Other Change Decision Notice - Council Meeting Decision 51998 2462 07
h. The storage area above the Manager’s unit, shown on drawing WD-18D is to be
deleted.
i. The design of the Porte Cochere must have a clearance of 4.1 metres over the
driveway, to allow for the passage of refuse vehicles.
j. The vehicle hire premises/airconditioning building is to be roofed in a design
sympathetic to other roof structures proposed for the site.
k. The developer is advised to meet with Council’s Building Department staff, prior
to lodging an application for a Development Permit for building works.
3. Provision of at least 104 off-street carparking spaces, comprising 102 covered spaces
and 2 uncovered spaces, and access thereto which are to be provided with a sealed
pavement and designed, drained, constructed and maintained in accordance with the
Planning Scheme, Australian Standard 2890.1 1993 edition, Council's Policies and to
the reasonable satisfaction of the Shire Engineer. Plans and specifications for these
works are to be submitted to the Shire Engineer for approval in conjunction with the
Building Application. In this regard, a grease/oil arrestor is to be installed in the wash
down bay to ensure that polluted run off does not enter Council’s stormwater drainage
system. A Building Approval shall not be granted until the Shire Engineer has approved
of the carparking and access scheme.
All carparking designs and grades shall conform with Australian Standard 2890.1 1993
edition.
The pavement and kerb below the Porte Cochere is to be widened to improve the
capability of this area to allow for two vehicles to park under the Porte Cochere and for
the passage of vehicles over the remainder of the driveway.
4. There is to be no detrimental effect upon the amenity of the neighbourhood by reason
of the creation of excessive noise, lighting nuisance or other emissions.
5. No pile driving is permitted to be undertaken on Lot 12 on RP 122292 (fronting Natasha
Avenue).
6. The construction work force shall be directed to park their vehicles in an area nominated
by the Shire Engineer. The developer shall comply with any reasonable directions from
the Shire Engineer, in regard to compliance with this condition by contractors involved
in the construction.
7. Parking and off loading of vehicles for construction purposes shall be carried out in
accordance with the requirements and directions of the Shire Engineer. During the
construction period, building materials, plant, etc shall not be stored on any footpath so
as to cause a nuisance to pedestrian traffic. All directions from the Shire Engineer on
this matter shall be complied with.
8. Any crane operated on the site for a period of more than five (5) days shall be powered
by electric motors only.
9. Staff of the complex are to be permitted to park on site in specially marked bays. The
management of the complex are not to direct staff to park off site.
10. Deleted.
11. Deleted.
12. No carparking areas are to be used for purposes (including any temporary storage of
goods or equipment) other than carparking.
13. Deleted.
14. All pool pumps and servicing equipment shall be located away from nearby residential
buildings on adjoining sites and shall be adequately soundproofed.
Page 3 of 12
Document Set ID: 23198628
Version: 6, Version Date: 22/08/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.