All plant material must be allowed
                 to grow to full form and be refurbished when its life expectancy is reached.
          17.    The site must be regularly maintained at all times with all landscape works
                 maintained generally in accordance with the approved design for the life of the
                 development.
          Damage to infrastructure
          18.    Any damage to footpaths, street plantings, natural vegetation/trees kerb and
                 channel, bridges or roadways must be repaired or reinstated to at least pre-
                 existing conditions.
          Stormwater Drainage
          19.    Stormwater runoff from the development must be disposed of on-site without
                 causing scour or damage to the subject site or any adjoining property.
     B.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
     C.   Advise the applicant to remove the demountable building (the former exchange
          building) or obtain building approval within 90 days of the date of this approval.
     D.   Find the following matters relevant to the assessment and sufficient reason to approve
          the application:
          1.     The proposal is minor in nature and is co-located within a site with existing
                 telecommunication facilities.
          2.     The proposal can be conditioned to comply with the amenity and character
                 elements sought by the Overall Outcomes in the Noosa Plan 2020.
                                                                      Carried unanimously.
The meeting adjourned at 12.31pm.
The meeting resumed at 12.40pm.


7    OPW22/0029 DEVELOPMENT APPLICATION FOR OPERATIONAL WORKS
     (PRESCRIBED TIDAL WORKS – NOOSA RIVER OYSTER HABITAT RESTORATION)
     FOR NOOSA RIVER
     Motion
     Moved:          Cr Wilkie
     Seconded:       Cr Stockwell
     That Council note the report by Coordinator Engineering to the General Committee Meeting
     dated 16 May 2022 regarding Application No. OPW22/0029 for Operational Works
     (Prescribed Tidal Works – Noosa River Oyster Habitat Restoration for Noosa River and
     A.   Approve the application in accordance with Referral Agency Conditions provided by
          SARA on 7 April 2022 and the following conditions:
          Approved Plans
          1.     Phase 1 – Pilot Phase is only approved as part of this development approval.
          2.     Development undertaken in accordance with this approval must generally comply
                 with the approved plans of development. The approved plans are listed in the
                 following table unless otherwise amended by these conditions.
               Plan No.          Rev.   Plan/Document Name                            Date
               NROR-2021-00      A      General Notes & Site Selection                09/07/2021
               NROR-2021-01      -      Restoration Zones                             20/05/2021
               NROR-2021-02      A      Module Designs                                09/07/2021

