Original source · versioned page text
5255NSCResponse
Attached to the e-mail RAL20/0025 - Response to Information Request.
The original of this document is very large (10.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
_w Callaghan & Toth 3 CONCLUSIONS & RECOMMENDATIONS We conclude that a 3m wide drainage easement over the existing stormwater pipe is feasible for the site. This drainage easement can be shaped to form an overland flow path suitable for conveying the balance of flow from 1% AEP up to when the river flood takes over the inundation of the land. We recommend that Council adopt the proposal to provide a 1% AEP overland flow path and easement as shown on our plans 2103-01 to 04. 2103 19 Key Ct SWMP February 2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.