Original source · versioned page text
2022-05-16 General Committee Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING MINUTES 16 MAY 2022
11. All structures must be designed and constructed such that they are free standing
within the waterway and are not connected to or behind the revetment wall.
12. All structures must have no detrimental effects on stormwater drains and/or
easements.
13. In the event of collapse or failure of structural integrity of the oyster restoration
substrates, the works must be removed from the waterway or reconstructed in
accordance with this development approval.
14. All works must be undertaken in accordance with an approved Construction
Environmental Management Plan (CEMP) which consolidates the commitments
and management measures described in the Noosa Oyster Ecosystem
Restoration Project – Project Restoration Plan including, but not limited to:
a. A Site Management Plan which describes environmental management
measures at the proposed load out site including details of stockpile
management;
b. An Erosion and Sediment Control Plan (ESCP) in accordance with BPESC
guidelines;
c. A Marine Plant and Water Quality Monitoring Plan designed to monitor the
composition of marine plant assemblages at habitat restoration sites and
appropriate sites upstream and downstream; and
d. A Marine Biosecurity Management Plan for construction vessels.
The CEMP should be submitted to Council for approval 20 business days prior
to the commencement of works.
15. A monitoring report must be provided to Council on a six-monthly basis for the
first year (and annually for the following 4 years) following completion of
construction works which details the results of restoration monitoring and
evaluation, including adaptive management measures taken and the success or
otherwise of those measures.
16. Upon completion of construction works, any construction debris or waste must
be removed from site and disposed of appropriately.
17. Lighting associated with the construction phase must be designed, installed,
operated and maintained in accordance with Section 3 of AS4282 Control of the
Obtrusive Effects of Outdoor Lighting.
18. Wastewater and sullage must only be disposed of at approved pumpout facilities.
19. Any construction and post construction activity must not impact on the condition
of the waterway, and is to be conducted so as not to breach the Environmental
Protection Act EPA (1994) and the Environmental Protection (Water) Policy
2009.
20. Certification by a Registered Professional Engineer of Queensland that states
that the oyster habitat restoration substrates are constructed in accordance with
best practice methods and is structurally sound must be submitted to Council.
This certification must be submitted to Council within three (3) months of the
completion of the works.
21. After completion, the proposed works must be maintained in a sound state of
repair in accordance with the approved plans
B. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
For: Crs Stockwell, Wilkie, Jurisevic and Wegener
Against: Crs Finzel, Lorentson and Stewart
Carried.
Page 13 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.