                                                                                   Page 9 of 15

Section 10

GENERAL COMMITTEE MEETING MINUTES                                                    16 MAY 2022


             NROR-2021-03       A       Goat Island Restoration Site                    09/07/2021
             NROR-2021-04       A       Tewantin Island Restoration Site                09/07/2021
             NROR-2021-05       A       Noosa Sound West Restoration Site               09/07/2021
             NROR-2021-06       A       Noosa Sound East Restoration Site               09/07/2021
        Currency Period
        3.     The development approval lapses if the works have not been substantially
               started by 19 May 2024, unless an application to extend the currency period is
               approved by Council.
        General Conditions
        4.     All works must be undertaken in accordance with the Noosa Oyster Restoration
               Project – Project Restoration Plan prepared by The Nature Conservancy dated
               January 2022.
        5.     All works must be undertaken in accordance with Maritime Safety Queensland
               (MSQ) and Department of Agriculture and Fisheries (DAF) requirements relating
               to signage and aids to navigation as detailed in the Noosa Oyster Restoration
               Project – Project Restoration Plan (Section 7) prepared by The Nature
               Conservancy dated January 2022.
        6.     All works must be undertaken in accordance with DAF requirements relating to
               notifications, marking of approved boundary areas and restoration of marine
               plants/tidal profiles that are temporarily impacted as a result of the works as
               detailed in the SARA Decision Notice.
        7.     All works must be undertaken in accordance with Best Practice Erosion and
               Sediment Control (BPESC) guidelines for Australia (International Erosion Control
               Association).
        8.     All works must be undertaken in accordance with Sections 6.1 and 6.4 of Noosa
               Oyster Ecosystem Restoration Project - Project Restoration Plan prepared by
               The Nature Conservancy Australia dated January 2022.
        9.     All works must be undertaken in accordance with the current Queensland Acid
               Sulfate Soil Technical Manual: Soil management guidelines, prepared by the
               Department of Science, Information Technology, Innovation and the Arts, 2014.
        10.    All materials used for construction works must be clean materials to ensure that
               the works do not contaminate the waterway.
        11.    All structures must be designed and constructed such that they are free standing
               within the waterway and are not connected to or behind the revetment wall.
        12.    All structures must have no detrimental effects on stormwater drains and/or
               easements.
        13.    In the event of collapse or failure of structural integrity of the oyster restoration
               substrates, the works must be removed from the waterway or reconstructed in
               accordance with this development approval.
        14.    All works must be undertaken in accordance with an approved Construction
               Environmental Management Plan (CEMP) which consolidates the commitments
               and management measures described in the Noosa Oyster Ecosystem
               Restoration Project – Project Restoration Plan including, but not limited to:
               a.    A Site Management Plan which describes environmental management
                     measures at the proposed load out site including details of stockpile
                     management;
               b.    An Erosion and Sediment Control Plan (ESCP) in accordance with BPESC
                     guidelines;

                                                                                    Page 10 of 15

Section 11

GENERAL COMMITTEE MEETING MINUTES                                                  16 MAY 2022


                c.   A Marine Plant and Water Quality Monitoring Plan designed to monitor the
                     composition of marine plant assemblages at habitat restoration sites and
                     appropriate sites upstream and downstream; and
                d.   A Marine Biosecurity Management Plan for construction vessels.
                The CEMP should be submitted to Council for approval 20 business days prior
                to the commencement of works.
         15.    A monitoring report must be provided to Council on a six-monthly basis for the
                first year (and annually for the following 4 years) following completion of
                construction works which details the results of restoration monitoring and
                evaluation, including adaptive management measures taken and the success or
                otherwise of those measures.
         16.    Upon completion of construction works, any construction debris or waste must
                be removed from site and disposed of appropriately.
         17.    Lighting associated with the construction phase must be designed, installed,
                operated and maintained in accordance with Section 3 of AS4282 Control of the
                Obtrusive Effects of Outdoor Lighting.
         18.    Wastewater and sullage must only be disposed of at approved pumpout facilities.
         19.    Any construction and post construction activity must not impact on the condition
                of the waterway, and is to be conducted so as not to breach the Environmental
                Protection Act EPA (1994) and the Environmental Protection (Water) Policy
                2009.
         20.    Certification by a Registered Professional Engineer of Queensland that states
                that the oyster habitat restoration substrates are constructed in accordance with
                best practice methods and is structurally sound must be submitted to Council.
                This certification must be submitted to Council within three (3) months of the
                completion of the works.
         21.    After completion, the proposed works must be maintained in a sound state of
                repair in accordance with the approved plans
    B.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.


    Procedural Motion
    Moved:           Cr Finzel
    Seconded:        Cr Stewart
    That the item lay on the table until such time as the previous resolution from the Ordinary
    Meeting dated 21 April 2022 with audit details be received.

    The Procedural Motion was considered ultra vires and the Chair ruled the motion
    invalid.


    Procedural Motion
    Moved:           Cr Lorentson
    That the item lay on the table until the Ordinary Meeting dated 19 May 2022.

    Cr Lorentson withdrew the motion.




