GENERAL COMMITTEE MEETING MINUTES                                                    16 MAY 2022


         11.   All structures must be designed and constructed such that they are free standing
               within the waterway and are not connected to or behind the revetment wall.
         12.   All structures must have no detrimental effects on stormwater drains and/or
               easements.
         13.   In the event of collapse or failure of structural integrity of the oyster restoration
               substrates, the works must be removed from the waterway or reconstructed in
               accordance with this development approval.
         14.   All works must be undertaken in accordance with an approved Construction
               Environmental Management Plan (CEMP) which consolidates the commitments
               and management measures described in the Noosa Oyster Ecosystem
               Restoration Project – Project Restoration Plan including, but not limited to:
               a.    A Site Management Plan which describes environmental management
                     measures at the proposed load out site including details of stockpile
                     management;
               b.    An Erosion and Sediment Control Plan (ESCP) in accordance with BPESC
                     guidelines;
               c.    A Marine Plant and Water Quality Monitoring Plan designed to monitor the
                     composition of marine plant assemblages at habitat restoration sites and
                     appropriate sites upstream and downstream; and
               d.    A Marine Biosecurity Management Plan for construction vessels.
               The CEMP should be submitted to Council for approval 20 business days prior
               to the commencement of works.
         15.   A monitoring report must be provided to Council on a six-monthly basis for the
               first year (and annually for the following 4 years) following completion of
               construction works which details the results of restoration monitoring and
               evaluation, including adaptive management measures taken and the success or
               otherwise of those measures.
         16.   Upon completion of construction works, any construction debris or waste must
               be removed from site and disposed of appropriately.
         17.   Lighting associated with the construction phase must be designed, installed,
               operated and maintained in accordance with Section 3 of AS4282 Control of the
               Obtrusive Effects of Outdoor Lighting.
         18.   Wastewater and sullage must only be disposed of at approved pumpout facilities.
         19.   Any construction and post construction activity must not impact on the condition
               of the waterway, and is to be conducted so as not to breach the Environmental
               Protection Act EPA (1994) and the Environmental Protection (Water) Policy
               2009.
         20.   Certification by a Registered Professional Engineer of Queensland that states
               that the oyster habitat restoration substrates are constructed in accordance with
               best practice methods and is structurally sound must be submitted to Council.
               This certification must be submitted to Council within three (3) months of the
               completion of the works.
         21.   After completion, the proposed works must be maintained in a sound state of
               repair in accordance with the approved plans
    B.   Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
    For:            Crs Stockwell, Wilkie, Jurisevic and Wegener
    Against:        Crs Finzel, Lorentson and Stewart
                                                                                          Carried.

                                                                                    Page 13 of 15
Log in to download the original file

2022-05-16 General Committee Meeting Minutes(PDF, 467KB).pdf · 478 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.