Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Acid sulfate Management Plan Reference Document OPW19-0239 · OPW19/0239

of 26

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Gympie Terrace Noosaville Pty Ltd



2)   Nature of concern: Detail of issue, date of incident, people involved, and location.

3)   Action taken or required: Any action proposed or undertaken to address the concern, including time and
     date.
4)   Response to action: Was the complainant satisfied with the outcome of the actions taken, if not, what
     else needs to be done, or is it outside the scope of the development works.

5)   Prevention or re-occurrence: What action has been taken by the nominated responsible person to
     ensure the problem will not re-occur.

11.0 TRAINING
All site staff of Mosaic, and contractors, will be required to undergo a site induction covering all the elements
of the ASS MP. The induction will aim to instil environmental awareness by personnel including:

      Introduce and explain the duty of care required under the Environmental Protection Act 1994.

      Introduce the ASS MP and the responsibilities it places on all contractors and consultants.

      Explain the various subordinate components of the ASS MP and the reporting and monitoring
       procedures of the ASS MP and how they work.

      Explain how to use the environmental procedures and plans in the ASS MP.
The content of the induction program will be endorsed and presented by the Site Supervisor, or delegate.

12.0 LIMITATIONS
Should you require any further information please contact the undersigned. We draw your attention to the
document, Limitations, which is included in Appendix C.




J000799-003-R-Rev0                                                                                    Page 5

Used in these records

About this file

File size
8.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Acid sulfate Management Plan Reference Document OPW19-0239.pdf · 8.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.