                                                                                   Page 11 of 15

Section 12

GENERAL COMMITTEE MEETING MINUTES                                                 16 MAY 2022


    Committee Recommendation
    Moved:          Cr Wilkie
    Seconded:       Cr Stockwell
    That Council note the report by Coordinator Engineering to the General Committee Meeting
    dated 16 May 2022 regarding Application No. OPW22/0029 for Operational Works
    (Prescribed Tidal Works – Noosa River Oyster Habitat Restoration for Noosa River and
    A.   Approve the application in accordance with Referral Agency Conditions provided by
         SARA on 7 April 2022 and the following conditions:
         Approved Plans
         1.     Phase 1 – Pilot Phase is only approved as part of this development approval.
         2.     Development undertaken in accordance with this approval must generally comply
                with the approved plans of development. The approved plans are listed in the
                following table unless otherwise amended by these conditions.
              Plan No.          Rev.   Plan/Document Name                            Date
              NROR-2021-00      A      General Notes & Site Selection                09/07/2021
              NROR-2021-01      -      Restoration Zones                             20/05/2021
              NROR-2021-02      A      Module Designs                                09/07/2021
              NROR-2021-03      A      Goat Island Restoration Site                  09/07/2021
              NROR-2021-04      A      Tewantin Island Restoration Site              09/07/2021
              NROR-2021-05      A      Noosa Sound West Restoration Site             09/07/2021
              NROR-2021-06      A      Noosa Sound East Restoration Site             09/07/2021
         Currency Period
         3.     The development approval lapses if the works have not been substantially
                started by 19 May 2024, unless an application to extend the currency period is
                approved by Council.
         General Conditions
         4.     All works must be undertaken in accordance with the Noosa Oyster Restoration
                Project – Project Restoration Plan prepared by The Nature Conservancy dated
                January 2022.
         5.     All works must be undertaken in accordance with Maritime Safety Queensland
                (MSQ) and Department of Agriculture and Fisheries (DAF) requirements relating
                to signage and aids to navigation as detailed in the Noosa Oyster Restoration
                Project – Project Restoration Plan (Section 7) prepared by The Nature
                Conservancy dated January 2022.
         6.     All works must be undertaken in accordance with DAF requirements relating to
                notifications, marking of approved boundary areas and restoration of marine
                plants/tidal profiles that are temporarily impacted as a result of the works as
                detailed in the SARA Decision Notice.
         7.     All works must be undertaken in accordance with Best Practice Erosion and
                Sediment Control (BPESC) guidelines for Australia (International Erosion Control
                Association).
         8.     All works must be undertaken in accordance with Sections 6.1 and 6.4 of Noosa
                Oyster Ecosystem Restoration Project - Project Restoration Plan prepared by
                The Nature Conservancy Australia dated January 2022.
         9.     All works must be undertaken in accordance with the current Queensland Acid
                Sulfate Soil Technical Manual: Soil management guidelines, prepared by the
                Department of Science, Information Technology, Innovation and the Arts, 2014.
         10.    All materials used for construction works must be clean materials to ensure that
                the works do not contaminate the waterway.

                                                                                 Page 12 of 15

Section 13

GENERAL COMMITTEE MEETING MINUTES                                                    16 MAY 2022


         11.   All structures must be designed and constructed such that they are free standing
               within the waterway and are not connected to or behind the revetment wall.
         12.   All structures must have no detrimental effects on stormwater drains and/or
               easements.
         13.   In the event of collapse or failure of structural integrity of the oyster restoration
               substrates, the works must be removed from the waterway or reconstructed in
               accordance with this development approval.
         14.   All works must be undertaken in accordance with an approved Construction
               Environmental Management Plan (CEMP) which consolidates the commitments
               and management measures described in the Noosa Oyster Ecosystem
               Restoration Project – Project Restoration Plan including, but not limited to:
               a.    A Site Management Plan which describes environmental management
                     measures at the proposed load out site including details of stockpile
                     management;
               b.    An Erosion and Sediment Control Plan (ESCP) in accordance with BPESC
                     guidelines;
               c.    A Marine Plant and Water Quality Monitoring Plan designed to monitor the
                     composition of marine plant assemblages at habitat restoration sites and
                     appropriate sites upstream and downstream; and
               d.    A Marine Biosecurity Management Plan for construction vessels.
               The CEMP should be submitted to Council for approval 20 business days prior
               to the commencement of works.
         15.   A monitoring report must be provided to Council on a six-monthly basis for the
               first year (and annually for the following 4 years) following completion of
               construction works which details the results of restoration monitoring and
               evaluation, including adaptive management measures taken and the success or
               otherwise of those measures.
         16.   Upon completion of construction works, any construction debris or waste must
               be removed from site and disposed of appropriately.
         17.   Lighting associated with the construction phase must be designed, installed,
               operated and maintained in accordance with Section 3 of AS4282 Control of the
               Obtrusive Effects of Outdoor Lighting.
         18.   Wastewater and sullage must only be disposed of at approved pumpout facilities.
         19.   Any construction and post construction activity must not impact on the condition
               of the waterway, and is to be conducted so as not to breach the Environmental
               Protection Act EPA (1994) and the Environmental Protection (Water) Policy
               2009.
         20.   Certification by a Registered Professional Engineer of Queensland that states
               that the oyster habitat restoration substrates are constructed in accordance with
               best practice methods and is structurally sound must be submitted to Council.
               This certification must be submitted to Council within three (3) months of the
               completion of the works.
         21.   After completion, the proposed works must be maintained in a sound state of
               repair in accordance with the approved plans
    B.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
    For:            Crs Stockwell, Wilkie, Jurisevic and Wegener
    Against:        Crs Finzel, Lorentson and Stewart
                                                                                          Carried.

                                                                                    Page 13 of 15

Section 14

GENERAL COMMITTEE MEETING MINUTES                                                    16 MAY 2022


8    FINANCIAL PERFORMANCE REPORT – APRIL 2022
     Committee Recommendation
     Moved:            Cr Jurisevic
     Seconded:         Cr Finzel
     That Council note the report by the Financial Services Manager (Acting) to the General
     Committee Meeting dated 16 May 2022 outlining April 2022 year to date financial
     performance against budget, including changes to the financial performance report with the
     inclusion of key financial sustainability indicators.
                                                                         Carried unanimously.



9    OPERATIONAL PLAN PROGRESS REPORT – THIRD QUARTER 2021-22
     The following material was presented to the meeting in relation to this item:
          Cr Stockwell – refer to Attachment 1 - image
     Committee Recommendation
     Moved:           Cr Stewart
     Seconded:        Cr Finzel
     That Council note the report by the Chief Executive Officer to the General Committee Meeting
     dated 16 May 2022 regarding the 2021-22 Operational Plan and:
     A.     Note the progress report for the 2021-22 Operational Plan to 31 March 2022 provided
            as Attachment 1; and
     B.     Note the status of Council’s Key Performance Indicators provided as Attachment 2.
                                                                          Carried unanimously.




7.   CLOSED SESSION
     Nil.




The meeting closed at 2.12pm.




                                                                                     Page 14 of 15

Section 15

GENERAL COMMITTEE MEETING MINUTES   16 MAY 2022


                                    Attachment 1




                                    Page 15 of 15

GENERAL COMMITTEE MEETING MINUTES                                     16 MAY 2022

                                                                      Attachment 1

    THE APPROACH?                                                           =>

                       fad fod
        —_/    —a       tenttettne NO         es    Different stakeholders and
      oo                    — a)                    perspectives
      Oo °       DESTINATION      pe,         a Common goal
        Vas ho                  ieabnabines
            Ti~T   i my     Ss
              i ?: ES on a na                 au visitor destination for future
              ;                                     Well-managed, sustainable

                     DESTINATION MANAGEMENT
                          COLLECTIVE OWNERSHIP

                  This is about a ONE Community approach

                                                                      Page 15 of 15

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.